ENS 45074
ENS Event | |
|---|---|
07:35 May 17, 2009 | |
| Title | |
| Event Description | At 0335, Hope Creek was manually scrammed due to indications of multiple control rods drifting. All rods indicate fully inserted. Reactor level is being controlled in the normal band with Start-up level control in automatic. Reactor pressure is being controlled by bypass valves to the main condenser. Recirc pumps are in service and no ECCS system actuations were reached. The failure is a solder joint on the air supply to HCU 22-15. A manual scram was reinserted at 0445 to mitigate the air leak.
The licensee reset the scram to re-pressurize the scram air header. Once the leak was located, a second manual scram signal was initiated to secure the leak. No safety relief valves lifted during the transient. The electrical grid is stable and the plant is in a normal shutdown electrical lineup. The licensee will be notifying the Lower Alloways Creek Township and has notified the NRC Resident Inspector.
The failure was on HCU 22-11 not 22-15. The licensee notified the NRC Resident Inspector. Notified the R1DO (Holody) via e-mail.
On 5/17/09, at 0335, Hope Creek automatically scrammed due to low Reactor Pressure Vessel water level approximately two seconds prior to locking the Reactor Mode Switch in Shutdown due to indications of multiple control rods drifting. All rods indicate fully inserted. Reactor level is being controlled in the normal band with Start-up level control in automatic. Reactor pressure is being controlled by bypass valves to the main condenser. Recirc. Pumps are in service and no ECCS system actuations were reached. The failure is a solder joint on the air supply to HCU 22-11. A manual scram was reinserted at 0445 to mitigate the air leak. The licensee notified the NRC Resident Inspector. Notified the R1DO(Dentel). |
| Where | |
|---|---|
| Hope Creek New Jersey (NRC Region 1) | |
| Reporting | |
| 10 CFR 50.72(b)(2)(iv)(B), RPS Actuation | |
| Time - Person (Reporting Time:+-2.18 h-0.0908 days <br />-0.013 weeks <br />-0.00299 months <br />) | |
| Opened: | Michael Reed 05:24 May 17, 2009 |
| NRC Officer: | Howie Crouch |
| Last Updated: | May 29, 2009 |
| 45074 - NRC Website
Loading map... | |
Unit 1 | |
|---|---|
| Reactor critical | Critical |
| Scram | Yes, Manual Scram |
| Before | Power Operation (100 %) |
| After | Hot Shutdown (0 %) |
WEEKMONTHYEARENS 568892023-12-15T00:39:00015 December 2023 00:39:00
[Table view]10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram ENS 541982019-08-03T23:47:0003 August 2019 23:47:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip and Manual Actuation of Reactor Core Isolation Cooling ENS 514302015-09-29T00:46:00029 September 2015 00:46:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram Following Trip of Both Reactor Recirculation Pumps ENS 496082013-12-05T08:25:0005 December 2013 08:25:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram Following Turbine Trip on High Moisture Separator Level ENS 495922013-12-01T11:13:0001 December 2013 11:13:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram Due to Main Turbine Trip ENS 491082013-06-12T17:33:00012 June 2013 17:33:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Circulating Water Pump Trip Leads to Reactor Scram ENS 450742009-05-17T07:35:00017 May 2009 07:35:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Scram Due to Loss of Scram Air Header ENS 431322007-01-30T04:10:00030 January 2007 04:10:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram on Low Reactor Pressure Vessel (Rpv) Water Level ENS 411092004-10-10T22:14:00010 October 2004 22:14:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Manual Reactor Scram Due to a Steam Leak in the Turbine Building ENS 404372004-01-12T15:48:00012 January 2004 15:48:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Scram Following Invalid Containment Isolation Signal ENS 402242003-10-04T21:13:0004 October 2003 21:13:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Rps Actuation While Critical 2023-12-15T00:39:00 | |