IE Insp Rept 50-029/81-03 on 810302-06.No Noncompliance Noted.Major Areas Inspected:Security Plan,Program Audit & Organization,Protected & Vital Area Physical Barriers & Lighting.Details Withheld (Ref 10CFR2.790)
ML20004C711
Person / Time
Site: Yankee Rowe
Issue date: 04/16/1981
From: Devlin J, Dunlap J, Ladun R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20004C710 List:
References
50-029-81-03, 50-29-81-3, NUDOCS 8106040560
Download: ML20004C711 (1)


Text

&

-

]

U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INS?ECTION AND ENFORCEMENT 7 ~ *

.

'V

REGION I

Report No.

50-29/81-03

Docket No.

50-29 License No.

OPR-3 Safeguards Group _JV Licensee:

Yankee Atomic Electric Company 1671 Worcester Road i

Framingham, Massachusetts 01701 Facility Name:

Yankee Nuclear Power Station, Yankce Rowe Inspection At:

Rowe, Massachusetts-Inspection Conducted:

March 2-6, 1981 Date of Last Physical Secur.ty Inspection:

September 7-12, 1980 Type of Inspection:

Routine, Unannounced, Physical Protection inspectors: / [ W dt,v'

9-A E/

R. H. Ladun. Physical Protection Inspector date 11..

4/..

J l/

l n

,

,j.M.uunlap,vnysicalFrotectionInspector

/ /date'

'

~

)

date

.

/J.~

Lb.u

/0

'

Approved by L.Je/W. Devlin, Chief, Physical Protection

//datd ction, Technical Inspection Branch Inspection Summary:

Inspection on March 2-6, 1981 of the Physical Protection Program (Report No. 50-29/81-03)l Areas Inspected:

Securit/ Plan; Security Program Audit; Security Organization; Physical Barriers (Protected Area); Physical Barriers (Vital Area); Lighting; Access i

Control (Identification, Authorization and Badging); Access Control (Search); Access Control (Escorting); Access Control (Vital Areas); Alarm Stations, Detection Aids; Assessment Aids; Communications; Testing and Maintenance; Compensatory Measures; Power Supply,; Response; Locks, Keys and Combinations; Records and Reports; Foliawup on a previously identified item of noncompliance related to access control.

The inspection was initiated during non-regular hours and involved 58 inspector-hours on-site by two. regional basef inspectors; 8 inspector-hours were accomplished during offshift periods.

~ Results: The licensee was found to be in compliance with NRC requirements in all areas examined.

'