IP 71130, Security

From kanterella
Jump to navigation Jump to search

https://www.nrc.gov/docs/ML1726/ML17262A757.pdf

text

Issue Date: 08/23/18 1 71130

NRC INSPECTION MANUAL NSIR/DSO

INSPECTION PROCEDURE 71130

SECURITY

Effective Date: January 1, 2019

PROGRAM APPLICABILITY: IMC 2201 A

71130-01 INSPECTION OBJECTIVE

The objective of this inspection procedure (IP) is to gather information to determine whether a

licensee is meeting the objective of the security cornerstone, which is to provide assurance that

a power reactor licensee’s security system and material control and accounting program can

protect against the design basis threat (DBT) of radiological sabotage consistent with Title 10 of

the Code of Federal Regulations (10 CFR) Part 73, “Physical Protection of Plants and Materials,”

and the theft or loss of special nuclear material consistent with 10 CFR Part 74, “Material Control

and Accounting of Special Nuclear Material."

In meeting this objective, this procedure has provisions for verification and assessment of

licensee action with respect to Commission initiatives deemed necessary to address adequacy

in the protection of public health and safety and maintaining common defense and security at

operating power reactor facilities. Commission initiatives include Orders, rulemaking or other

action.

71130-02 INSPECTION REQUIREMENTS

02.01 Baseline inspection requirements are identified in and satisfied by the following

inspectable area attachments to this IP:

a. Access Authorization (IP 71130.01)

b. Access Control (IP 71130.02)

c. Contingency Response - Force-on-Force Testing (IP 71130.03)

d. Equipment Performance, Testing, and Maintenance (IP 71130.04)

e. Protective Strategy Evaluation and Performance Evaluation Program (IP 71130.05)

f. Protection of Safeguards Information (IP 71130.06)

g. Security Training (IP 71130.07)

h. Fitness-for-Duty Program (IP 71130.08)

i. Information Technology Security (IP 71130.10) **

j. Material Control and Accounting (IP 71130.11)

k. Review of Power Reactor Target Sets (IP 71130.14)

    • These inspectable area attachments are being developed.

Issue Date: 08/23/18 2 71130

02.02 These requirements represent the minimum inspection activity to be conducted at each

reactor site at the frequencies shown in each inspectable area attachment.

a. The inspection requirements in Section 02 of the listed attachments describe the

necessary actions to be completed in order to achieve the inspection objective(s) stated

in Section 01 of the listed attachments. Inspection requirements may include, but are

not limited to, inspecting systems, components, records, procedures, programs, and

operations.

b. The sample size identified within each inspectable area has been determined to meet

the inspection objective(s) and the general performance objective of the Security

Cornerstone. Inspection of the minimum number of inspection requirements within each

inspectable area attachment at the periodicity specified within the attachment

demonstrates the completion of the respective inspection procedure.

c. The inspectable area attachments within the Security Baseline Inspection Program

include a risk-informed structure which is depicted within each attachment through the

application of a “tier level” format to indicate the risk significance of the inspection

requirements within the specified sample. The inspection requirements are separated

into three tier level sections (Tier I, Tier II, and Tier III) with the most risk significant

being assigned to the Tier I section of the attachment. This tier level concept ensures

that the licensee’s physical protection program and protective strategy receive

inspection oversight relative to the risk significance of the specific elements that

comprise the licensee’s security programs.

02.03 Identification and Resolution of Problems. The primary means by which licensees

maintain an appropriate level of safety and security is through an effective problem identification

and resolution program to correct deficiencies involving human performance, equipment,

programs, and procedures. The baseline inspection program includes periodic inspections of

the licensees’ corrective action programs to gauge their effectiveness for identifying and

correcting problems.

71130-03 INSPECTION GUIDANCE

Applicable Performance Indicator: The security cornerstone includes one performance indicator,

“The Protected Area Security Equipment Performance Index,” which monitors the effectiveness

of the maintenance process and equipment degradation of components of protected area

perimeter detection and assessment.

71130-04 INSPECTION RESOURCES

Estimates of inspection resources are identified within each inspectable area attachment.

END

Issue Date: 08/23/18 Att1-1 71130

Attachment 1- Revision History for 71130

Commitment

Tracking

Number

Accession

Number

Issue Date

Change Notice

Description of Change

Description of

Training Needed

and Completion

Date

Comment Resolution

and Closed Feedback

Accession Number

(Pre-Decisional, NonPublic Information)

04/03/00

CN 00-003

Initial issuance.

ML040680555

02/19/04

CN 04-007

Periodic revision.

N/A ML0719304062

12/10/08

CN 08-035

This document has been revised to include updates

resulting from inspection feedback and oversight;

add new inspectable area (MC&A); correct editorial

errors and the conversion to MS Word.

N/A ML073550675

N/A ML093421304

01/12/10

CN10-002

This document has been revised to address the

changes to 10 CFR Part 73 that resulted from a

rulemaking; and in accordance with the ROP

realignment process.

N/A N/A

N/A ML100471188

02/24/10

CN 10-007

Effective date changed to 04/01/10. N/A N/A

N/A ML14296A315

04/20/15

CN 15-006

This document has been revised to change the

program applicability to ensure the procedures

have connectivity to the appropriate base document

which specifically identifies the inspectable areas

within its content.

N/A ML15041A166

Issue Date: 08/23/18 Att1-2 71130

Commitment

Tracking

Number

Accession

Number

Issue Date

Change Notice

Description of Change

Description of

Training Needed

and Completion

Date

Comment Resolution

and Closed Feedback

Accession Number

(Pre-Decisional, NonPublic Information)

N/A ML17262A757

08/23/18

CN 18-028

SOSB revised the 71130 series Inspection

Procedures (IP) and associated Inspection Manual

Chapters (IMC) in response to Staff Requirements

SECY 16-0073 (Options and Recommendations

for the Force-On-Force Inspection Program) and

the March 2017 Assessment Team (Regions and

HQ) review for redundancy’s and efficiencies of the

71130 series IPs for power reactors. Upon

completion of a SUNSI review, the staff concluded

that this document should be de-controlled.

Consistent with the staff’s SUNSI determination, an

administrative revision of this document was

conducted to remove SUNSI markings.

N/A ML17262A704