Withdrawal of License Amendment Request: Use of Relief Valves to Isolate Penetration Flow Paths
ML061300617
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 05/05/2006
From: Krupa M
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GNRO-2006/00028, TAC MC7970
Download: ML061300617 (2)


Text

Entergy Operations, inc.

Waterloo Rd.

P.O. Box 756 Port Gibson, M5 39150 Tel 601 4376470 Michael A. Krupa Director Nuclear Safety Assurance GNRO-2006/00028 May 5,2006 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Withdrawal of License Amendment Request:

Use of Relief Valves to Isolate Penetration Flow Paths Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 License No. NPF-29

Reference:

Letter GNRO-2005/00038, "License Amendment Request: Use of Relief Valves to Isolate Penetration Flow Paths ," from George A.

Williams of Entergy to USNRC dated June 27, 2005 (ADAMS Accession No. ML052070689)

Dear Sir or Madam:

On June 27, 2005, Entergy Operations, Inc. (Entergy) submitted the above referenced letter which requested a license amendment to the Grand Gulf Nuclear Station (GGNS)

Technical Specifications (TS). That License Amendment Request (LAR) is being reviewed by the NRC staff under TAC No. MC7970. Entergy is hereby withdrawing the referenced LAR.

The proposed amendment would have modified TS 3.6.1.3 to allow relief valves with a relief setpoint of at least 1.5 times the containment design pressure to be used to isolate penetration flow paths affected by an inoperable primary containment isolation valve.

During telephone conference calls regarding the proposed change, the NRC staff commented on the broad scope of the request and suggested that Entergy reconsider the scope or provide more specific details regarding the types of configurations for which the change would be applied. In consideration of the staff's comments, Entergy is withdrawing the request but plans to submit a similar request at a later date.

GNRO-2006/00028 Page 2 of 2 There are no commitments contained in this submittal. If you have any questions or require additional information, please contact Ron Byrd at 601-368-5792.

Sincerely, MAWRWB/amt cc: Dr. Bruce S. Mallett Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 U. S. Nuclear Regulatory Commission A'TTN: Mr. Bhalchandra Vaidya, NRWOORL (w12)

ATTN: ADDRESSEE ONLY A'TTN: U. S. Postal Delivery Address Only Mail Stop OWFN/O-7DIA Washington, DC 20555-0001 Mr. Brian W. Amy, MD, MHA, MPH Mississippi Department of Health P. 0. Box 1700 Jackson, MS 39215-1700 NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150 Mr. D. E. Levanway (Wise Carter)

Mr. L. J. Smith (Wise Carter)

Mr. N. S.Reynolds Mr. J. N. Compton GO60028