Application for Amend to License DPR-35,changing Tech Specs to Replace Halon 1301 Sys in Place of CO2 Sys in Cable Spreading Room
ML20094J185
Person / Time
Site: Pilgrim
Issue date: 08/09/1984
From: Harrington W
BOSTON EDISON CO.
To: Vassallo D
Office of Nuclear Reactor Regulation
Shared Package
ML20094J191 List:
References
BECO-84-129, NUDOCS 8408140251
Download: ML20094J185 (2)


Text

r; BOSTON ED150N CC 4PANY B00 BOYLSTO N STREET BOSTON. MABBACHUBETTu 02199 WILLIAM D. HARRINGTON August 9, 1984

==

BECo 84-129 Proposed Change 84-11 Mr. Domenic B. Vassallo, Chief Operating Reactors Branch #2 Division of Licensing Of fice of Nuclear Reactor Regulation U.S. Nuclear Regulatory Consnission Washington, D.C. 20555 License No. DPR-35 Docket No. 50-293 Proposed Change to Fire Protection Technical Specification

Dear Sir:

On March 27, 1984, Boston Edison (BEco) submitted the final Fire Protection Technical Specification package which was an assimilation of five (5) previously submitted packages (#1 - 7/11/83; #2 - 9/12/83; #3 - 10/13/83; #4 -

11/16/83; #5 - 5/12-28/83). The October 13, 1983 package substituted a Halon 1301 system in place of the CO2 system in the Cable Spreading Room in anticipation of an approved Halon test in December 1983. When the test was initiated, however, the Halon system failed to meet the specified BECo test criteria. As a result, the rechnical Specifications for the Halon system were replaced by the original CO2 system Technical Specifications in the March 27, 1984 assimilation.

Since that time, an additional test was initiated, and the Halon system has successfully met the test criteria. This submittal contains the Technical Specifications for the Halon system which replaces the CO2 system in the Cable Spreading Room.

The CO2 system section designation was originally changed from 3/4.12D to 3/4.12E in the May 13, 1983 schedule of change submittal. In the event this change is approved before the consolidated March 27, 1984 submittal, please ensure that it replaces the CO2 system technical specifications regardless of the letter designation.

Aco4 N

  • c h ec. K. Ree!d s4os24oasi P" ^m e4oso, s 2p Ill -

EDCTON EDCON COMPANY Mr. Domenic B. Vassallo, Chief August 9, 1984 Page 2 BECo respectfully requests your expedient analysis, concurrence and response to this Technical Specification submittal for the Halon 1301 system so that we may utilize the system as an integral part of our fire protection program.

Very truly yours, ERM/n3 Attachment Commonwealth of Massachusetts)

County of Suffolk )

Then personally appeared before me W. D. Harrington, who, being duly sworn, did state that he is Senior Vice President - Nuclear of Boston Edison Company, the applicant herein, and that he is duly authorized to execute and file the submittal contained herein in the name and on behalf of Boston Edison Company and that the statements in said submittal are true to the best of his knowledge and belief.