MONTHYEARCNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-23-068, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-012, Revision to the Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis, (TS-19-02)2023-04-11011 April 2023 Revision to the Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis, (TS-19-02) CNL-23-023, Annual Insurance Status Report2023-03-30030 March 2023 Annual Insurance Status Report CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report2023-03-29029 March 2023 TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report CNL-23-022, Decommissioning Funding Status Report2023-03-29029 March 2023 Decommissioning Funding Status Report CNL-23-021, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-03-0808 March 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-037, Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533)2023-01-31031 January 2023 Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533) CNL-23-003, Browns Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Organizational Topic Report TVA-NPOD89-A2023-01-30030 January 2023 Browns Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Organizational Topic Report TVA-NPOD89-A CNL-23-011, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements2023-01-18018 January 2023 Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements CNL-23-009, Response to Request for Additional Information Request to Revise Technical Specification 3.4.122023-01-0404 January 2023 Response to Request for Additional Information Request to Revise Technical Specification 3.4.12 CNL-23-008, Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-12-22022 December 2022 Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-106, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operat2022-11-28028 November 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operatio CNL-22-099, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2022-10-31031 October 2022 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-22-104, Correction to Response to Request for Additional Information Regarding Sequoyah Nuclear Plant, Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RV-022022-10-31031 October 2022 Correction to Response to Request for Additional Information Regarding Sequoyah Nuclear Plant, Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RV-02 CNL-22-098, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 552022-10-17017 October 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 55 CNL-22-084, Response to Request for Additional Information Regarding License Amendment Request to License Amendment Request to Modify Approved 10 CFR 50.69 Categorization Process (SQN-TS-21-07)2022-09-16016 September 2022 Response to Request for Additional Information Regarding License Amendment Request to License Amendment Request to Modify Approved 10 CFR 50.69 Categorization Process (SQN-TS-21-07) CNL-22-085, Response to Request for Additional Information Regarding Sequoyah Nuclear Plant (Sqn), Units 1 and 2 and Watts Bar Nuclear Plant (Wbn), Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Al2022-09-0202 September 2022 Response to Request for Additional Information Regarding Sequoyah Nuclear Plant (Sqn), Units 1 and 2 and Watts Bar Nuclear Plant (Wbn), Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alte CNL-22-053, Response to Request for Additional Information Regarding Application to Revise Sequoyah Nuclear Plant Units 1 and 2 Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis - Second Partial Response to Additional Requ2022-08-22022 August 2022 Response to Request for Additional Information Regarding Application to Revise Sequoyah Nuclear Plant Units 1 and 2 Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis - Second Partial Response to Additional Reques CNL-22-077, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-08-11011 August 2022 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-030, Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03)2022-07-27027 July 2022 Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03) CNL-22-080, Request for Enforcement Discretion from the Requirements of Technical Specification 3.5.2, ECCS - Operating2022-07-22022 July 2022 Request for Enforcement Discretion from the Requirements of Technical Specification 3.5.2, ECCS - Operating CNL-22-081, Supplement to Sequoyah Nuclear Plant, Unit 1, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RP-122022-07-21021 July 2022 Supplement to Sequoyah Nuclear Plant, Unit 1, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RP-12 CNL-22-079, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RP-122022-07-20020 July 2022 American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RP-12 CNL-22-071, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08)2022-07-13013 July 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08) CNL-22-039, Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04)2022-07-13013 July 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) CNL-22-069, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf.2022-07-0101 July 2022 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. CNL-22-070, Status Regarding the Improved Flood Mitigation System Project2022-06-30030 June 2022 Status Regarding the Improved Flood Mitigation System Project CNL-22-062, Response to Request for Additional Information Regarding American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RV-022022-06-28028 June 2022 Response to Request for Additional Information Regarding American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RV-02 CNL-22-008, and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) CNL-22-064, Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change2022-06-0909 June 2022 Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change CNL-22-068, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-06-0808 June 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-047, Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2022-05-23023 May 2022 Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-22-034, Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03)2022-05-13013 May 2022 Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03) CNL-22-027, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 40 - Annual Update and Proposed Changes to Revision 402022-04-28028 April 2022 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 40 - Annual Update and Proposed Changes to Revision 40 CNL-22-023, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf2022-04-28028 April 2022 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf 2024-01-17
[Table view] |
Text
{{#Wiki_filter:Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-18-054 April 11, 2018 10 CFR 50.4 10 CFR 50.90 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328
Subject:
Supplement to Sequoyah Nuclear Plant, Units 1 and 2 License Amendment Request to Modify Essential Raw Cooling Water Motor Control Center Breakers and to Revise the Updated Final Safety Analysis Report for Sequoyah Nuclear Plant Units 1 and 2 (SQN-TS-17-04)
Reference:
TVA Letter to NRC, CNL-17-150, Sequoyah Nuclear Plant, Units 1 and 2 License Amendment Request to Modify Essential Raw Cooling Water Motor Control Center Breakers and to Revise the Updated Final Safety Analysis Report Sequoyah Nuclear Plant Units 1 and 2 (SQN-TS-17-04), dated March 9, 2018 (ML18071A349)
In the referenced letter, Tennessee Valley Authority (TVA) submitted a request for an amendment to Renewed Facility Operating License Nos. DPR-77 and DPR-79 for the Sequoyah Nuclear Plant (SQN), Units 1 and 2, respectively. The proposed change would modify Essential Raw Cooling Water (ERCW) Motor Control Center (MCC) Breakers and revise the Updated Final Safety Analysis Report for SQN Units 1 and 2 (SQN-TS-17-04).
Based on a verbal request from the Nuclear Regulatory Commission, the enclosure to this letter supplements the reference license amendment request by providing SQN-0-35W716-1 and 2, Single Line Diagrams for the 1A-A, 2A-A, 1B-B, and 2B-B ERCW MCCs.
This supplement does not change the no significant hazards consideration contained in the referenced letter. There are no new regulatory commitments made in this letter. Please address any questions regarding this request to Mr. Edward D. Schrull at (423) 751-3850.
U. S. Nuclear Regulatory Commission CNL-18-054 Page 2 April 11, 2018 I declare under penalty of perjury that the foregoing is true and correct. Executed on this 11th day of April 2018.
Vice resident, Nuclear Regulatory Affairs and Support Services
Enclosure:
SQN-0-35W716-1 and 2, Single Line Diagrams for the 1A-A, 2A-A, 1B-B, and 28-B ERCW MCCs cc (Enclosure):
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Sequoyah Nuclear Plant NRC Project Manager - Sequoyah Nuclear Plant Director, Division of Radiological Health - Tennessee State Department of Environment and Conservation (w/o enclosure)
Enclosure SQN-0-35W716-1 and 2 Single Line Diagrams for the 1A-A, 2A-A, 1B-B, and 2B-B ERCW MCCs
L-9LLM~£-Z' l 2 3 4 5 7 8 9 10 FROMS.9KVSHUTOO\llN BOARD2A-A(i5N72'1-3) 1 XfMR2/\-A
~JiK~y!aov A
5
{;")OPEN ycLOSE 6
r,')oPEN yclOSE 9
' '°'
STAR.'
STOP 1 I
2 2-+oo-5
------, AS A I
I
' ' "~MnM0>-m/"-'
BODA )--5 SEE NOTES 6 AND 15 I
I 2 BUS TIE AND LOAD SHEODHIG CIRCUIT BREAKER ARE 600V, 3 POLE,
~~2CE~~~~~L ii~~~ l~~rn~~PrfN~a~OTING OF NOT LESS THAN 22,000 I LS 2-i\-+80 J.MAINCIRCUITBREAKERSARE600V, 3POLE, BOOAFRAME i'"'"'""l~,,*oo "-"~°'
WITH STATIC CURRENT SENSORS ANO A MINIMUM INTERRUPTING I RATING OF JO.COO RI.IS SYMMETRICAL AMPERES AT +sov SEE NOTE
,,L;==i1*""'°'"'I"'
5____.---<!'.:;;~0A i I 250A 181 NO SEENOTE6 4 (1A TEST
.1 ANN I
B L t:~~otio1 ~Ft-A) 2 ~_L_o-11* L B
-t---,,.,.,,.,,..,_~~~~~~~~~~~~r--+-~~~~-t-~~~~~-t-~~-t-~~~.,...,
600A ~--~--~
(16~~ot~o11 ~F:-A) r-.:!,-- --,,---- -- -- -- __J cL Y
+B~-N)ov _ 1
- 0) I c)
~ 1~
H"I *I **~
7 SUMPPUMPSAREELECTRICALLYALTERNATEDBYRELAYARATL0\11 LEVEL 8 ~~~~~ ~~§p~~\~v~E'ft~~~ FROM 1~ 2-FCV-67-492 BY OPENING c " 9 LOAOONTHE25KV.-.HEATTR.-.CETRANSFORMERSMUSTNOTEXCEEO n~v~ rn~Q~ E6~5~IT TO HEAT TRACE CABINET A-A lS DESIGNED c
- 10. NON-SAFETYEQU!PMENTHASTRAINEOCABLESANDTR"'INEDNONECLATURE REFEXCEPTIONNUMBEREX-SQN-DC-V-122-6(843860909911)
I 1l ~~~DNE~%D%~i ~~~N1NT~'UiG~R,EAKERS ARE TO HAVE THEIR ADJUSTABLE I 12 g~~~~~~~~i~A~~!~~~~~~~~~gr~:~~~~~~~~l~~Q~~ji~J¥~8~i8~R~~POJ 58CR ,
~~~~6~~8tM!f~ 0 ~~ 8 ~PrnE~ 3 (~~~rn~~CE ~~6 ~~8~~8tA~rn~~s~MPNG t' 1 ~~~H~0~8~~~9~ fi~~K~~:~v~r~~~~Q~~~~~l!c~~ri~T ~~Egs~T §~¥9Y~G J ANf FOR T 00 SHRT STOP FORMCP03150RC/MCPOJ150CRIS50AMPERES. THEINSTANTAN(OUSSETTING FORHMCP015EOCIS4SA'°'PERES(Rff PEGPACKACE1233236A1}.
0 1+ ~~~~~~i~~::~f~ Tw~~~i?~g~:~g~:~~!~~~~~~~§:~~;~~~g~~fil~~u f~~ s 0
~~~L~~8Kl8EE~!f~s~~g ,,,,_A "'ND 2"'-"'* CCNPARTMENT 20 REF
~ ~~:~~f~~~~1~~i~~~(~u¥8C~ i8~5l~c~f~A~~~~~~~:~
REFPEGPACK,.,GE1D71185AO INST,.,NTANEOUSBRE"'KER 8ESETAT10TIMESTRIPUNITRATINGWHICH!SEQUAL H
16 ~~sHr~urnp~o~Egc~f8o, 1 ~~~/~~~5r~~5~Krn511MP~A~ BREAKERS.
17 ALLOTHERASPECTSSlJCHASRATtNG, NUMBER OF POLES,
- ~T~~~st~¥~nDE~gRa~I~~DEg~~~U1~ ~~~~K~*RCUIT BREAKER MAY 18 BREAKERCANEITHERBECUTLER-HAMMERBREAKERJD3200WITHSHUNTTRIP OR WESTINGHOUSE BREAKER KB3200 lllIHt SHUNT TRJP. REFERENCE PEG PACK ... GECQL602X-EQUIV.
~~~~~~~Hi:E~E H~rn~~R~~ST~~i~~~~E~~~~~i~R~~M~~~uf6P~i 1 i~~R U~~NG
- -;-;,;- ;~
E <] 19 E
r-TO CONT TO CONT RM125VDC
~~~::::>~j"".'~~)--
l 480VMCC2A-A
- 20. BREAKERCANBEE!THERWESTINGHOUSE/Cl.ITLER-HAMMER
- - --;:;:- - --4-z---;O~ ~~L- ~~ ----:;;; ,---;;-- ~ ~~ :::---- - - - - - - - - - - - ' 8 - - - , IACP03150RC/MCP03150CRORCUTLER-HAMMERH~P015EOC THECONTINUOUS SETTINGFORBOTHBREAKERSJS15AMPERES. THE INSTANTANEOUS f~Jfl~~A~~~u~f~Ni~~Cfa~/~a~~~~EJg f~ :~r~~~fREJ~E r;:) ecc '°'° H ( - ) 11) i,:) >-:) 1n) r;;) \-:) lo) SYMBOLS.
@)---------- -- CONTROL SUPPLIED BY MANUFACTURER I
I
!~ "
e < )--
~ ilg;/'°' !
"" Z SEE "f ! ! J ! 1 ! SEE 480-120V 150VA 480-120V 150VA t
4--@------ ~n~:~~~g:rA~~6~~~m~T R~M~s DEVICE F I: snl
~ I 250 s"'HUNT L( f~Y~T ~ N '"
F L
TRIP *------------ADJUSTAllLEMAGNET!CTR!P
~;; 200A r~ 200A <]-------- NON SAFETY EQUIPMENT J-'c~ ~~
AllSREYIATIONS*
'°"" 8/W---8ACKWASH F/0---FLUSHOUT 27 ~:i -
INC* ADMIN CHANGE PER RIMS* 885 \50326 OOB THISRESOLVESE\IR-15-PEG-067-119, WO 116445478/116513511
~------- l'__ ---
ERCW PUMP STATION CATEGORY I G UNIT 1 &. 2 WIRING DIAGRAMS 480V MOT CONT CTR 1A-A,2A-A
~~ §~ ~~ SINGLE LINES
~~ ~~ ~~ ~~ ~~ ~~ 2-LS-io
~~~
- i io"' '°'
40-72[ 2-LS-40-72A
~~
~~~
LEVEL LEVEL
~~ ~~ ~~
~~ ~~
- ~
SEQUOYAH NUCLEAR PLANT
<] <] ~iiUil
~~~ ~~ ~~
~§
~~
~~~
~:~
~~
;; ~~ <]
tj~
<] TENNESSEE VALLEY AUTHORITY
~:
!i ~~
H g~~ ~: ~: ~~ g~ ~:~ g~ g: ~~i RO ISSUE PER CCD REGONC!LlHlON SHEET
<] <] <] <] <] <] <] <] <] <] <] <] REFERENCE DRAWINGS ~°'~"~'~'"~'+c~c=-=-i~~~G~~=~6:*A~~~1~~DE A cco1-,-,--/-,-"--I
____ Nj~---
DATE 6-21-ss 45 E CCD NO: 1, 2-35W716-1 R27 DRAWING I
2 3 4 5 6 7 8 9 10 ERCWSCREEN ERCWHEADER1B ERCWHE,.DER2B ERCWSCRE£N WASHf>UMPB-B lSOl.ATIONVALVE ISOLATION VALVE IASHPUMPC-8 0START 0START STOP 00PENCLOSE 00PENCLOSE STOP NOR.
A ' ""'" 7 4
1------- A 2-400-5 A 2 I 1 2 A 2-400-sH--------{ c)REVERSING.STARTERSl1AVETWOCONVERflBLEAUXILIARYCONTACTS PERCONTACTORCOIL.
diAlLTHREEPHASESl!LLHAVETHEOVERLOADHEATERElEMENTS
~~...4 I I ~ob~ 2.
INSTALLED, UNLESSALLTHREEPHASESHAVEJUMPERSUISTALL(D BUS TIE, LOAD SHEDDING AND PEDESTAL CRANE CIRCUIT BREAKERS ARE SDOV, J POLE, 250A FRAME WITH "N INTERRUPTING flj\.TJNC OF NOT I I J LESS THAN 22,000 SYt.lllETRICAL RMS AMPERES AT 480V.
MAINCIRCUITBREAKERSARE600V,JPOLE, 800AFRAMEWITH STATIC CURRENT SENSORS ANO A MINIMUM INTERRUPTING RATING I OfJO,OOORldSSYWMETRICALAl.IPERESAT480V.
B r=D)""
~ 150VA c
! '")*"-"" 7.
8.
SIJMPPUMPSAREELECTRICALLYALTERNATEDBYRELAYARAlLOW LEVH.
POWER HAS BEEN REMOVED FROM 1 I. 2~FCV-87-489 BY OPENING THEIRRESPECTl\lrACB'S.
------~;r, --
- 9. 001!-SAFETY EQUIPMENT HAS TRAINED CABLES AND TRAINED NOMENCLATURE.
REFEXCEPTlONNUl.IBEREX-SQN-OC-V-12.2-8(84J88090-911).
- 10. lli~iE1-%D%~i ~~lfl1NT~,ific~f!.~AKERS ARE TO HAVE THEIR ADJUSTABLE 12 s::Ee5ffE~~~E~l~~o~~66~~GH?~~E~~t~~~oo~~T~~o~52R~~POJ58CR' BREAKERSIS7AMPERES. THEINSTANTANEOUSSETTINGFOR
~~~a~~~;o~~~~rt~r~ 3 (WrrnrncE ~~a ~~6H~P~~g~~5~~61'.NG FOR 13
. ~~~Lij~~~raJ~~~~~~~;t~fif-~&~~i~~~M~t~~f ~~IE~r~fffl~g FOR l-IACP015EOC IS 45 Al.IPERES (REF PEG PACKAGE 1233236A1 .
14
~~~li~f~~~~T~~~l~~~g~:~~?u~~r~~~~~~~t1?~8~W~~uf~~s
~~~L~~6Kl_gEE~f~s~.1B-B AND 28-B, Cet.tPARTMEIH 20. REF 15
. ~!b~;i~~~;v~f~~~:;~i!~~!~i~~ii~:~~i~rf&c~i~e~~G~~~~:~H 18 ~5e~H~urW'~o~Egc~rno, 1 ~$~EF~:t71~~g~K~s~ ....~~A~~ BREAKERS.
17 ALLOTHERASPECTSSUCHASRATING, NUUBEROFPOLES, RATING(AUPS)ETCBEINGEQUAL,ATHEDCIRCUITBREAKERUAY BESUBSTITUTEDrDRATEDCIRCUITBREAKER.
18.BREAKERCANEITHERBECUTLER-HAi.t.IERBREAKERJ03200111THSHUNTTRIP ORllESTINGHOOSEBREAKERKB3200WITHSHUNTTRIP. REFERENCE PEG PACKAGECQL602X-EQUIV.
19 . ~~~~~~~H~:E~E ~i~~~R~~~T~~~~~~~E~~i~~~~~~~~~U~pi~l~~~R lJ~~NG TRIPSETTINGO.REFERENCEPEGPACKAGE746302CO.
- 20. BllEAKERCANBEEITHERWESTINGHOUSE/CUTLER-Hf.MMER MCP03150RC/MCP03150CR OR CUTLER-HAt.HE:R Hl.ICP015EOC THE CONTINUOUS SETTINGF"ORBOTHBREAKERSIS15AMPERES. THE INSTANTANEOUS SETTINGFORMCP03150RC/MCP03150CRIS62AUPERES. THE INSTANTANEOUSSET"llNGFORIM'.:P015EOCIS60AMPERES.
~THERMALMAGHETICOVERCURRENTTRlP
£CO"TROLSUPPLIEOBYMANUfACTURER tAOJUSTABLE~AGNETICTR!P d:..flslSOLIDSTATEOVERCURRENTTRIPDEVICEWITHLONGll<SHORT
~TRIPRANGESXXXSENSORA~RATlllG B/W-----llACKUSH F/0----FlUSkOl!T
~1 AOMIN CHANGE INC: AOMINCKANGEPERRIUS:B851503260 THISRESOLVESEWR-15-PEG-067-119,10116445478/116513511.
CATEGORY 1 ERCW PUMPING STATION WIRING DIAGRAMS 480V MCC 18-8, 28-8 SINGLE LINES
~ ~
SEQUOYAH NUCLEAR PLANT
~!~
TENNESSEE VALLEY AUTHORITY
~
g~~ ~§ RffERENCEDRAlll!NGS:
15W5DO---------------KEYDIACRAM ___ '!!~--- --------
~~:~~~:1 *tH~u -:a-:::::: E8\l~~Nl3t11°61~~~..l'ts 3511746-1,2.3.11<4------EXTCONNECT!ONOIAGRAMS lSSUEOBY:
J.B.HOSMER DRAWING I}}