Response to Request for Supplemental Documentation to Support Review of the Independent Spent Fuel Storage Installation (ISFSI) Physical Security Plan (PSP)
ML17261A210
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 09/14/2017
From: Boyle J
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BVY 17-032, CAC L53188
Download: ML17261A210 (3)


Text

SAFEGUARDS INFORMATION Entergy Nuclear Operations, Inc.

Vermont Yankee 320 Governor Hunt Road Vernon, Vermont 05354 Tel: (802) 257-7711 John W. Boyle .

Director, Nuclear Decommissioning 10 CFR 50.90 10 CFR 50.54(p) 73.55(r).

BVY 17-032 September* 14, 2017 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 *

SUBJECT:

Response to Request for Supplemental Doc'umentation to Support Review of the Independent Spent Fuel Storage Installation (ISFSI) Physical Security Plan (PSP)

(CAC No. L53188)

Vermont Yankee Nuclear Power Station Docket No. 50-271 License No. DPR-28

REFERENCES:

1. Letter, Entergy Nuclear Operations, Inc. to USNRC, "Independent Spent Fuel Storage Installation Physical Security Plan, Revision 0, Proposed .

Change No. 315," BVY 17-003, dated March 29, 2017 (ML17117A421)

2. Letter, Entergy Nuclear Operations, Inc. to USNRC, "Updated Responses to Orders Applicable to the Proposed Independent Spent Fuel Storage Installation Physical Security Plan," BVY 17-019, dated June 28, 2017 (ty1L 17181A186)
3. Email, Jack Parrott/USN RC 'to Coley Chappell/Entergy Nuclear Operations, Inc., re: "Request for supplemental documentation to support review of the physical security plan," dated August 16, 2017 (ML172298484) .

Dear Sir or Madam:

Pursuant to the provisions of 10 CFR §50.4, §50.54(p ), §73.55(r) and §50.90, Entergy Nuclear Operations, Inc. (ENO) submitted Revision O of the Vermont Yankee Nuclear Power Station (VY), Independent Spent Fuel Storage Installation (ISFSI) Physical Security Plan (PSP)

(Reference 1) .. ENO has also submitted updated responses to the orders for the ISFSI PSP Revision 0 (Reference 2). *

  • _300 I SAFEGUARDS INFORMATION The Enclosure contains "Safeguards Information," which must be protected accordingly. Upon separation
  • from the Enclosure, this letter and its attachment are "DECONTROLLED."

SAFEGUARDS INFORMATION

. BVY 17-032 /Page 2 of2 The purpose of this letter is to provide supplemental documentation to support review of these submittals at the request of the NRC (Reference 3). The NRC's request is provided in the

  • Attachment to this letter, and the response is provided in the Enclosure to this letter.

The Enclosure contains Safeguards Information (SGI). Upon separation from the Enclosure, this letter and the Attachment are decontrolled; This letter contains no new regulatory commitments.

  • Should you have any questions concerning this letter, or require additional information, please contact Mr. Patrick Ryan at (802) 258-5838.

Attachment:

Response to Request for Supplemental Documentation

Enclosure:

_ Supplemental DocumeQtation to Support Review of the Physical Security Plan (SGI) cc: Mr. Daniel H. Dorman (w/o Enclosure)

Regional Administrator, Region 1 U. S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite*100 King of Prussia, PA 19406-2713 Mr. Jack D. Parrott, Senior Project Manager (w/o Enclosure)

Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Mail Stop T-8F5 Washington, DC 20555 Ms. June Tierney, Commissioner (w/o Enclosure)

Vermont Department of Public Service 112 State Street - Drawer 20 Montpelier, Vermont 05602-2601 SAFEGUARDS INFORMATION The Enclosure contains "Safeguards Information;" which must be protected accordingly. Upon separation from the Enclosure, this letter and its attachment are "DECONTROLLED."

SAFEGUARDS INFORMATION BVY 17-032 /Attachment I Page 1 of 1 RE.SPONSE TO REQUEST FOR SUPPLEMENTAL DOCUMENTATION Request:,

To complete our technical review of the Vermont Yankee request (dated March 29, 2017 and supplemented by)etter dated June 28, 2017) to approve the ISFSI physical security plan, please provide copies of the following documents referenced in the submittals: *

1) The blast analysis
2) .A copy of the local law enforcement agency (LLEA) memorandum of agreement And the Vermont Yankee response to the following NRC security orders:
3) EA-02-026 Interim Safeguards and Security Compensatory Measures
4) EA-03-086 Design Basis Threat
5) EA-06-037 Updated Adversary Characteristic - .
6) EA-06-116 ISFSI - Interim Safeguards and Security Compensatory Measures
7) EA-06-117 *. ISFSI - Implementation of Additional Security Measures Associated with Access Authorization
  • . Response:

Copies of the documents listed above are provided in the Enclosure (SGI) to this letter.

Reference information for the responses to the Orders is provided in the table below:

. NRC Order Response EA-02-026 Letter, Vermont Yankee Nuclear Power Corpor~tion to USNRC, "Response to Order for Interim Safeguards and Security Compensatory Measures," BVY 02-015, dated March 18, 2002 (ML020800252)

EA-03-086 Letter, Entergy Nuclear Operations, Inc. to USNRC, "Supplemental Response to Issuance of Orders to Modify License for Revised Design Basis Threat and Compensatory Measures Related to Security Force Training and Fitness-For-Duty," BVY 04-041, dated April 28, 2004

( ML041240302)

EA-06-037 Letter, Entergy Nuclear Operations, Inc. to USNRC, "Vermont Yankee Nuclear Power Station Response to March 20, 2006, Order Requiring

  • Letter, Entergy NuClear Operations, Inc. to USNRC, "Response to Orders EA-06-117 for Interim Safeguards and Security Compensatory Measures and for Implementation of Additional Security Measures Associated with Access Authorization for Vermont Yankee Nuclear Power* Station Independent Spent Fuel Storage Installation," BVY 06-062, dated June 30, 2006 I .

(ML061640313) ** _

For additional information related to responses to Orders, see tabl~ "Applicable Orders for VY ISFSI" provided in Enclosure 1 (page 23 of 30) to BVY 17-003 (Reference 1 of this letter).

SAFEGUARDS INFORMATION The Enclosure contains "Safeguards Information," which must be protected accordingly. Upon separation from the Enclosure, this letter and its attachment are "DECONTROLLED."