ENS 58168
ENS Event | |
|---|---|
07:09 Feb 23, 2026 | |
| Title | Unusual Event - Loss of All Offsite Power |
| Event Description | The following information was provided by the licensee via phone and email:
At 0209 EST on 02/23/2026, with Hope Creek in Mode 1 at 100 percent power, the reactor automatically tripped due to a loss of offsite power. All emergency diesel generators (EDGs) started and loaded as expected to power vital buses. Operations responded and stabilized the plant in Mode 3. Reactor water level is being maintained via high pressure coolant injection (HPCI) and reactor core isolation cooling (RCIC). Reactor pressure is being maintained using safety relief valves (SRVs). Due to the reactor protection system actuation while critical, this event is being reported as a four-hour, non-emergency notification per 10 CFR 50.72(b)(2)(iv)(B). An Unusual Event (SU1.1) was declared at 0229 on 02/23/2026, due to a loss of offsite power to all vital buses for greater than 15 minutes. There was no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified, and all offsite notifications have been made. Notified DHS SWO, FEMA Operations Center, FEMA NWC, CISA Central Watch Officer, CWMD Watch Desk, DHS Nuclear SSA (email), DHS NRCC THD Desk (email).
|
| Where | |
|---|---|
| Hope Creek New Jersey (NRC Region 1) | |
| Reporting | |
| Emergency class: | Unusual Event |
| 10 CFR 50.72(a)(1)(i), Emergency Class Declaration 10 CFR 50.72(b)(2)(iv)(B), RPS Actuation | |
| Time - Person (Reporting Time:+-4.12 h-0.172 days <br />-0.0245 weeks <br />-0.00564 months <br />) | |
| Opened: | Jim Butler 03:02 Feb 23, 2026 |
| NRC Officer: | Adam Koziol |
| Last Updated: | Feb 23, 2026 |
| 58168 - NRC Website
Loading map... | |
Unit 1 | |
|---|---|
| Reactor critical | Critical |
| Scram | A/R |
| Before | Power Operation (100 %) |
| After | Hot Shutdown (0 %) |
Hope Creek | |
WEEKMONTHYEARENS 581682026-02-23T07:09:00023 February 2026 07:09:00
[Table view]10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Unusual Event - Loss of All Offsite Power ENS 568892023-12-15T00:39:00015 December 2023 00:39:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram ENS 541982019-08-03T23:47:0003 August 2019 23:47:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip and Manual Actuation of Reactor Core Isolation Cooling ENS 531012017-11-30T21:57:00030 November 2017 21:57:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Unusual Event Declared Due to Earthquake ENS 514302015-09-29T00:46:00029 September 2015 00:46:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram Following Trip of Both Reactor Recirculation Pumps ENS 496082013-12-05T08:25:0005 December 2013 08:25:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram Following Turbine Trip on High Moisture Separator Level ENS 495922013-12-01T11:13:0001 December 2013 11:13:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram Due to Main Turbine Trip ENS 491082013-06-12T17:33:00012 June 2013 17:33:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Circulating Water Pump Trip Leads to Reactor Scram ENS 489472013-04-19T19:18:00019 April 2013 19:18:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Notification of Unusual Event Declared Due to Inability to Confirm a Fire in the Protected Area within 15 Minutes ENS 471922011-08-23T18:00:00023 August 2011 18:00:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Notification of an Unusual Event Due to a Seismic Event ENS 450742009-05-17T07:35:00017 May 2009 07:35:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Scram Due to Loss of Scram Air Header ENS 444422008-08-28T08:47:00028 August 2008 08:47:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Unusual Event - Internal Flooding in Service Water Intake Structure ENS 431322007-01-30T04:10:00030 January 2007 04:10:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram on Low Reactor Pressure Vessel (Rpv) Water Level ENS 417532005-06-07T18:37:0007 June 2005 18:37:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Unusual Event Declared Due to Unidentified Drywell Leakage Greater than 10 Gpm ENS 411552004-10-28T14:03:00028 October 2004 14:03:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Unusual Event Declared Due to a Toxic Gas Release in the Security Center ENS 411092004-10-10T22:14:00010 October 2004 22:14:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Manual Reactor Scram Due to a Steam Leak in the Turbine Building ENS 404372004-01-12T15:48:00012 January 2004 15:48:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Scram Following Invalid Containment Isolation Signal ENS 402242003-10-04T21:13:0004 October 2003 21:13:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Rps Actuation While Critical 2026-02-23T07:09:00 | |