BVY 18-001, Response to Request for Additional Information Regarding the License Amendment Request to Change the Physical Security Plan (PSP) to Reflect an Independent Spent Fuel Storage Installation (ISFSI) Only Configuration Vermont Yankee Nuclear

From kanterella
Jump to navigation Jump to search

Response to Request for Additional Information Regarding the License Amendment Request to Change the Physical Security Plan (PSP) to Reflect an Independent Spent Fuel Storage Installation (ISFSI) Only Configuration Vermont Yankee Nuclear Po
ML18022A300
Person / Time
Site: Vermont Yankee  Entergy icon.png
Issue date: 01/18/2018
From: Daniels C
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
BVY 18-001, EPID L-2017-SPR-0025
Download: ML18022A300 (2)


Text

SAFEGUARDS INFORMATION '

Entergy Nuclear Operations, Inc.

Vermont,Yankee 320 Governor Hunt Road

. Vernon, Vermont 05354 Tel: (802) 257-7711 Corey R. Daniels Director, Nuclear Decommissioning 10 CFR50.90 10 CFR 50.54(p) 10 CFR 73.55(r)

BW 18-001 January 18, 2018 ATTN: Document Control Desk

_-;z -sr U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Response to Request for Additio'nal Information Regarding the License Amendment Request to Change the Physical Security Plan (PSP) to Reflect an Independent Spent Fuel Storage Installation (ISFSi) Only Configuration Vermont Yankee Nuclear Power Station (EPID No. L-2017-SPR-0025)

Docket No. 50-271

REFERENCES:

1. Letter, Entergy Nuclear Operations, Inc. to USNRC, "Independent Spent Fuel Storage Installation Physical Security Plan, Revision 0, Proposed Change No. 315," BVY 17-003, dated March 29, 2017 (ML17117A421)
2. Letter, Entergy Nuclear Operations, Inc. to USNRC, '.~Updated Responses to Orders Applicable to the Proposed Independent Spent Fuel Storage .

Installation Physical Security Plan," BVY 17-019, dated June 28, 2017 (ML17181A186) .

3. Letter, Entergy Nuclear Operations, Inc. to USNRC, "Response to Request for Supplemental Documentation to Support Review of the Independent Spent Fuel Storage Installation (ISFSI) Physical Security Plan (PSP) (CAC No. L53188)," BW 17-032, dated September 14, 2017 2017 (ML17261A210)
4. Letter, USNRC to Entergy Nucle.ar Operations, Inc., "Request for Additional Information Regarding the License Amendment Request to Change the Physical Security Plan to Reflect an ISFSI-Only
  • Configuration.(EPID No. L-2017-SPR-0025)," dated December 14, 2017 (ML17341A384)

Dear Sir or Madam:

  • , *,Jfv!S5Z{p Pursuant to the provisions of 10 CFR §50.4, §50.54(p), §73.55(r) and §50.90, Entergy Nuclear Operations, Inc: (ENO) submitted a proposed Revision O of the Vermont Yankee Nuclear Power !Vf 'fl .

SAFEGUARDS INFORMATION ;JrvfSS The Enclosures contain "Safeguards Information," which must be protected accordingly, Upon_sJ3paration from the Enclosures, this letter is "DECONTROLLED."

  • ---~

SAFEGUARDS INFORMATION BVY 18-001 / Page 2 of 2 Station (VY) Independent Spent Fuel Storage Installation (ISFSI) Physical Security Plan (PSP)

  • (Reference 1), as supplemented by References 2 and 3.
  • The purpose of this letter is to provide additional information to support review of these

.submittals at the request of the NRC (Reference 4). The responses to the questions in Reference 4 are provided in Enclosure 1. A revised proposed Revision O of the ISFSI PSP, reflecting the changes described in the responses, is provided in Enclosure 2.

The Enclosures 1 and 2 contain Safeguards Information (SGI). Upon separation from Enclosures 1 and 2, this letter is decontrolled.

This letter contains no new regulatory commitments.

Should you have any questions concerning this letter, or require additional information, please contact Mr. Patrick Ryan at (802) 258-5838.

Sincerely, 0~tx_

CRD/kwk Enclosures (CD-ROM)

1. Response to Request for Additional Information (SGI)
2. ISFSI PSP Rev O (SGI) cc:
  • Regional Administrator, Region 1 (w/o Enclosures)

U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100

  • King of Prussia, PA 19406-2713 Mr. Jack D. Parrott, Senior Project Manager (w/o Enclosures)

Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Mail Stop T-8F5 Washington, DC 20555 Ms. June Tierney, Commissioner (w/o Enclosures)

Vermont Department of Public Service 112 State Street - Drawer 20 Montpelier, Vermont 05602-2601 SAFEGUARDS INFORMATION The Enclosures contain "Safeguards Information," which must be protected accordingly. Upon separation from the Enclosures, this letter is "DECONTROLLED."

---*-*--* .. -.:... ..........:::.~-----~----