BECO-84-128, Application for Amend to License DPR-35,changing Tech Specs to Provide Redundant Temp Monitoring Sys for Suppression Pool & Responding to Portions of TMI Action Plan Requirements of NUREG-0737

From kanterella
Jump to navigation Jump to search
Application for Amend to License DPR-35,changing Tech Specs to Provide Redundant Temp Monitoring Sys for Suppression Pool & Responding to Portions of TMI Action Plan Requirements of NUREG-0737
ML20094J133
Person / Time
Site: Pilgrim
Issue date: 08/09/1984
From: Harrington W
BOSTON EDISON CO.
To: Vassallo D
Office of Nuclear Reactor Regulation
Shared Package
ML20094J139 List:
References
RTR-NUREG-0737, RTR-NUREG-737 BECO-84-128, NUDOCS 8408140239
Download: ML20094J133 (1)


Text

.

COCTON EDISON COMPANY 800 BOvLaTON STREET BOSTON, M As s ACHus ETTs 0 219 9 WILLI AM O. H ARRINGTO N August 9, 1984

........o .......-' BECo 84-128 Proposed Change 84-10 Mr. Domenic B. Vassallo, Chief Operating Reactors Branch #2 Division of Licensing Of fice cf Nuclear Reactor Regulation U.S. Nuclear Regulatcry Commission Washington, D.C. 20555 License No. DPR-35 Docket No. 50-293 Torus Temperature /TMI Modifications Technical Specification Changes

Dear Sir:

Pursuant to 10CFR50.90, the Boston Edison Company hereby proposes the attached modificati0ni tc Appendix A of Operating License No. CPR-35. These proposed modifications have been provided to conform with the requirements of NUREG 0661 and Reg. Guide 1.97, Type A variable, and NUREG 0737. The first provides a redundant temperature monitoring system for the suppression pool, and the second segment responds to portions of the TM1 Action Plan Requirements of NUREG-0737.

The Torus Temperature modifications add new dimensions to our operational activities and limiting conditions, and are essential for emplacement prior to start up. Installation and intensive testing of the system precluded submittal prior to this time.

Very truly yours, ERM/ns l

Attachment 3 signed originals and 40 copies Commonwealth of Massachusetts)

County of Suffolk )

Roel Then personally appeared before me W. D. Harrington, who, being duly sworn,

\\

l did state that he is Senior Vice President - Nuclear of Boston Edison Company, the applicant herein, and that he is duly authorized to execute and file the submittal contained herein in the name and on behalf of Boston Edison Company and that the statements in said submittal are true to the best of his knowledge and belief.

My Commission expires: 6h.2/'/988 M Q'm 4 A-A qg1sM 8408140239 840009

" 1"" " c F e 1tso g= == *"*i?;!