AEP-NRC-2014-92, Notification of Implementation of License Renewal Activities for Entrance Into Period of Extended Operation

From kanterella
Jump to navigation Jump to search
Notification of Implementation of License Renewal Activities for Entrance Into Period of Extended Operation
ML14309A528
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 11/03/2014
From: Gebbie J
American Electric Power, Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP-NRC-2014-92
Download: ML14309A528 (2)


Text

INDIANA Indiana Michigan Power MICHIGAN Cook Nuclear Plant POWER One Cook Place Bridgman, MI 49106 A unit ofAmerican Electric Power Indiana Michigan Power.com November 3, 2014 AEP-NRC-2014-92 10 CFR 50.4 Docket Nos.: 50-315 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Donald C. Cook Nuclear Plant Unit 1 NOTIFICATION OF IMPLEMENTATION OF LICENSE RENEWAL ACTIVITIES FOR ENTRANCE INTO PERIOD OF EXTENDED OPERATION

References:

1. NUREG-1831, "Safety Evaluation Report Related to the License Renewal of the Donald C. Cook Nuclear Plant, Units 1 and 2," dated May 2005 (Agencywide Documents

- Access and Management System (ADAMS) Accession No. ML052230442).

2. Letter from J. Rowley, U. S. Nuclear Regulatory Commission, to M. K. Nazar, Indiana Michigan Power Company, "Donald C. Cook Nuclear Plant, Units 1 and 2-Issuance of Renewed Facility Operating License Nos. DPR-58 and DPR-74," dated August 30, 2005 (ADAMS Accession No. ML052340411).

Pursuant to Operating License Condition 2.K. of the Donald C. Cook Nuclear Plant (CNP) Facility Operating License (DPR-58), which was issued per Reference 2, Indiana Michigan Power Company confirms that the CNP Unit 1 license renewal commitments of Reference 1, required to be implemented prior to entry into the period of extended operation, are complete. - -----

There are no commitments contained in this letter. Should you have any questions, please contact Mr. Michael K. Scarpello, Regulatory Affairs Manager, at (269) 466-2649.

Sincerely, Joel P. Gebbie Site Vice President DMB/amp 0l4

U.S. Nuclear Regulatory Commission AEP-NRC-2014-92 Page 2 c: M. L. Chawla, NRC Washington, D.C.

J. T. King - MPSC MDEQ- RMD/RPS NRC Resident Inspector C. D. Pederson, NRC Region III A. J. Williamson -AEP Ft. Wayne