CP-201600502, Report of Changes to the Physical Security Plan (Revision 8)

From kanterella
Jump to navigation Jump to search
Report of Changes to the Physical Security Plan (Revision 8)
ML16153A245
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/26/2016
From: Thomas McCool
Luminant Generation Co, Luminant Power
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
CP-201600502, TXX-16075
Download: ML16153A245 (2)


Text

SAFEGUARDS INFORMATION Kenneth J. Peters Luminant Power Senior Vice President P.O. Box 1002

& Chief Nuclear Officer 6322 North FM 56 Kenneth.Peters@luminant.com Glen Rose, TX 76043 T 254 897 6565 c 817 776 0037 F 254 897 6652 CP-201600502 Ref: 10 CFR 5054(p)(2)

T:XX-16075 10 CFR 50.4(b)(4)

May 26, 2016 Attn: Document ControlDesk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

COMANCHE PEAK NUCLEAR POWER PLANT (CPNPP)

DOCKET NOS. 50-445, 50-446 AND 72-74 REPORT OF CHANGES TO THE PHYSICAL SECURITY PLAN (REVISION 8)

Dear Sir or Madam:

LuminantGeneration Company LLC (Luminant Power) hereby submits as specified ir:t 10 CFR 50.4(b)(4) a report of changes contained in Revision 8 of the Comanche Peak Nuclear Power Plant (CPNPP) Units 1 and 2 Physical Security Plan (PSP). The changes were assessed per 10 CFR 50.54(p) and were determined*

not to reduce the safeguards effectiveness of the PSP. The Plan is dated March 30, 2016 and was made effective on March 31, 2016.

A CD-ROM titled "CPNPP Security Plan Rev. 8" is included with this submittal. File 001 of the CD-ROM contains the Comanche Peak PSP which is sensitive information that has intri.llsic security value designated as safeguards information (SGI) and should be protected against unauthorized disclosure in accordance with 10 CFR 73.21 and 10 CFR 73.22. File 002 of the CD-ROM contains the summary of changes to the PSP and is designated as security related information (SRI) which should be withheld from public disclosure in accordance with 10 CFR 2.390. The CD-ROM contains thefollowing two (2) files:

001 CPNPP Units 1and2 PSP Rev 8.pdf, 960 kilobytes (kB), Non-Publicly Available (SGI) 002 CPNPP PSP Rev 8 Summary of Changes.pd£, 217 kB, Non-Publicly Available (SRI)

The enclosed CD-ROM contains SGI. When separated from the CD.:ROM, this document is decontrolled.

SAFEGUARDS INFORMATION

U. 5. Nuclear Regulatory Commission TXX-16075 Page 2 of 2 05/26/2016 This communication contains no new licensing basis commitments regarding Comanche Peak Units 1 and 2 and the Independent Spent Fuel Storage Facility.

Should you have any questions regarding this submission, please contact Mr. Jim Barnette Games.barnette@luminant.com); Consulting Licensing Technologist, at (254) 897-5866.

Sincerely, Luminant Generation Company LLC

Enclosure:

CD-ROM titled "CPNPP Security Plan Rev. 8" (SGI) c - M. L. Dapas, Region IV (with enclosure CD-ROM)

Margaret M. WaJford, NRR CLO Resident Inspectors, CPNPP CLO

SAFEGUARDS INFORMATION Kenneth J. Peters Luminant Power Senior Vice President P.O. Box 1002

& Chief Nuclear Officer 6322 North FM 56 Kenneth.Peters@luminant.com Glen Rose, TX 76043 T 254 897 6565 c 817 776 0037 F 254 897 6652 CP-201600502 Ref: 10 CFR 5054(p)(2)

T:XX-16075 10 CFR 50.4(b)(4)

May 26, 2016 Attn: Document ControlDesk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

COMANCHE PEAK NUCLEAR POWER PLANT (CPNPP)

DOCKET NOS. 50-445, 50-446 AND 72-74 REPORT OF CHANGES TO THE PHYSICAL SECURITY PLAN (REVISION 8)

Dear Sir or Madam:

LuminantGeneration Company LLC (Luminant Power) hereby submits as specified ir:t 10 CFR 50.4(b)(4) a report of changes contained in Revision 8 of the Comanche Peak Nuclear Power Plant (CPNPP) Units 1 and 2 Physical Security Plan (PSP). The changes were assessed per 10 CFR 50.54(p) and were determined*

not to reduce the safeguards effectiveness of the PSP. The Plan is dated March 30, 2016 and was made effective on March 31, 2016.

A CD-ROM titled "CPNPP Security Plan Rev. 8" is included with this submittal. File 001 of the CD-ROM contains the Comanche Peak PSP which is sensitive information that has intri.llsic security value designated as safeguards information (SGI) and should be protected against unauthorized disclosure in accordance with 10 CFR 73.21 and 10 CFR 73.22. File 002 of the CD-ROM contains the summary of changes to the PSP and is designated as security related information (SRI) which should be withheld from public disclosure in accordance with 10 CFR 2.390. The CD-ROM contains thefollowing two (2) files:

001 CPNPP Units 1and2 PSP Rev 8.pdf, 960 kilobytes (kB), Non-Publicly Available (SGI) 002 CPNPP PSP Rev 8 Summary of Changes.pd£, 217 kB, Non-Publicly Available (SRI)

The enclosed CD-ROM contains SGI. When separated from the CD.:ROM, this document is decontrolled.

SAFEGUARDS INFORMATION

U. 5. Nuclear Regulatory Commission TXX-16075 Page 2 of 2 05/26/2016 This communication contains no new licensing basis commitments regarding Comanche Peak Units 1 and 2 and the Independent Spent Fuel Storage Facility.

Should you have any questions regarding this submission, please contact Mr. Jim Barnette Games.barnette@luminant.com); Consulting Licensing Technologist, at (254) 897-5866.

Sincerely, Luminant Generation Company LLC

Enclosure:

CD-ROM titled "CPNPP Security Plan Rev. 8" (SGI) c - M. L. Dapas, Region IV (with enclosure CD-ROM)

Margaret M. WaJford, NRR CLO Resident Inspectors, CPNPP CLO