IR 05000206/1985020
| ML13323B046 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 11/05/1985 |
| From: | Kirsch D NRC/IE, NRC/RGN-V |
| To: | Baskin K Southern California Edison Co |
| Shared Package | |
| ML13323B048 | List: |
| References | |
| NUDOCS 8511110244 | |
| Download: ML13323B046 (1) | |
Text
NOV 0 5 1985 Docket No. 50-206 Report No. 50-206/85-20 Southern California Edison Company P. 0. Box 800 2244 Walnut Grove Avenue Rosemead, California 91770
Attention: Kenneth P. Baskin, Vice President Nuclear Engineering,.Safety and Licensing Department Gentlemen:
Thank you for your letter dated September 3, 1985, informing us of the steps you have taken to correct the item which we brought to your attention in our letter dated August 6, 1985. Your corrective actions will be verified during a future inspectio Your letter requested that we reevaluate the severity level assigned to the violation, noting that the intent of regulatory requirements for dual verification of valve position had been satisfied in the instance cite However, the Notice of Violation.cited the failure of a knowledgeable supervisor (SRO) to follow approved procedures, in a manner which under other circumstances could have resulted in a lack of required dual verificatio This and other recent examples of failure to follow procedures have indicated a need for additional attention to this area. After reevaluation, we have therefore concluded that the Severity Level IV assigned to this violation remains vali Your cooperation with us is appreciate Origino! signed by
Sincerely,
'
A F.2 Kirsc D. F. Kirsch, Acting Director Division of Reactor Safety and Projects cc:
D. J. Fogarty, SCE H. B. Ray, SCE (San Clemente)
H. E. Morgan, SCE (San Clemente)
State of CA bcc:
RSB/Document Control Desk (RIDS)
Mr. J. Martin Mr. B. Faulkenberry Resident Inspector RV PNarbut:dh PJohnson AChaffee AJohnson DKir C 11/
/85 11/-
/85 11// /85 11/
/8 11/
/85 POR ADOCK 0 5000206 G
QPDR L
0%A tA