Material Status Report for the Period Ending August 31, 2024
ML24283A064
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/09/2024
From: Darrell Adams
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation, US Dept of Energy, Nuclear Material Mgmt & Safeguards System
References
DCL-24-098
Download: ML24283A064 (1)


Text

Pacific Gas and Electric Company"'

PG&E Letter DCL-24-098 NMMSS Operations U.S. Department of Energy 1000 Independence Avenue, SW NA-ESH-12/Germantown Bldg.

Washington, DC 20585-1290 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Dallas L. Adams Manager, Program Engineering Material Status Report for the Period Ending August 31, 2024 Diablo Canyon Power Plant Mall code 104/4/427 P.O. Box 56 Avila Beach, CA 93424 805.545.6182 Dallas.Adams@pge.com Pursuant to 10 CFR 74.13, Enclosure 1 provides completed Forms DOE/NRC-742, "Material Balance Report," and DOE/NRC-742C, "Physical Inventory Listing." The data on these forms provide inventory balances at Diablo Canyon Power Plant (DCPP) Units 1 and 2 (RIS:XHC) for the period ending August 31, 2024.

Pursuant to 10 CFR 74.15, Enclosure 2 provides Form DOE/NRC-741, "Nuclear Material Transaction Report" at DCPP Units 1 and 2 for the period ending August 31, 2024. provides three files in a computer readable format of the aforementioned reports. The files were prepared in accordance with NMMSS Report D-24, "Personal Computer Data Input for NRC Licensees," dated March 24, 2020.

Pacific Gas and Electric Company makes no new or revised regulatory commitments (as defined by NEI 99-04) in this report.

If you have any questions regarding the enclosures, please contact Reactor Engineering Supervisor Jayson O'Hare at (805) 545-6537.

A member of the STARS Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek Date m_

NA-ESH-12, Germantown Building PG&E Letter DCL-24-0 98 Page 2

armb/4743 Enclosures cc: Diablo Distribution Mahdi O. Hayes, NRC Senior Resident Inspector Samson S. Lee, NRR Project Manager John D. Monninger, NRC Region IV Administrator NRC Document Control Desk