BVY 07-006, 10CFR50.46(a)(3)(ii) Annual Report for 2006

From kanterella
(Redirected from BVY 07-006)
Jump to navigation Jump to search
10CFR50.46(a)(3)(ii) Annual Report for 2006
ML070230305
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 01/17/2007
From: Ted Sullivan
Entergy Nuclear Operations, Vermont Yankee
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BVY 07-006
Download: ML070230305 (3)


Text

Entergy Nuclear Operations, Inc.

Vem.tont Yankee P.O. BoX 0500 nt185 Od Ferry Road n

EtBrattleboro, GT 05V302-0500 Tel 802 257 5271 January 17, 2007 BVY 07-006 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

References:

(a) Global Nuclear Fuel Report, 0000-0035-6435-SRLR, Revision 0, Supplemental Reload Licensing Report for Vermont Yankee Nuclear Power Station Reload 24/Cycle 25 (at Current Licensed Power Level of 1593 MWt), September 2005.

(b) Global Nuclear Fuel Report, 0000-0035-6443-SRLR, Revision 0, Supplemental Reload Licensing Report for Vermont Yankee Nuclear Power Station Reload 24/Cycle 25 (with Extended Power Uprate),

December 2005.

(c) Letter, S.A. Richards (USNRC) to J.F. Klapproth (GE), Review of NEDE-23785P, Volume III, Supplement 1, Revision 1, "GESTR-LOCA and SAFER Models for Evaluation of Loss of Coolant Accident, Volume III, Supplement 1, Additional Information for Upper Bound PCT Calculation," February 1, 2002.

(d) Entergy Nuclear Northeast Letter, James M. DeVincentis (Entergy) to USNRC, Vermont Yankee Nuclear Power Station IOCFR50.46(a)(3)(ii)

Annual Report for 2005, BVY 06-002, January 23, 2006.

(e) GE Nuclear Energy Report, GE-NE-0000-00 15-5477-01, Revision 1, Project Task Report Entergy Nuclear Operations Incorporated Vermont Yankee Nuclear Power Station Extended Power Uprate Task T0407:

ECCS-LOCA SAFER/GESTR, September 2004.

(f) Letter, Richard Ennis (USNRC) to Michael Kansler (Entergy), "Vermont Yankee Nuclear Power Station - Issuance of Amendment Re: Extended Power Uprate," NVY 06-028, dated March 2, 2006.

Subject:

Vermont Yankee Nuclear Power Station License No. DPR-28 (Docket No. 50-271) 10CFR50.46(a)(3)(ii) Annual Report for 2006 This letter is to report, in accordance with IOCFR50.46(a)(3)(ii), changes in peak cladding temperature (PCT) for the Vermont Yankee (VY) Emergency Core Cooling System (ECCS) Loss of Coolant Accident (LOCA) analysis. This annual report covers VY Cycle 25 from January 2006 to December 2006.

AW 2_.

BVY 07-006 / page 2 For Cycle 25, VY used the General Electric (GE) SAFER/GESTR methodology for the evaluation of the ECCS/LOCA. The results are summarized in References (a) and (b).

In early 2006, VY implemented a change in its rated power level from 1593 MWth to 1912 MWth in accordance with Reference (f). The SAFER/GESTR-LOCA analysis is based on a power level of 1912 MWth. Analysis at this power level bounds operation at lower power levels.

The GE methodology has been approved by the NRC in Reference (c).

The licensing basis PCT, calculated for the GE14 fuel type VY currently has loaded in its core, including corrections through 2005, is documented in Reference (d).

The following table updates the results to reflect subsequent errors identified in the methodology for the current VY fuel type.

Summary of 10CFR50.46 Errors for Vermont Yankee (2006) 10CFR50.46 Error 10CFR50.46 Error Licensing Basis Delta PCT Identification Description (degF) for GE14 2006-001 Impact of Top Peaked Power 0 Shape for Small Break LOCA Analysis Total Delta PCT 0 Previous Licensing Basis PCT 1960 from References (d) and (e)

Adjusted Licensing Basis PCT 1960 Since the PCT for the GE14 fuel type is well within the acceptance criterion of 10CFR50.46(b)(1), there is no need for re-analysis or other action per 10CFR50.46(a)(3)(ii).

There are no new regulatory commitments being made in this submittal.

If you have any questions concerning this submittal, please contact Mr. David J. Mannai at (802) 451-3304.

Sincerely, Vermont Yankee Nuclear Power Station

BVY 07-006 / page 3 cc: Mr. Samuel J. Collins Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Mr. James J. Shea, Project Manager License Project Directorate 1 Division of Licensing Project Management Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8-B I Washington, DC 20555 USNRC Resident Inspector Vermont Yankee Nuclear Power Station 320 Governor Hunt Road P.O. Box 157 Vernon, VT 05354 Mr. David O'Brien, Commissioner VT Department of Public Service 112 State Street, Drawer 20 Montpelier, VT 05620-2601