IR 05000155/1982011

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-155/82-11 on 820628-0701.No Noncompliance Noted.Major Areas Inspected:Radiation Protection Activities, Effluent Control Instrumentation,Testing of Air Cleaning Sys,Reactor Coolant Water Quality & License Audits
ML20062D172
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 07/19/1982
From: Greger L, Lovendale P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20062D144 List:
References
50-155-82-11, NUDOCS 8208050478
Download: ML20062D172 (6)


Text

-. _

.

.

U.S. NUCLEAR REGULATORY C0ll>11SSION

REGION III

Report No. 50-155/82-11(DETP)

Docket No. 50-155 License No. DPR-6 Licensee: Consumers Power Company 212 West Flichigan Avenue l

Jackson, ?!I 49201 l

'

Facility Name:

Big Rock Point Nuclear Plant l

'

Inspection At: Big Rock Point Site, Charlevoix, ?ll

!

Inspection Conducted: June 28-July 1, 1982 sdhA Inspector:

P. C. Lovendale 7 /f # A.

de. M /#

f/8R Approved By:

L. R. Greger, Chief

Facilities Radiation

'

'

Protection Section Inspection Summary Inspection on June 28-July 1, 1982 (Report No. 50-155/82-11(DETP))

Areas Inspected: Routine, unannounced inspection of operational radiation protection activities including: effluent control instrumentation; testing of air cleaning systems; reactor coolant water quality; licensee audits; radiation protection procedures; radiological qualification and training; exposure control; transportation activities; and in-plant radiation protec-tion program. The inspector also reviewed the licensee's actions taken in response to previous inspection findings. The inspection involved 28 inspector-hours onsite by one NRC inspector.

Results: No items of noncompliance or deviations were identified.

l l

8208050478 820721 PDR ADOCK 05000155 G

PDR 6J.

i

,i.. -

-

-

- - _ _ - - - - - -

-

_

_ _ - _ _ _ _ _ _ - _

________ -

.

.

DETAILS 1.

Persons Contacted

  • D.

P. Hoffman, Plant Superintendent-

  • J. Epperson, Associate Health Physicist
  • M.

Dickson, General Health Physicist

  • G.

Fox, Chemistry and Radiation Protection Supervisor

  • J. Warner, Radiation Protection and Chemistry Supervisor
  • T.

Loudenslager, Chemistry and Health Physics Instructor The inspector also contacted other licensee employees, including chemistry and radiation protection technicians and members of the quality assurance staff.

  • Denotes those present at the exit meeting.

2.

General This inspection, which began with a plant tour and visual observation of posting, labeling, and access controls at 8:00 a.m. on June 28, 1982, was conducted to examine routine aspects of the radiation pro-tection program during normal operations. During this and other tours, the inspector used an NRC survey instrument (Xetex 305-B) to monitor selected areas throughout the plant. Measurements made were in agreement with posted survey data. Area postings, and access controls were good.

3.

Licensee Action on Previous Inspection Findings (Closed) Open Item (155/81-11-04):

Review the progress of chemistry and radiation protection technician training program. The licensee continues to send junior and senior technicians to 12-week basic and advanced chemistry and health physics courses at the Midland plant as time permits. No further problems were noted.

(Closed) Open Item (155/81-11-05; 155/81-11-03):

Significant weaknesses exist in the RWP-exempt program. As noted in Inspectipn Report No.

50-155/82-04(DETP), the licensee has committed to implementation of a new radiation work permit (RWP) program which conforms to the corporate standards by September 30, 1982. This new program will eliminate the present RWP-exempt program.

(Closed) Open Item (155/81-11-06):

Improvements needed in the personal contamination monitoring program. The licensee is continuing to relocate or shield friskers that are located in high background areas. Also, more sensitive friskers have been purchased to replace old and less sensitive ones. No further problems were noted.

(Closed) Bulletin (155/80-10-BB):

" Contamination of Nonradioactive Systems and Resulting Potential for Unmonitored Uncontrolled Release

,

.

.

..

.

.

.

of Radioactivity to Environment." During a previous inspection *, it was noted that additional information was needed to assess the licensee's actions taken in response to this bulletin. That information was provided in a letter dated December 19, 1980. No further problems were noted.

4.

Effluent Controls Instrumentation The inspector reviewed records of effluent monitoring system calibrations and functional tests conducted to meet technical specification require-ments.

Records for 1981 and 1982 to date were reviewed; no problems were noted.

A review of effluent monitor trip and alarm setpoints indicated com-pliance with technical specification requirements.

No items of noncompliance or deviations were identified.

5.

Testing of Air Cleaning Systems

As noted in a previous inspection, the stack and laboratory ventilation llEPA filters are not tested in place in accordance with the recommenda-tions of Regulatory Guide 1.140, " Design, Testing, and Maintenance Criteria for Normal Ventilation Exhaust System Air Filtration and Adsorption Units of Light-Water-Cooled-Nuclear Power Plants." This matter was discussed during the exit meeting and will be reviewed during a future inspection.

(155/82-11-01)

No items of noncompliance or deviations were identified.

6.

Reactor Coolant Water Quality The inspector reviewed selected licensee records to determine compliance with technical specification requirements for reactor coolant periodic

tests, chemical control, and radioactivity control. Records from CY

!

1981 to date were reviewed; no problems were noted.

No items of noncompliance or deviations were identified.

7.

Licensee Audits The inspector reviewed licensee audits of the radiation protection program and corrective measures for identified problems.

The audits reviewed included:

an audit of packaging and shipping greater than Type A quantities of radioactive material; an audit of radioactive material control; and an audit of the radiation protection program.

All of the above audits were conducted by the Quality Assurance Group on site during 1981.

Inspection Report No. 50-155/80-16.

Inspection Report No. 50-155/80-04.

!

_

_

f

.

.

The licensee was responsive to identified problems and corrective actions appeared effective.

8.

Radiation Protection Procedures The inspector reviewed changes to radiation protection procedures issued in 1981 and 1982 to date. The changes appear to be consistent with regulatory requirements and good health physics practices. No problems were noted.

9.

Radiological Qualifications The inspector reviewed recent changes to the Chemistry and Health Physics Group. A health physicist was added to the staff in early 1982. He previously worked for the corporate office. The current staff qualifica-tions are listed below. No problems were noted.

Plant Related Position Degree Experience Experience Plant Health Physicist None 20 yrs.

Associate Health BS 0.5 yrs.

2 yrs.

Physicist General Health AS 1.5 yrs.

4.5 yrs.

Physicist Chemistry and Radiation BS 20 yrs.

5 yrs.

Protection Supervisor Radiation Protection None 7 yrs.

and Chemistry Supervisor The licensee currently has 14 chemistry and radiation protection technicians. Of these, 6 hold BS degrees, 4 hold AS degrees, and 4 are not degreed. Although the technicians' average education is high, the experience level is low.

Only 3 technicians have greater than 2 years of operating plant experience.

No items of noncompliance or deviations were identified.

10.

External Exposure Control The licensee's personal monitoring program remains as previously described'. The inspector selectively reviewed exposure records for 1981 and 1982 to date. No problems were noted.

Pocket dosimeter /TLD comparisons were reviewed. No problems were noted.

Inspection Report No. 50-155/80-04.

.

.

No items of noncompliance or deviations were identified.

11.

Internal Exposure Control The licensee's program for control of internal exposures includes reduction of surface contamination levels and use of engineering controls, protective clothing and equipment, survey information, and stay-time calculations. Whole body counting is used to supplement the routine monitoring program to ensure its effectiveness.

Whole body counting data, respiratory protection training records, MPC-hour determinations, and air activity surveys from January 1981 to date were reviewed. No exposures greater than the 40 MPC-hour control measure were indicated.

No items of noncompliance or deviations were identified.

12.

In-Plant Radiation Protection Program a.

Surveys The inspector selectively reviewed radiation, contamination, and airborne radioactivity surveys conducted to meet surveillance requirements and determine radiation work permit requirements.

No problems were noted.

,

b.

Posting and Access Controls The inspector reviewed radiation, high radiation, and contamina-tion area postings within the plant controlled area. All postings appeared to meet the requirements of 10 CFR 20.203.

c.

Release of Materials for Unrestricted Use The licensee's procedures for release of materials for unrestricted use were reviewed. The licensee does not release materials for unrestricted use if any detectable activity is found using current state-of-the-art equipment and methods.

Equipment sensitivities are greather than or equal to the minimum sensitivities noted in IE Circular No. 81-07.

No items of noncompliance or deviations were identified.

13.

Transportation Activities The inspector reviewed the licensee's program for receipt, packaging,

.

and transport of radioactive materials.

Procedure RM-53, Revision 7,

" Radioactive Materials Shipments," was found to be consistent with the

!

requirements of 49 CFR 170-189, 10 CFR 71 and burial site criteria; no problems were noted.

_.

.

e

.

The inspector monitored the final preparations for a shipment of segmented fuel rods on June 28, 1982.

No problems were noted.

Records of shipments from Janu.cy 1981 to date were reviewed. No problems were noted.

No items of noncompliance or deviations were identified.

14.

Exit Meeting The inspector met with licensee representatives (denoted in Section 1) at the conclusion of the inspection on July 1, 1982. The inspector summarized the scope and findings of the inspection.

In response to certain items discussed by the inspector, the licensee:

a.

Stated that the recommendations of Regulatory Guide 1.140 con-corning in place testing of IIEPA filters would be reviewed.

l l