IE Insp Rept 50-029/81-17 on 811007.No Noncompliance Noted. Major Areas Inspected:Plant Operation,Refueling Operations, Maint,Surveillance & Inservice Testing
ML20039A079
Person / Time
Site: Yankee Rowe
Issue date: 11/30/1981
From: Foley T, Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20039A069 List:
References
50-029-81-17, 50-29-81-17, NUDOCS 8112160201
Download: ML20039A079 (2)


Text

,, _

6-.

.c

-.

i

-

A-

'

u U.S. NUCLEAR REGULATORY COMMISSION-OFFICE OF INSPECTION AND ENFORCEMENT Region I Rcoort No. 50-29/81-17 Docket No. 50-29 License No. DPR-3 Priority Category.

C

--

_

Licensee:

Yankee Atomic Electric Company 1671 Worcester Road Framingham,-Massachusetts 01701 Facility Name:

Yankee Nuclear Power Station (Yankee Rowe)

Mee. ting At:

Rowe, Massachusetts Meeting Conducted: October 7, 1981 NRC Personne.

S

//.3 #!7/

T. Foley, Senior Resident Inspector date s(gned Yankec Rc e

.

date signed

_

//!3vh/

b Approved Py:

'i g

. M. Gallo, Chief, Reactor Projects Section ddte signed 1A, DRPI Meeting Summary:

Meeting on October 7, 1981 (Report No. 50-29/81-17)

Scope:

Special, announced management meeting to discuss the results of the Region I board convened to evaluate the licensee's performance from July 1, 1980 to June 30, 1981, as part of the NRC's SALP program. Areas addressed included: Plant Operations; Refueling-Operations; Maintenance: Surveillance and Inservice Testing; Personnel Training and Plant Procedures; Fire Protection and Housekeeping; Design Changes and Modifications; Radiation

. Protection, Radioactive Waste Management, and Transportation; Environmental Protection; Emergency Preparedness; Security and Safeguards; Audits, Reviews, and Committee Activities; Administration, QA and Records, Corrective Actions and Reporting.

_

Results: A summary of the licensee performance evaluation was presented.

kk2kh

0

Jo

., s DETAILS 1.

Licensee Attendees Mr. H. A. Autio, Plant Superintendent Mr. R. L. Berry, Plant Support Engineer Mr. L. H. Heider, Vice President, Operations and Engineering (YAEC)

Mr. J. A. Kay, Senior Engineer, Licensing Mr. D. E.-Moody, Manager of Operations (YAEC)

Mr. D. B. Pike, Manager of Operational Quality Assurance (YAEC)

Mr. L. L. Reed, Coordinator Operational Quality Assurance Mr. J. L. Staub, Technical Services Manager Mr. N. St. Laurent, Assistant Plant Superintendent Mr. J. E. Tribble, President (YAEC)

2.

NRC Attendees Mr. R. Caruso, Project Manager, Operating Reactors Branch 5, NRR Mr. T. Foley, Senior Resident-Inspector, Yankee Howe Mr. R. M. Gallo, Chief, Reactor Projects Section 1A, DRPI Mr. R. C. P;ynes, Regional Administrator, Region I Mr. R. Starostecki, Director, Division of Resident and Project Inspection

3.

Discussion A brief summary of the Systematic Appraisal of Licensee Performance (SALP) Program was presented to explain the basis and puipose of the

evaluation.

The NRC Region I evaluation' board meeting was-discussed, including the appraisal period, performance data and the results of the board's evaluation.

~

The SALP Cycle 2 evaluation report will be issued and distributed subsequent to NRC management's approval of SALP program changes which implement the Commission's guidance of October 20, 1981. This guidance is documented in NRC report NUREG-0834, "NRC Licensee Assessments."

,

&

w