MONTHYEARBSEP 19-0012, Submittal of 2018 Sea Turtle Annual Report2019-01-17017 January 2019 Submittal of 2018 Sea Turtle Annual Report BSEP 18-0052, Annual Radiological Environmental Operating Report - 20172018-05-10010 May 2018 Annual Radiological Environmental Operating Report - 2017 BSEP 18-0051, Annual Radioactive Effluent Release Report - 20172018-04-26026 April 2018 Annual Radioactive Effluent Release Report - 2017 BSEP 18-0045, Request for License Amendment: Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time2018-04-25025 April 2018 Request for License Amendment: Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time BSEP 18-0054, Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential.2018-04-24024 April 2018 Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential. BSEP 18-0048, Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations2018-04-11011 April 2018 Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations BSEP 18-0044, Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D2018-04-11011 April 2018 Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D BSEP 18-0046, Supplement to Response to Request for Additional Information SRXB-RAI-2 Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2018-04-10010 April 2018 Supplement to Response to Request for Additional Information SRXB-RAI-2 Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0047, Supplement to Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) for End of Interval Leakage Test2018-04-0505 April 2018 Supplement to Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) for End of Interval Leakage Test BSEP 18-0041, Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report2018-04-0404 April 2018 Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report BSEP 18-0043, Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D2018-03-31031 March 2018 Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D BSEP 18-0035, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2018-03-29029 March 2018 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0042, Cycle 22 Core Operating Limits Report (COLR)2018-03-27027 March 2018 Cycle 22 Core Operating Limits Report (COLR) BSEP 18-0040, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for End of Interval Leakage Test2018-03-23023 March 2018 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for End of Interval Leakage Test BSEP 18-0039, Proposed In-Service Inspection Alternative for Application of Dissimilar Metal Weld Full Structural Overlay - Nozzles N4A and N4D2018-03-19019 March 2018 Proposed In-Service Inspection Alternative for Application of Dissimilar Metal Weld Full Structural Overlay - Nozzles N4A and N4D BSEP 18-0034, Corrected Affidavit Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion2018-03-16016 March 2018 Corrected Affidavit Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0032, Additional Testing Information Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion2018-03-14014 March 2018 Additional Testing Information Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0026, Additional Information Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination2018-03-0707 March 2018 Additional Information Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination BSEP 18-0014, Fifth 10-Year Inservice Testing Program Plan2018-02-19019 February 2018 Fifth 10-Year Inservice Testing Program Plan BSEP 18-0021, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865). Without Proprietary Enclosure2018-02-0505 February 2018 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865). Without Proprietary Enclosure BSEP 18-0017, Revision to Radiological Emergency Response Plan and Implementing Procedure2018-01-30030 January 2018 Revision to Radiological Emergency Response Plan and Implementing Procedure BSEP 18-0015, Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations2018-01-23023 January 2018 Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations BSEP 18-0013, Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-01-23023 January 2018 Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control BSEP 18-0001, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2018-01-23023 January 2018 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements BSEP 18-0012, Application to Revise Technical Specifications to Adopt TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.32018-01-23023 January 2018 Application to Revise Technical Specifications to Adopt TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.3 BSEP 18-0009, 2017 Sea Turtle Annual Report2018-01-15015 January 2018 2017 Sea Turtle Annual Report BSEP 17-0098, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors2018-01-10010 January 2018 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors BSEP 17-0119, Snubber Program Plan for Fifth 10-Year Interval Inservice Testing Program2018-01-10010 January 2018 Snubber Program Plan for Fifth 10-Year Interval Inservice Testing Program BSEP 17-0115, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-01-0404 January 2018 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control BSEP 17-0110, Seventh Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions2017-12-20020 December 2017 Seventh Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions BSEP 17-0121, Post-Examination Documentation and Comments for Operator Retake Initial Examination2017-12-14014 December 2017 Post-Examination Documentation and Comments for Operator Retake Initial Examination BSEP 17-0120, Withdrawal of Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension..2017-12-12012 December 2017 Withdrawal of Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension.. BSEP 17-0118, Supplement to Response to Request for Additional Information Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel..2017-12-0707 December 2017 Supplement to Response to Request for Additional Information Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel.. BSEP 17-0117, Response to Request for Additional Information (Probabilistic Risk Assessment and Human Performance Branches) Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1 AC Sources..2017-12-0606 December 2017 Response to Request for Additional Information (Probabilistic Risk Assessment and Human Performance Branches) Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1 AC Sources.. BSEP 17-0116, Response to Request for Additional Information Regarding Request for Risk- Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of ..2017-12-0404 December 2017 Response to Request for Additional Information Regarding Request for Risk- Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of .. BSEP 17-0104, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination2017-11-29029 November 2017 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination BSEP 17-0111, Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements2017-11-28028 November 2017 Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements BSEP 17-0109, Response to Request for Additional Information Regarding Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times And.2017-11-24024 November 2017 Response to Request for Additional Information Regarding Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times And. BSEP 17-0108, Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements2017-11-22022 November 2017 Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements BSEP 17-0017, Submittal of Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material2017-11-15015 November 2017 Submittal of Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material BSEP 17-0100, Fifth 10-Year Inservice Testing Interval2017-11-0202 November 2017 Fifth 10-Year Inservice Testing Interval BSEP 17-0089, Updates to Request for License Amendment Regarding Core Flow Operating Range Expansion2017-11-0101 November 2017 Updates to Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 17-0093, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2017-11-0101 November 2017 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 17-0078, Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.52017-10-0303 October 2017 Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.5 BSEP 17-0076, Registration for Use of General License Spent Fuel Casks2017-09-0606 September 2017 Registration for Use of General License Spent Fuel Casks BSEP 17-0081, Revision to Radiological Emergency Response Plan Implementing Procedures2017-09-0505 September 2017 Revision to Radiological Emergency Response Plan Implementing Procedures BSEP 17-0039, Submittal of Response to Inspection Report 05000324/2015404 and 05000325/2015404, Dated March 30, 2015, Inspection of Interim Cyber Security Milestones 1-7 and Target Set Requirements2017-08-15015 August 2017 Submittal of Response to Inspection Report 05000324/2015404 and 05000325/2015404, Dated March 30, 2015, Inspection of Interim Cyber Security Milestones 1-7 and Target Set Requirements BSEP 17-0071, ISFSI - Registration for Use of General License Spent Fuel Casks2017-08-15015 August 2017 ISFSI - Registration for Use of General License Spent Fuel Casks BSEP 17-0064, Application of Dissimilar Metal Weld Full Structural Overlay on Reactor Pressure Vessel Nozzle N92017-07-10010 July 2017 Application of Dissimilar Metal Weld Full Structural Overlay on Reactor Pressure Vessel Nozzle N9 BSEP 17-0060, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.2017-06-29029 June 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. 2019-01-17
[Table view] |
Text
a0 CP&L Probress EneWCorr Co 10 CFR 50.55a(a)(3)(i)
JAN 2 0 2004 SERIAL: BSEP 04-0007 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Docket Nos. 50-325 and 50-324/License Nos. DPR-71 and DPR-62 Request to Use American Society of Mechanical Engineers (ASME)
Boiler and Pressure Vessel Code Case N-663 Ladies and Gentlemen:
In accordance with 10 CFR 50.55a(a)(3)(i), Carolina Power & Light (CP&L) Company, now doing business as Progress Energy Carolinas, Inc., requests the NRC approve the use of an alternative to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI requirements regarding examination of Class 2, Examination Category C-F-2 piping welds at the Brunswick Steam Electric Plant (BSEP),
Units 1 and 2. Enclosure 1 provides a copy of the proposed alternative, designated as Relief Request RR-33. Enclosure 2 provides a copy of ASME Code Case N-663.
The proposed alternative will allow BSEP, Units 1 and 2, to avoid unnecessary examinations and radiological dose, while maintaining an acceptable level of quality and safety for the examination of the affected welds. The relief request is applicable to the third 10-year inservice inspection interval for BSEP, Units 1 and 2. The applicable code of record for this inspection interval is the 1989 Edition, with no Addenda, of the ASME Code,Section XI.
Progress Energy Carolinas, Inc. requests approval of the enclosed relief request by July 1, 2004. Approval of the alternative is requested for the remainder of the third 10-year inservice inspection program, or until Code Case N-663 is published in a future version of NRC Regulatory Guide (RG) 1.147, Inservice Inspection Code Case Acceptability - ASME Section XI, Division 1, in which case the provisions of the Code Case N-663 conditions and limitations specified in RG 1.147 will be followed.
Similar requests for relief have been granted to the Arkansas Nuclear 1, Grand Gulf, River Bend, and Waterford 3 plants (i.e., refer to ADAMS Accession Numbers ML030150438 and ML032390190), and requested by the Indian Point and Pilgrim plants (i.e., refer to ADAMS Accession Number ML033490593).
Brunswick Nuclear Plant P.O.Box 10429 Southport, NC 28461 A JW Yl
Document Control Desk BSEP 04-0007 / Page 2 There are no new commitments made in this letter. Please refer any questions regarding this submittal to Mr. Leonard R. Beller, Supervisor - Licensing/Regulatory Programs, at (910) 457-2073.
Sincerely, Edward T. ONeil Manager - Support Services Brunswick Steam Electric Plant WRM/wrm
Enclosures:
- 1. Relief Request (RR) 33, Revision 0-Alternative to Surface Examination on Class 2 Piping per Code Case N-663
- 2. ASME Code Case N-663 (For Information)
Document Control Desk BSEP 04-0007 / Page 3 cc (with enclosures):
U. S. Nuclear Regulatory Commission, Region II ATTN: Mr. Luis A. Reyes, Regional Administrator Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303-8931 U. S. Nuclear Regulatory Commission A'ITN: Mr. Eugene M. DiPaolo, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 U. S. Nuclear Regulatory Commission (Electronic Copy Only)
ATTN: Ms. Brenda L. Mozafari (Mail Stop OWFN 8G9) 11555 Rockville Pike Rockville, MD 20852-2738 Ms. Jo A. Sanford Chair - North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC 27626-0510 Mr. Jack Given, Bureau Chief North Carolina Department of Labor Boiler Safety Bureau 1101 Mail Service Center Raleigh, NC 27699-1101
BSEP 04-0007 Enclosure 1 Page 1 of 3 Relief Request (RR) 33, Revision 0-Alternative to Surface Examination on Class 2 Piping per Code Case N-663
- 1. Components Affected Component Numbers: ASME Code,Section XI, Class 2 piping welds Examination Category: Category C-F-2 Item Numbers: C5.50, C5.60, C5.80
- 2. Applicable Code Edition and Addenda The code of record for the third 10-year inservice inspection interval is the American Society of Mechanical Engineers (ASME) Code,Section XI, 1989 Edition, with no addenda.
- 3. Code Requirement The ASME Code,Section XI, IWC-2500 requires components to be examined and pressure tested as specified in Table IWC-2500-1. This table requires a sampling of piping welds, as well as other components, to be subjected to various types of non-destructive examinations (NDE) (i.e., volumetric and/or surface examinations) and pressure testing (i.e., visual VT-2).
- 4. Proposed Alternative In accordance with 10 CFR 50.55a(a)(3)(i), Progress Energy Carolinas, Inc. proposes to use ASME Code Case N-663, in its entirety, as an alternative to the surface examination requirements of Table IWC-2500-1 for examination category C-F-2.
- 5. Reason for Request The ASME Code,Section XI, IWC-2500, requires surface examinations of the general population of Category C-F-2 welds. The proposed alternative described in ASME Code Case N-663 would require surface examination of areas identified as being susceptible to outside surface attack, thereby avoiding unnecessary examinations and radiological dose while maintaining an acceptable level of quality and safety for the examination of the affected welds.
BSEP 04-0007 Enclosure 1 Page 2 of 3
- 6. Basis for Use The subject item numbers in the ASME Code,Section XI require a volumetric and/or surface examination on selected piping welds to ensure that generic degradation mechanisms are not active on either the inside diameter (I.D.) or the outside diameter (O.D.). However, these welds are selected using a deterministic set of requirements that are not based upon degradation mechanisms. ASME Code Case N-663 provides an alternative to the current ASME Code,Section XI requirements for defining the number and location of surface examinations for piping components.
The ASME Section XI Task Force on Inservice Inspection Optimization, Report No. 92-01-01, Evaluation of Inservice Inspection Requirementsfor Class 1, CategoryB-J PressureRetaining Welds in Piping, dated July 1995, concluded, with 50 units responding with a total of 9333 welds inspected, only two welds (i.e., 0.02%) were found to have flaws detected by Section XI surface examinations. These flaws were determined to be fabrication-induced.
In parallel with the above, several risk-informed code cases have been developed for use on piping welds (e.g. ASME Code Cases N-560, N-577, and N-578). One of the methods for risk-informing piping examinations is through use of Electric Power Research Institute (EPRI) topical report TR-1 12657, Revision B-A, Revised Risk-Informed Inservice Inspection Evaluation Procedure,approved by NRC safety evaluation dated October 28, 1999.
Table 4-1, Summary of Degradation-SpecificInspection Requirements and Examination Methods, of the EPRI report lists the required degradation mechanisms to be evaluated in Class 1, 2, and 3 piping. It identifies the risk-informed examination method required for each of these degradation mechanisms. The only degradation mechanism that requires a surface examination is O.D. chloride cracking. These two initiatives led ASME to investigate the value of surface examinations.
Code Case N-663 incorporated lessons learned from the risk-informed initiatives and industry examination experience into Section XI by requiring that an evaluation be conducted to identify locations, if any, where a surface examination would be of benefit from a generic piping degradation perspective. The results of this evaluation identify where O.D.
degradation is most likely to occur by reviewing plant-specific programs and practices and operating experience. If the potential for degradation is identified, Code Case N-663 defines examination techniques, volumes, and frequencies. As such, implementing Code Case N-663 will identify appropriate locations for surface examination, if any, and eliminate the unnecessary examinations. OtherASME Code,Section XI examination requirements for the subject piping welds, including volumetric examinations and pressure testing, will continue to be performed.
Code Case N-663 was approved by the ASME Boiler and Pressure Vessel Code Committee on September 17, 2002, but has not yet been included in the most recent listing of NRC
BSEP 04-0007 Enclosure 1 Page 3 of 3 approved code cases provided in Revision 13 of Regulatory Guide (RG) 1.147, Inservice Inspection Code Case Acceptability - ASME Section XI Division 1.
- 7. Duration of Proposed Alternative Approval of the alternative is requested for the remainder of the third 10-year inservice inspection program. If Code Case N-663 is published in a future version of RG 1.147, the provisions of the Code Case N-663 conditions and limitations specified in RG 1.147 will be followed.
- 8. References
- 1. ASME Code,Section XI, Rules for Inservice Inspection of NuclearPower Plant Components, 1989 Edition (no Addenda).
- 2. Title 10 of the Code of Federal Regulations, Part 50, Section 55a, Codes and Standards (i.e., 10 CFR 50.55a).
- 3. ASME Section XI Task Group on ISI Optimization, Report No. 92-01-01, Evaluation of Inservice Inspection Requirementsfor Class 1 Category B-J PressureRetaining Welds in Piping, dated July 1995.
- 4. ASME Code Case N-663, Alteniative Requirementsfor Classes 1 and 2 Surface Examinations,Section XI, Division 1.
- 5. NRC Regulatory Guide 1.147, Inservice Inspection Code CaseAcceptability,ASME Section XI, Division 1, Revision 13, June 2003.
BSEP 04-0007 Enclosure 2 ASMIE Code Case N-663
CASE N-663 CASES OF ASNIE BOILER AND PRESSURE VESSEL CODE Approval Date: September 17, 2002 See Numeric Index for expiration and any reaffirmation dates.
Case N-663 Susceptibility to outside surface attack shall be deter-Alternative Requirements for Classes 1 and 2 mined in accordance with Table 1.
Surface Examinations Examination Category B-F less than NPS 4 and Section XI, Division 1 Examination Category B-1 less than NPS 4 shall be examined in accordance with IWB-2500.
Inquiry: What alternative to the surface examination All areas identified as susceptible to outside surface requirements for piping welds of Examination Catego- attack shall be examined during each interval. The ries B-F, B-J, C-F-i, and C-F-2 may be used? requirements of IWB -2411, IWVB-2412, IWC-24 11, and INVC-2412, as applicable, shall be met. Acceptance Reply: It is the opinion of the Committee that in standards shall be in accordance with IVB-3514 or lieu of the surface examination requirements for piping INVC-35 14, as applicable. The areas shall be reexamined welds of Examination Category B-F (NPS 4 and larger), in the same sequence, during subsequent inspection B-J (NPS 4 and larger), C-F-i, and C-F-2, surface intervals over the service lifetime of the piping item, examinations may be limited to areas identified by the to the extent practical.
Owner as susceptible to outside surface attack.
TABLE 1 SUSCEPTIBILITY CRITERIA Mechanism Criteria External chloride
- austenitic stainless steel base metal, welds, or heat affected zone (HAZ),
stress corrosion and cracking
- operating temperature > 150'F, and
- a piping outside surface is within five pipe diameters of a probable leak path (e.g., valve stem) and is covered with nonmetallic insulation that is not in compliance with U.S. NRC Regulatory Guide 1.36 (e.g., chloride content) or equivalent requirements or
- austenitic stainless steel base metal, welds, or HAZ, and
- a piping outside surface is exposed to wetting from a concentrated chloride-bearing environment (e.g., seawater, brackish water, brine)
Other outside surface Items identified as susceptible to outside surface attack by a plant-specific initiated service history review. This review should include plant-specific processes mechanisms and programs that minimize chlorides and other contaminants.
1183 SUPP. 6 - NC