Forwards IE Insp Rept 50-155/82-11 on 820628-0701.No Noncompliance Noted
ML20062D140
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 07/21/1982
From: John Miller
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dewitt R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML20062D144 List:
References
NUDOCS 8208050462
Download: ML20062D140 (2)


See also: IR 05000155/1982011

Text

-

_------

.

'

IE HQ Rt..E COPT

JUL 211982

Docket No. 50-155

Consumers Power Company

ATTN:

Mr. R. B. DeWitt

Vice President

Nuclear Operations

212 West Michigan Avenue

Jackson, MI 49201

Gentlemen:

This refers to the routine safety inspection conducted by Mr. P. C. Lovendale

of this of fice on June 28-July 1, 1982, of activities at the Big Rock Point

Nuclear Plant authorized by NRC Operating License No. DPR-06 and to the

discussion of our findings with Mr. D. Hoffman and others of your staff at

the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you (or

your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within ten (10)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such information.

If your receipt of this letter has been delayed such that less than seven (7)

days are available for your review, please notify this office promptly so that

a new due date may be established.

Consistent with Section 2.790(b)(1), any

such application must be accompanied by an affidavit executed by the owner of

the information which identifies the document or part sought to be withheld,

and which contains a full statement of the reasons which are the bases for the

'[3H)3 .

e208050462 820721

3?ob

PDR ADOCK 05000155

O

PDR

. - - _ _ _ _ _ _ _ _ _

-_

.

.

Consumers Power Company

2

JUL 211982

claim that the information should be withheld from public disclosure. This

section further requires the statement to address with specificity the con-

siderations listed in 10 CFR 2.790(b)(4). The information sought to be

withheld shall be incorporated as far as possible into a separate part of the

affidavit.

If we do not hear from you in this regard within the specified

periods noted above, a copy of this letter and the enclosed inspection report

will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Olginal Q_by 3, g,

J. R. Miller, Chief

Technical Inspection Branch

Enclosure:

Inspection Report

No. 50-155/82-11(DETP)

cc w/ enc 1:

D. J. VandeWalle, Nuclear

Licensing Administrator

C. J. Hartman, Plant

Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Ronald Callen, Michigan