ENS 48376
From kanterella
Jump to navigation
Jump to search
ENS Event | |
---|---|
13:59 Oct 4, 2012 | |
Title | Both Trains of Control Room Emergency Ventilation System Out of Service |
Event Description | The 'A' Main Control Room Emergency Ventilation System (MCREV) fan failed to automatically start when placed in service at 0959 EDT on 10/4/12. The `B' fan was available at the time of the initiation, but was inoperable due to E-42 Emergency 4kV Bus outage. Both MCREV fans inoperable is an entry into Technical Specification 3.7.4 Condition E which requires Unit 3 to be Mode 3 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. Unit 2 was not in a mode of applicability at the time of the event [Unit 2 is defueled]. This issue is being reported under 10 CFR 50.72(b)(3)(v)(D) for an event that could have prevented the fulfillment of a safety function - mitigate the consequences of an accident. The 'A' MCREV fan was restored to an operable status at 1237 EDT on 10/4/12 and the Technical Specification Action was exited.
The NRC Resident Inspector has been notified. |
Where | |
---|---|
Peach Bottom Pennsylvania (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident | |
LER: | 05000278/LER-2012-003 |
Time - Person (Reporting Time:+2.63 h0.11 days <br />0.0157 weeks <br />0.0036 months <br />) | |
Opened: | Larry Sloan 16:37 Oct 4, 2012 |
NRC Officer: | Bill Huffman |
Last Updated: | Oct 4, 2012 |
48376 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 48376\u003C/a\u003E - \u003Ca href=\"/Peach_Bottom\" title=\"Peach Bottom\"\u003EPeach Bottom\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EBoth Trains of Control Room Emergency Ventilation System Out of Service\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 48376 - Peach Bottom\n","link":"","lat":39.75920833333333,"lon":-76.26879444444444,"icon":"/w/images/b/be/Constellation_icon.png"}],"imageoverlays":null} | |
Unit 3 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_48376&oldid=423578"