Forwards IE Insp Repts 50-029/79-13,50-271/79-18 & 50-309/79-16 on 791022-26 & 29-31.No Noncompliance Noted
ML19262C610
Person / Time
Site: Vermont Yankee, Yankee Rowe, Maine Yankee
Issue date: 12/19/1979
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Groce R
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML19262C611 List:
References
NUDOCS 8002140691
Download: ML19262C610 (2)


Text

.

.

.

j%

'JNITED STATES pm mac

/

(o NUCLEAR REs '3LATORY COMMtsslON

{

j v,(

g R 6110N I

-

C 631 PARK AVENUE

'"~

)I

[

KING OF PRUSSI A, PENNSYLVANIA 19406 g, v f

,

DEC 1 S 1979 Docket No. 50-271 Vermont Yankee Nuclear Power Corporation ATTN:

Mr. Robert H. Groce Licensing Engineer 20 Turnpike Road Westborough, Massachusetts 01581 Gentlemen:

Subject:

Inspection 50-271/79-18 This refers to the inspection conducted by Mr. G. Napuda and Mr. D. Kehoe of this office on October 22-26 and 29-31,1979 at your Vermont Yankee Nuclear Power Station, Vernon, Vermont, and Westborough, Massachusetts corporate offices of activities authorized by NRC License No. DPR-28 and to the discussions of our findings held by Mr. G. Napuda with Mr. L. Heider and other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection and Enforcement Inspection Report which is enclosed with this letter. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

If this report contains any infomation that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure. Any such application must be accompanied by an affida/it executed by the owner of the information, which identifies the document or part sought to be withheld, and which contains a statement of reasons which addresses with specificity the items which will be considered by the Commission as listed in subparagraph (b) (4) of Section 2.790.

The infomation sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit.

If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

R o osi no 6 '1/

.

.

Vermont Yankee Nuclear Power

DEC 1 9 1979 Corporation No reply to this letter is required; however, if you should have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

.

[.-

Eldon J.'Brunner, Chief Reactor Operations and Nuclear Support Branch Enclosure:

Office of Inspection and Enforcement Combined Inspection Report Numbers 50-29/79-13, 50-271/79-18, and 50-309/79-16 cc w/ encl:

W. F. Conway, Plant Superintendent Ms. J. Abbey, Technical Secretary