ENS 51630
From kanterella
Jump to navigation
Jump to search
ENS Event | |
---|---|
11:30 Dec 31, 2015 | |
Title | |
Event Description | On 12/31/15, at approximately 0630 hours0.00729 days <br />0.175 hours <br />0.00104 weeks <br />2.39715e-4 months <br /> [EST], during shift turnover panel walk-downs, a licensed Unit 3 reactor operator identified that the High Pressure Coolant Injection (HPCI) flow controller output indicated a downscale condition. The controller was in automatic with the set point at 5000 gpm, which would typically indicate a controller output value of 100%. HPCI was not in operation and is a standby system. Operations promptly declared the HPCI system inoperable and entered Technical Specification Condition C for HPCI being inoperable. Other standby systems (Reactor Core Isolation Cooling and low pressure emergency core cooling systems) are OPERABLE.
HPCI is a single train system. Therefore, per NUREG-1022, this condition is being reported pursuant to 10 CFR 50.72(b)(3)(v)(D) as a condition that could have prevented the fulfillment of the safety function of a system required to mitigate the consequences of a design event. This condition has been entered into the Corrective Action program (IR 2606215). Maintenance troubleshooting of the flow controller loop has identified a failed component and repair activities are in progress. The NRC Resident Inspector has been informed of this notification. |
Where | |
---|---|
Peach Bottom ![]() Pennsylvania (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident | |
LER: | 05000278/LER-2015-001 Regarding Loss of High Pressure Coolant Injection System Function as a Result of Failed Flow Controller Signal Converter |
Time - Person (Reporting Time:+1.75 h0.0729 days <br />0.0104 weeks <br />0.0024 months <br />) | |
Opened: | Cj Campbell 13:15 Dec 31, 2015 |
NRC Officer: | Daniel Mills |
Last Updated: | Dec 31, 2015 |
51630 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 51630\u003C/a\u003E - \u003Ca href=\"/Peach_Bottom\" title=\"Peach Bottom\"\u003EPeach Bottom\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EHigh Pressure Coolant Injection Inoperable\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 51630 - Peach Bottom\n","link":"","lat":39.75920833333333,"lon":-76.26879444444444,"icon":"/w/images/b/be/Constellation_icon.png"}],"imageoverlays":null} | |
Unit 3 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |