MONTHYEARBSEP 12-0106, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition)2012-09-25025 September 2012 License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) Project stage: Request ML13004A3382013-01-0808 January 2013 Acceptance for Review of License Amendment Request for NFPA Standard 805 (TAC Nos. ME9623 and Me9624) Project stage: Acceptance Review ML13123A2312013-05-15015 May 2013 Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 Project stage: RAI ML13141A6222013-05-23023 May 2013 RAI Re. Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (EA-12-051) Project stage: RAI BSEP 13-0066, Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 8052013-06-28028 June 2013 Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 Project stage: Response to RAI BSEP 13-0070, Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 8052013-07-15015 July 2013 Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 Project stage: Response to RAI ML14079A2372013-07-16016 July 2013 Fourth Quarter 2011 Fire Protection Program Health Report, Enclosure 5 Project stage: Other ML14079A2382013-07-16016 July 2013 Fourth Quarter 2012 Fire Protection Program Health Report, Enclosure 6 Project stage: Other BSEP 13-0083, Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 8052013-07-31031 July 2013 Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 Project stage: Response to RAI ML13246A2772013-08-28028 August 2013 Enclosure 3 - Revised Brunswick NFPA 805 Transition Report, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition, Transition Report, August Project stage: Other BSEP 13-0097, Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard (NFPA) 8052013-08-29029 August 2013 Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard (NFPA) 805 Project stage: Response to RAI ML13277A0412013-09-19019 September 2013 Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition Project stage: Other BSEP 13-0107, Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard (NFPA) 805 (NRC TAC Nos. ME9623 and ME9624)2013-09-30030 September 2013 Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard (NFPA) 805 (NRC TAC Nos. ME9623 and ME9624) Project stage: Response to RAI ML14079A2352014-01-0909 January 2014 FIR-NGGC-0009, NFPA 805 Transient Combustibles and Ignition Source Controls Program, Enclosure 3 Project stage: Other ML13365A3202014-01-14014 January 2014 Second Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 Project stage: RAI ML14079A2362014-01-24024 January 2014 Fourth Quarter 2013 Fire Protection Program Health Report, Enclosure 4 Project stage: Other ML14028A1782014-02-12012 February 2014 Second Set of Probabilistic Risk Assessment Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 Project stage: RAI BSEP 14-0023, Response to Second Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 (NRC TAC Nos. ME9623 and ME9624)2014-02-28028 February 2014 Response to Second Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 (NRC TAC Nos. ME9623 and ME9624) Project stage: Request BSEP 14-0029, Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 8052014-03-14014 March 2014 Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 Project stage: Response to RAI BSEP 14-0035, Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 8052014-04-10010 April 2014 Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 Project stage: Response to RAI ML14079A2342014-04-30030 April 2014 BNP-PSA-086, Bnp Fire PRA - Fire Scenario Data, Enclosure 2, Attachment 25 Project stage: Other ML14155A2092014-06-0404 June 2014 E-mail Re. Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 Project stage: RAI BSEP 14-0076, Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 (NRC TAC Nos. ME9623 and ME9624)2014-06-26026 June 2014 Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 (NRC TAC Nos. ME9623 and ME9624) Project stage: Response to RAI ML14205A5922014-07-24024 July 2014 Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 (TAC Nos. ME9623 and ME9624) Project stage: RAI ML14220A2132014-08-0808 August 2014 E-mail Re. Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 Project stage: RAI BSEP 14-0092, Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 (NRC TAC ME9623 and ME9624)2014-08-15015 August 2014 Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 (NRC TAC ME9623 and ME9624) Project stage: Response to RAI BSEP 14-0100, Response to Request Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 8052014-08-29029 August 2014 Response to Request Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 Project stage: Other ML14297A2662014-10-24024 October 2014 Record of Review, Brunswick Steam Electric Plant, Units 1 and 2, LAR Attachment U- Table U-1 Internal Events PRA Peer Review- Facts and Observations (F&Os), 10/24/14 Project stage: Other BSEP 14-0122, Additional Information Regarding License Amendment Request to Adopt Voluntary Risk Initiative National Fire Protection Association Standard 8052014-11-20020 November 2014 Additional Information Regarding License Amendment Request to Adopt Voluntary Risk Initiative National Fire Protection Association Standard 805 Project stage: Request BSEP 14-0134, Additional Information Regarding License Amendment Request to Adopt Voluntary Risk Initiative National Fire Protection Association Standard 805 (NRC TAC Nos. ME9623 and ME9624)2014-12-18018 December 2014 Additional Information Regarding License Amendment Request to Adopt Voluntary Risk Initiative National Fire Protection Association Standard 805 (NRC TAC Nos. ME9623 and ME9624) Project stage: Request ML14310A8082015-01-28028 January 2015 Issuance of Amendment Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(C) Project stage: Approval 2014-01-09
[Table View] |
|
---|
Category:Letter type:BSEP
MONTHYEARBSEP 19-0012, Submittal of 2018 Sea Turtle Annual Report2019-01-17017 January 2019 Submittal of 2018 Sea Turtle Annual Report BSEP 18-0052, Annual Radiological Environmental Operating Report - 20172018-05-10010 May 2018 Annual Radiological Environmental Operating Report - 2017 BSEP 18-0051, Annual Radioactive Effluent Release Report - 20172018-04-26026 April 2018 Annual Radioactive Effluent Release Report - 2017 BSEP 18-0045, Request for License Amendment: Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time2018-04-25025 April 2018 Request for License Amendment: Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time BSEP 18-0054, Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential.2018-04-24024 April 2018 Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential. BSEP 18-0048, Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations2018-04-11011 April 2018 Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations BSEP 18-0044, Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D2018-04-11011 April 2018 Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D BSEP 18-0046, Supplement to Response to Request for Additional Information SRXB-RAI-2 Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2018-04-10010 April 2018 Supplement to Response to Request for Additional Information SRXB-RAI-2 Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0047, Supplement to Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) for End of Interval Leakage Test2018-04-0505 April 2018 Supplement to Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) for End of Interval Leakage Test BSEP 18-0041, Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report2018-04-0404 April 2018 Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report BSEP 18-0043, Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D2018-03-31031 March 2018 Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D BSEP 18-0035, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2018-03-29029 March 2018 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0042, Cycle 22 Core Operating Limits Report (COLR)2018-03-27027 March 2018 Cycle 22 Core Operating Limits Report (COLR) BSEP 18-0040, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for End of Interval Leakage Test2018-03-23023 March 2018 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for End of Interval Leakage Test BSEP 18-0039, Proposed In-Service Inspection Alternative for Application of Dissimilar Metal Weld Full Structural Overlay - Nozzles N4A and N4D2018-03-19019 March 2018 Proposed In-Service Inspection Alternative for Application of Dissimilar Metal Weld Full Structural Overlay - Nozzles N4A and N4D BSEP 18-0034, Corrected Affidavit Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion2018-03-16016 March 2018 Corrected Affidavit Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0032, Additional Testing Information Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion2018-03-14014 March 2018 Additional Testing Information Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0026, Additional Information Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination2018-03-0707 March 2018 Additional Information Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination BSEP 18-0014, Fifth 10-Year Inservice Testing Program Plan2018-02-19019 February 2018 Fifth 10-Year Inservice Testing Program Plan BSEP 18-0021, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865). Without Proprietary Enclosure2018-02-0505 February 2018 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865). Without Proprietary Enclosure BSEP 18-0017, Revision to Radiological Emergency Response Plan and Implementing Procedure2018-01-30030 January 2018 Revision to Radiological Emergency Response Plan and Implementing Procedure BSEP 18-0015, Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations2018-01-23023 January 2018 Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations BSEP 18-0013, Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-01-23023 January 2018 Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control BSEP 18-0001, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2018-01-23023 January 2018 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements BSEP 18-0012, Application to Revise Technical Specifications to Adopt TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.32018-01-23023 January 2018 Application to Revise Technical Specifications to Adopt TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.3 BSEP 18-0009, 2017 Sea Turtle Annual Report2018-01-15015 January 2018 2017 Sea Turtle Annual Report BSEP 17-0098, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors2018-01-10010 January 2018 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors BSEP 17-0119, Snubber Program Plan for Fifth 10-Year Interval Inservice Testing Program2018-01-10010 January 2018 Snubber Program Plan for Fifth 10-Year Interval Inservice Testing Program BSEP 17-0115, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-01-0404 January 2018 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control BSEP 17-0110, Seventh Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions2017-12-20020 December 2017 Seventh Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions BSEP 17-0121, Post-Examination Documentation and Comments for Operator Retake Initial Examination2017-12-14014 December 2017 Post-Examination Documentation and Comments for Operator Retake Initial Examination BSEP 17-0120, Withdrawal of Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension..2017-12-12012 December 2017 Withdrawal of Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension.. BSEP 17-0118, Supplement to Response to Request for Additional Information Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel..2017-12-0707 December 2017 Supplement to Response to Request for Additional Information Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel.. BSEP 17-0117, Response to Request for Additional Information (Probabilistic Risk Assessment and Human Performance Branches) Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1 AC Sources..2017-12-0606 December 2017 Response to Request for Additional Information (Probabilistic Risk Assessment and Human Performance Branches) Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1 AC Sources.. BSEP 17-0116, Response to Request for Additional Information Regarding Request for Risk- Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of ..2017-12-0404 December 2017 Response to Request for Additional Information Regarding Request for Risk- Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of .. BSEP 17-0104, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination2017-11-29029 November 2017 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination BSEP 17-0111, Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements2017-11-28028 November 2017 Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements BSEP 17-0109, Response to Request for Additional Information Regarding Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times And.2017-11-24024 November 2017 Response to Request for Additional Information Regarding Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times And. BSEP 17-0108, Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements2017-11-22022 November 2017 Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements BSEP 17-0017, Submittal of Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material2017-11-15015 November 2017 Submittal of Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material BSEP 17-0100, Fifth 10-Year Inservice Testing Interval2017-11-0202 November 2017 Fifth 10-Year Inservice Testing Interval BSEP 17-0089, Updates to Request for License Amendment Regarding Core Flow Operating Range Expansion2017-11-0101 November 2017 Updates to Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 17-0093, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2017-11-0101 November 2017 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 17-0078, Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.52017-10-0303 October 2017 Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.5 BSEP 17-0076, Registration for Use of General License Spent Fuel Casks2017-09-0606 September 2017 Registration for Use of General License Spent Fuel Casks BSEP 17-0081, Revision to Radiological Emergency Response Plan Implementing Procedures2017-09-0505 September 2017 Revision to Radiological Emergency Response Plan Implementing Procedures BSEP 17-0039, Submittal of Response to Inspection Report 05000324/2015404 and 05000325/2015404, Dated March 30, 2015, Inspection of Interim Cyber Security Milestones 1-7 and Target Set Requirements2017-08-15015 August 2017 Submittal of Response to Inspection Report 05000324/2015404 and 05000325/2015404, Dated March 30, 2015, Inspection of Interim Cyber Security Milestones 1-7 and Target Set Requirements BSEP 17-0071, ISFSI - Registration for Use of General License Spent Fuel Casks2017-08-15015 August 2017 ISFSI - Registration for Use of General License Spent Fuel Casks BSEP 17-0064, Application of Dissimilar Metal Weld Full Structural Overlay on Reactor Pressure Vessel Nozzle N92017-07-10010 July 2017 Application of Dissimilar Metal Weld Full Structural Overlay on Reactor Pressure Vessel Nozzle N9 BSEP 17-0060, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.2017-06-29029 June 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. 2019-01-17
[Table view] |
Text
William R. Gideon Vice President Letter Enclosure 2 Contains Brunswick Nuclear Plant P.O. Box 10429 Security-Related Information - Southport, NC 28461 Withhold in Accordance with 10 CFR 2.390 o: 910.457.3698 November 20, 2014 Serial: BSEP 14-0122 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Additional Information Regarding License Amendment Request to Adopt Voluntary Risk Initiative National Fire Protection Association Standard 805 (NRC TAC Nos. ME9623 and ME9624)
Reference:
- 1. Letter from Michael J. Annacone (Carolina Power & Light Company) to U.S.
Nuclear Regulatory Commission (Serial: BSEP 12-0106), License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Electric Generating Plants (2001 Edition), dated September 25, 2012, ADAMS Accession Number ML12285A428
- 2. Letter from Michael J. Annacone (Carolina Power & Light Company) to U.S.
Nuclear Regulatory Commission (Serial: BSEP 12-0140), Additional Information Supporting License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition), dated December 17, 2012, ADAMS Accession Number ML12362A284
- 3. Letter from George T. Hamrick (Duke Energy) to U.S. Nuclear Regulatory Commission (Serial: BSEP 13-0083), Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 (NRC TAC Nos. ME9623 and ME9624), dated July 31, 2013, ADAMS Accession Number ML13220B041
- 4. Letter from George T. Hamrick (Duke Energy) to U.S. Nuclear Regulatory Commission (Serial: BSEP 14-0023), Response to Second Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition),
dated February 28, 2014, ADAMS Accession Number ML14073A168 When Enclosure 2 is removed, this document is no longer Security-Related
U.S. Nuclear Regulatory Commission Page 2 of 3
- 5. Letter from George T. Hamrick (Duke Energy) to U.S. Nuclear Regulatory Commission (Serial: BSEP 14-0092), Response to Request for Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 (NRC TAC Nos. ME9623 and ME9624),dated August 15, 2014, ADAMS Accession Number M14234A326 Ladies and Gentlemen:
By letter dated September 25, 2012 (i.e., Reference 1), as supplemented by letter dated December 17, 2012 (i.e., Reference 2), Duke Energy Progress Inc., submitted a license amendment request (LAR) to adopt a new, risk-informed, performance-based (RI-PB) fire protection licensing basis for the Brunswick Steam Electric Plant (BSEP), Unit Nos. 1 and 2. As part of July 31,2013 (i.e., Reference 3), and February 28, 2014 (i.e., Reference 4), letters, Duke Energy responded to a request for additional information (RAI) regarding the use of fire watches for hot work activities.
The purpose of this letter is to provide new information regarding the use of a single fire watch for multiple hot work activities. The information in Enclosure 1 of this letter supplements the previous responses to Fire Protection Engineering (FPE) RAI 20. Enclosure 2 provides an updated copy of Attachment S to the LAR that shows the revised implementation action to complete a procedural change for use of a single fire watch for multiple hot work activities. This updated Attachment S supersedes, in its entirety, the Attachment S previously provided as part of Duke Energy's letter dated August 15, 2014 (i.e., Reference 5).
This document contains no new regulatory commitments.
Please refer any questions regarding this submittal to Mr. Lee Grzeck, Manager- Regulatory Affairs, at (91 0) 457-2487.
I declare, under penalty of perjury, that the foregoing is true and correct. Executed on November 20, 2014.
William R. Gideon
Enclosures:
- 1. Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805
- 2. Updated Final License Amendment Request Attachment S, Modifications and Implementation Items (Security-Related information - Withhold from Public Disclosure)
U.S. Nuclear Regulatory Commission Page 3 of 3 cc (with Enclosures 1 and 2):
U.S. Nuclear Regulatory Commission, Region II ATTN: Mr. Victor M. McCree, Regional Administrator 245 Peachtree Center Ave, NE, Suite 1200 Atlanta, GA 30303-1257 U.S. Nuclear Regulatory Commission ATTN: Mr. Andrew Hon (Mail Stop OWFN 8G9A) (Electronic Copy Only) 11555 Rockville Pike Rockville, MD 20852-2738 U.S. Nuclear Regulatory Commission ATTN: Ms. April Scarbeary, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 cc (with Enclosure 1 only):
Chair - North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC 27626-0510 Mr. W. Lee Cox, III, Section Chief (Electronic Copy Only)
Radiation Protection Section North Carolina Department of Health and Human Services 1645 Mail Service Center Raleigh, NC 27699-1645 lee.cox@dhhs.nc.gov
Enclosure 1 Page 1 of 2 Additional Information Regarding Voluntary Risk Initiative National Fire Protection Association Standard 805 By letter dated September 25, 2012, as supplemented by letter dated December 17, 2012, Duke Energy Progress Inc., submitted a license amendment request (LAR) to adopt a new, risk-informed, performance-based (RI-PB) fire protection licensing basis for the Brunswick Steam Electric Plant (BSEP), Unit Nos. 1 and 2. As part of letters dated July 31, 2013, and February 28, 2014, Duke Energy responded to a request for additional information (RAI) regarding the use of fire watches for hot work activities.
The purpose of this letter is to provide new information regarding the use of fire watches for hot work activities. This new information supplements the previous responses to Fire Protection Engineering (FPE) RAI 20.
In response to the portion of the RAI regarding the current practice of allowing for a single, roving fire watch to manage multiple hot work locations, an Attachment S, Table S-2 Implementation Item has been included to revise current fleet procedure AD-EG-ALL-1521, Hot Work Permits, to employ certain limitations and conditions on the use of a single fire watch for multiple hot work activities. These conditions and limitations are contained in NED-M/BMRK-0001, NFPA 51B Code Compliance Calculation, as the justified compliance statement regarding the functional equivalency of the single fire watch. This is supported by the original Attachment "A" Compliance Statement of "Complies," and "Complies via EEEE," for Section 3.3.1.3.1 of NFPA 805.
Functional equivalency for the application of a single (i.e., non-roving) fire watch for multiple hot work activities include the following justification for compliance wording from NED-M/BMRK-0001:
Current procedure, AD-EG-ALL-1521, says "Multiple hot work activities may be covered by a single Hot Work Fire watch provided the hot work is occurring in the same hot work area (approximate 35 foot radius) and are in line of sight of each other."
- That is to say the hot work areas (approximate radius of 35 feet around an activity) overlapping by a large percentage would require only one fire watch for multiple activities.
In addition, factors affecting the overall safety of the hot work still remain the same:
- "Stop work if an adverse condition exists." If any adverse conditions to the hot work area or products of a fire are observed by the fire watch all activities under that fire watch would stop until the situation was remedied.
- "Monitor the Hot Work activity and after Hot Work activity is complete, the Hot Work Firewatch shall remain in the area for 30 minutes after the Hot Work is complete to ensure no outbreak of fire." This means 30 minutes after the last activity is completed under that fire watch.
- "If there is a potential that the Hot Work Area cannot be contained to a single elevation, or the entire Hot Work Area cannot be directly observed by a single Hot Work Firewatch person, then additional Hot Work Firewatches should be established."
Enclosure 1 Page 2 of 2 The use of a single fire watch for multiple activities does not apply when additional fire watches are needed to see the entire hot work area or if there is a chance that slag or sparks cannot be contained to a single elevation.
- A hot work permit will be required for each activity and the 35 foot radius around each activity will be inspected per the requirements listed above. Under Section 1 of AD-EG-ALL-1521, Attachment 4.
This is considered functionally equivalent to the requirements of this code based on the expectation that a fire watch is to view an area of at least 35 ft around a hot work activity to verify that sparks or slag given off from the activity does not start a fire or are able to identify and/or quickly extinguish a fire if one were to occur. The addition of multiple hot work activities in close proximity creates only a minimal alteration to the area the fire watch is expected to cover and the addition of more fire watches to cover the same area has minimal to no impact on the overall safety of the hot work activities.
Accordingly, an Attachment S, Table S-2 Implementation Item has been included to revise current fleet procedure AD-EG-ALL-1521, Hot Work Permits, to employ these limitations and conditions on the use of a single fire watch for multiple hot work activities. Enclosure 2 provides an updated copy of Attachment S of the LAR that shows the revised implementation action to revise fleet procedure AD-EG-ALL-1521 for use of a single fire watch for multiple hot work activities (i.e., Item 10 on page S-10 of Attachment S). This updated Attachment S supersedes, in its entirety, the Attachment S previously provided as part of Duke Energy's letter dated August 15, 2014.