Pacific Gas and Elecmc Company*

Paula Gerfen Diablo Canyon Power Plant Site Vice President Mail code 104/6/605 P.O. Box 56 Avila Beach, CA 93424 805.545.4596 Internal: 691.4596 Fax: 805.545.4234 April 8, 2021 PG&E Letter DCL-21-031 REIRS Project Manager 10 CFR 20.2206 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Annual Report of Occupational Radiation Exposure for 2020 REIRS Project Manager:

On March 23, 2021, Pacific Gas and Electric Company (PG&E) submitted the Annual Report of Occupational Radiation Exposure for individuals monitored at Diablo Canyon Power Plant during the 2020 calendar year in accordance with 10 CFR 20.2206(c). The report was created in the electronic format specified in Regulatory Guide 8.7, Revision 4, Instructions for Recording and Reporting Occupational Radiation Dose Data. The data file, NRC20210323.dat, was submitted electronically on the Radiation Exposure Information and Reporting System (REIRS) web page.

PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.

If you have any questions about the report, please contact Mr. Craig Sutton, Nuclear Radiation Protection Manager, at 805-545-4208.

Sincerely, Paula Gerfen armb/50942689-09 cc: Donald R. Krause, NRC Senior Resident Inspector Samson S. Lee, NRC Project Manager Scott A. Morris, NRC Region IV Administrator NRC Document Control Desk Diablo Distribution A member of the STARS Alliance Callaway