CP-201300480, Comanche Peak, Unit 1, Submittal of Cycle 17 Core Operating Limits Report, Revision 0

From kanterella
Jump to navigation Jump to search
Comanche Peak, Unit 1, Submittal of Cycle 17 Core Operating Limits Report, Revision 0
ML13136A244
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 04/10/2013
From: Madden F W, Flores R
Luminant Generation Co, Luminant Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CP-201300480, TXX-13076
Download: ML13136A244 (1)


Text

Rafael Flores Senior Vice President& Chief Nuclear Officer rafael.flores@Luminant.com Luminant Luminant P'ower P 0 Box 1002 6322 North FM 56 Glen Rose, TX 76043 T 254 897 5550 C 817 559 0403 F 254 897 6652 10 CFR 50.36(c)(5)

CP-201300480 TXX-13076 April 10, 2013 U.S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, DC 20555

SUBJECT:

Comanche Peak Nuclear Power Plant (CPNPP)Docket No. 50-445 Core Operating Limits Report

Dear Sir or Madam:

Enclosed is Revision 0 of the Core Operating Limits Report for Comanche Peak Nuclear Power Plant (CPNPP) Unit 1, Cycle 17. This report is prepared and submitted pursuant to Technical Specification 5.6.5.This letter contains no new licensing basis commitments regarding CPNPP Unit 1.Should you have any questions, please contact Mr. J. D. Seawright at (254) 897-0140.Sincerely, Luminant Generation Company LLC Rafael Flores Fred W. Madden Director, Oversight and Regulatory Affairs Enclosure

-CPNPP Unit 1 Cycle 17 Core Operating Limits Report, Revision 0 C -A. T. Howell, Region IV B. K. Singal, NRR Resident Inspectors, Comanche Peak A member of the STARS Alliance Callaway

  • Comanche Peak
  • Diablo Canyon Palo Verde San Onofre
  • Wolf Creek eb, OýK