MONTHYEARML22363A5622023-01-0404 January 2023 Relief Request ISIR-5-06 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles ML21295A0092021-11-0303 November 2021 Relief Request ISIR-4-11 Limited Coverage Examinations During the Fourth 10 Year Inservice Inspection Interval ML21141A2612021-06-0202 June 2021 Alternative Request REL-PP2 Related to Fifth 10-Year Inservice Testing Program Interval ML21130A0082021-05-12012 May 2021 Relief Request ISIR-5-05 Related to ASME Code Case N 729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles (EPID L-2021-LLR-0033 (COVID-19)) ML21034A1552021-02-12012 February 2021 Relief Request ISIR-5-04 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles ML20290A4252020-10-15015 October 2020 Verbal Authorization of Relief Request ISIR-5-04 Regarding Alternative to N-729-6 for RPV Head Visual Examination AEP-NRC-2020-65, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-042020-10-0505 October 2020 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-04 ML20247J6562020-09-10010 September 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML19196A0642019-08-23023 August 2019 Relied Request ISIR-4-10 Regarding Fourth Inservice Inspection Program Interval ML18284A3102018-10-26026 October 2018 Approval of Alternative to the ASME Code Regarding Reactor Vessel Weld Examination - Relief Request ISIR-4-08 AEP-NRC-2018-33, Proposed Alternative Request for Elimination of the Reactor Pressure Vessel Threads in Flange Examination2018-06-14014 June 2018 Proposed Alternative Request for Elimination of the Reactor Pressure Vessel Threads in Flange Examination AEP-NRC-2018-20, Request for Alternative from Volumetric/Surface Examination Frequency Requirement of ASME Code Case N-729-4, Request Number Isir 04-5, Revision 12018-03-14014 March 2018 Request for Alternative from Volumetric/Surface Examination Frequency Requirement of ASME Code Case N-729-4, Request Number Isir 04-5, Revision 1 ML17096A6272017-04-12012 April 2017 Proposed Alternative to Use ASME OM Code Case OMN-20 ML16054A5722016-03-0404 March 2016 Relief Request REL-002 Associated with Valve Seat Leakage Testing ML15299A0482015-10-29029 October 2015 Alternative Isir 4-06 to the Requirements of the ASME Code AEP-NRC-2015-31, Submittal of 10 Cer 50.55a Requests Associated with the Fifth Ten-Year Inservice Testing Interval2015-07-31031 July 2015 Submittal of 10 Cer 50.55a Requests Associated with the Fifth Ten-Year Inservice Testing Interval ML15156A9062015-06-11011 June 2015 Request for Use of Alternative Isir 04-02 Associated with Reactor Vessel Closure Head Volumetric/Surface Examination Frequency Requirements for the Inservice Inspection Program AEP-NRC-2011-23, Relief Requests for Limited Coverage Examinations Performed in the Third 10-Year Inspection Interval2011-04-0808 April 2011 Relief Requests for Limited Coverage Examinations Performed in the Third 10-Year Inspection Interval AEP-NRC-2009-52, Third and Fourth Ten-Year Interval Inservice Inspection Program Relief Request ISIR-312009-08-21021 August 2009 Third and Fourth Ten-Year Interval Inservice Inspection Program Relief Request ISIR-31 AEP-NRC-2009-26, Request to Extend the Inservice Inspection Interval for Reactor Vessel Weld Examination - Relief Request ISIR-302009-02-27027 February 2009 Request to Extend the Inservice Inspection Interval for Reactor Vessel Weld Examination - Relief Request ISIR-30 ML0903300652009-02-18018 February 2009 Relief Requests ISIR-23, ISIR-24 and ISIR-25 on End-of-Interval System Pressure Testing of Class 1 Components ML0830102372008-10-0707 October 2008 Relief Requests for Reactor Vessel Shell-to-Flange, and Nozzle to Safe-end Weld Examination AEP-NRC-2008-25, Use of Weld Inlays as an Alternative Repair Technique for Reactor Vessel Safe End-to-Primary Nozzle Alloy 82/182 Welds2008-10-0707 October 2008 Use of Weld Inlays as an Alternative Repair Technique for Reactor Vessel Safe End-to-Primary Nozzle Alloy 82/182 Welds ML0634200332006-12-29029 December 2006 Correction of Safety Evaluation Associated with Authorization of an Alternative ML0617301752006-06-28028 June 2006 D.C. Cook, Relief, Relief Requests for the Fourth 10-Year Pump and Valve Inservice Testing Program Interval ML0616403122006-06-0202 June 2006 Fourth 10-Year Interval Pump and Valve Inservice Testing Program - Request for Additional Information ML0607606732006-04-0303 April 2006 Relief Request REL-PP6 Regarding the West Essential Service Water Pump Test Frequency ML0603206912006-02-16016 February 2006 Alternatives Regarding Requirements for Examination of Dissimilar Metal Piping Welds ML0526503262005-09-13013 September 2005 Proposed Alternative to the American Society of Mechanical Engineers Code, Section XI Repair Requirements ML0517200062005-06-27027 June 2005 6/27/05, D.C. Cook, Unit 1, Alternative to Repair Requirements of Section XI of the American Society of Mechanical Engineers Code ML0307708822003-04-0202 April 2003 DC Cook, Units 1 & 2, Relief, Use of Alternatives to Pressure Retaining Bolting Inspection Requirements of American Society of Mechanical Engineers Boiler and Pressure Vessel Code Relief Isir 11 Thru 13, MB6352, MB6353, MB6354, MB6355, MB63 2023-01-04
[Table view] Category:Letter type:AEP
MONTHYEARAEP-NRC-2024-70, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control2024-12-16016 December 2024 Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control AEP-NRC-2024-86, Unit 2 - Decommissioning Funding Plan for Independent Spent Fuel Storage Installation2024-12-0909 December 2024 Unit 2 - Decommissioning Funding Plan for Independent Spent Fuel Storage Installation AEP-NRC-2024-77, U2C28 Steam Generator Tube Inspection Report2024-10-21021 October 2024 U2C28 Steam Generator Tube Inspection Report AEP-NRC-2024-80, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2024-10-15015 October 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-79, Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask2024-09-26026 September 2024 Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask AEP-NRC-2024-78, Reply to a Notice of Violation: EA-24-0472024-09-23023 September 2024 Reply to a Notice of Violation: EA-24-047 AEP-NRC-2024-69, Core Operating Limits Report2024-09-0909 September 2024 Core Operating Limits Report AEP-NRC-2024-76, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-08-28028 August 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-51, Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes2024-08-28028 August 2024 Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes AEP-NRC-2024-61, Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request2024-08-15015 August 2024 Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request AEP-NRC-2024-62, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-08-0707 August 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-47, Form OAR-1, Owners Activity Report2024-07-30030 July 2024 Form OAR-1, Owners Activity Report AEP-NRC-2024-56, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-07-0808 July 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-48, Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-07-0202 July 2024 Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-45, Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring2024-06-13013 June 2024 Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2024-23, Core Operating Limits Report2024-05-23023 May 2024 Core Operating Limits Report AEP-NRC-2024-40, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-05-16016 May 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-41, Annual Radiological Environmental Operating Report2024-05-15015 May 2024 Annual Radiological Environmental Operating Report AEP-NRC-2024-26, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 492024-05-14014 May 2024 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 49 AEP-NRC-2024-07, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2024-05-14014 May 2024 Unit 2 - Transmittal of Report of Changes to the Emergency Plan AEP-NRC-2024-24, Form OAR-1, Owners Activity Report2024-05-0707 May 2024 Form OAR-1, Owners Activity Report AEP-NRC-2024-35, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-30030 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2024-28, 2023 Annual Radioactive Effluent Release Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report AEP-NRC-2024-31, Annual Report of Individual Monitoring2024-04-24024 April 2024 Annual Report of Individual Monitoring AEP-NRC-2024-29, (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-072024-04-0303 April 2024 (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-07 AEP-NRC-2024-02, Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-04-0303 April 2024 Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-19, Annual Report of Property Insurance2024-04-0101 April 2024 Annual Report of Property Insurance AEP-NRC-2024-04, License Amendment Request Regarding a Change to Unit 1 Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System2024-03-0606 March 2024 License Amendment Request Regarding a Change to Unit 1 Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System AEP-NRC-2024-03, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2024-03-0606 March 2024 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors AEP-NRC-2024-11, Unit 2 - Response to Request for Additional Information on Requested Change Regarding Neutron Flux Instrumentation2024-02-27027 February 2024 Unit 2 - Response to Request for Additional Information on Requested Change Regarding Neutron Flux Instrumentation AEP-NRC-2024-10, Form OAR-1, Owners Activity Report2024-02-0707 February 2024 Form OAR-1, Owners Activity Report AEP-NRC-2024-01, Emergency Plan Revision 482024-01-0808 January 2024 Emergency Plan Revision 48 AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor2023-12-20020 December 2023 Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation AEP-NRC-2023-40, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2023-08-29029 August 2023 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes AEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation2023-08-0202 August 2023 Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation AEP-NRC-2023-29, Core Operating Limits Report2023-06-19019 June 2023 Core Operating Limits Report AEP-NRC-2023-32, Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations2023-06-0606 June 2023 Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2023-33, Renewable Operating Permit2023-06-0505 June 2023 Renewable Operating Permit AEP-NRC-2023-30, Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump2023-06-0101 June 2023 Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-27, Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Annual Radiological Environmental Operating Report AEP-NRC-2023-19, Annual Radioactive Effluent Release Report2023-04-30030 April 2023 Annual Radioactive Effluent Release Report AEP-NRC-2023-23, Annual Report of Individual Monitoring for 20222023-04-24024 April 2023 Annual Report of Individual Monitoring for 2022 AEP-NRC-2023-24, Notification of Ph Non-Compliance for Turbine Room Sump2023-04-12012 April 2023 Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-20, Annual Report of Property Insurance2023-04-0303 April 2023 Annual Report of Property Insurance AEP-NRC-2023-15, Decommissioning Funding Status Report2023-03-28028 March 2023 Decommissioning Funding Status Report AEP-NRC-2023-11, Form OAR-1, Owners Activity Report2023-01-31031 January 2023 Form OAR-1, Owners Activity Report AEP-NRC-2023-02, Request for Approval of Change Regarding Neutron Flux Instrumentation2023-01-26026 January 2023 Request for Approval of Change Regarding Neutron Flux Instrumentation AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring2022-12-15015 December 2022 Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in2022-12-12012 December 2022 Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in 2024-09-09
[Table view] |
Text
Indiana Michigan Power Company Nuclear Generation Group INDIANA One Cook Place MICHIGAN Bridgman, MI 49106 POWER aep.com August 21, 2009 AEP-NRC-2009-52 10 CFR 50.55a U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001
SUBJECT:
Donald C. Cook Nuclear Plant Unit 1 Docket No. 50-315 Third and Fourth Ten-Year Interval Inservice Inspection Program Relief Request ISIR-31
Dear Sir or Madam:
Pursuant to 10 CFR 50.55a(a)(3)(ii), Indiana Michigan Power Company (I&M), the licensee for Donald C. Cook Nuclear Plant Unit 1, hereby requests Nuclear Regulatory Commission approval of the following request for the Unit 1 third and fourth ten-year interval inservice inspection program:
Relief Request ISIR-31 proposes visual examination during system leakage test of the pressurizer surge nozzle as an alternative to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Table IWB-2500-1 volumetric examination requirement or the enhanced visual examination requirement of 10 CFR 50.55a(b)(2)(xxi), which may be performed instead of an ultrasonic examination. Compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
The details of the 10 CFR 50.55a requests are enclosed.
I&M requests approval by February 3, 2010, to allow use of the alternative during the Unit 1 Cycle 23 refueling outage.
There are no new or revised commitments in this letter. Should you have any questions, please contact Mr. James M. Petro, Jr., Regulatory Affairs Manager, at (269) 466-2489.
Sincerely, Raymond A. Hruby, Jr.
Vice President - Site Support Services RSP/rdw
Enclosure:
Relief Request ISIR-31 Awql
U. S. Nuclear Regulatory Commission AEP-NRC-2009-52 Page 2 c: T. A. Beltz - NRC Washington, DC J. T. King - MPSC S. M. Krawec, Ft. Wayne AEP MDEQ - WHMD/RPS NRC Resident Inspector M. A. Satorius - NRC Region III
Enclosure to AEP-NRC-2009-52 10 CFR 50.55a Relief Request Number ISIR-31 Proposed Alternative In accordance with 10 CFR 50.55a(a)(3)(ii)
--Hardship or Unusual Difficulty Without a Compensating Increase in Level of Quality or Safety--
- 1. American Society of Mechanical Engineers (ASME) Code Component Affected Code Component Affected: 14"-1-RC-5-IRS
Description:
Unit I Pressurizer Surge Line Nozzle Inner Radius Sections Item Number: B-3.120 Code Class: 1
2. Applicable Code Edition and Addenda
ASME Boiler and Pressure Vessel Code (ASME Code)Section XI, 1989 Edition, with no Addenda.
3. Applicable Code Requirement
Table IWB-2500-1, Examination Category B-D, Inspection Program B, Item No. B3.120 requires volumetric examination of pressurizer nozzle inner radius section.
Code of Federal Regulations, Paragraph 10 CFR 50.55a(b)(2)(xxi) permits enhanced visual examination of the interior surface instead of ultrasonic examination of the exterior surface as stated below.
(xxi) Table IWB-2500-1 examination requirements. "(A) The provisions of Table IWB-2500-1, Examination Category B-D, Full Penetration Welded Nozzles in Vessels, Items B3.40 and B3.60 (Inspection Program A) and Items B3.120 and B3.140 (Inspection Program B) of the 1998 Edition must be applied when using the 1999 Addenda through the latest edition and addenda incorporated by reference in paragraph (b)(2) of this section. A visual examination with magnification that has a resolution sensitivity to detect a 1-mil width wire or crack, utilizing the allowable flaw length criteria in Table IWB-3512-1, 1997 Addenda through the latest edition and addenda incorporated by reference in paragraph (b)(2) of this section, with a limiting assumption on the flaw aspect ratio (i.e., a/I = 0.5), may be performed instead of an ultrasonic examination."
4. Reason for Request
In accordance with 10 CFR 50.55a(a)(3)(ii), an alternative is proposed on the basis that compliance with the code requirement would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. The difficulty associated with access to either the exterior surface for the volumetric examination or to the interior surface for the enhanced visual examination is described below.
Enclosure to AEP-NRC-2009-52 Page 2 The Donald C. Cook Nuclear Plant (CNP) Unit 1 pressurizer surge nozzle is integrally cast within the pressurizer lower head. To perform the volumetric examination of the surge nozzle inner radius section, the outside surface of the lower head must be accessible. This surface is made accessible by removing the insulation surrounding the surge nozzle. The design of this insulation requires disconnecting the 78 heater cables from the immersion heaters prior to removing the insulation. Each cable consists of two wires, each mechanically connected to the heater. Care must be taken while disconnecting and reconnecting to ensure the ceramic terminal blocks connecting the wires to the heater pins are not damaged. If damaged, an unbrazing/brazing evolution would be required to replace the blocks. The dose estimate for this examination assumes that no ceramic terminal blocks would require replacement. Another concern is the presence of asbestos in the cable jackets. Special monitoring and material control would be necessary due to the presence of friable asbestos. Though airborne radioactive contamination is not typically a concern in this area, respirators would be required to address the potential asbestos exposure. Additional coveralls, suitable for asbestos work, would be required over the anti-contamination clothing, causing a heat stress concern.
The dose estimate below is based on a radiological survey obtained on performing a similar evolution during U2C18, Unit 2 spring 2009 refueling outage. The hours estimated to perform the activities involved in disconnecting and reconnecting the cables are based on similar efforts performed during the Unit 2 refueling outage (U2C18) when cables and insulation were removed for a visual examination. Therefore, the estimated times used in the dose estimate are believed to be reasonably accurate.
The dose estimate for cable disconnection/reconnection, insulation removal/
reinstallation, surface preparation, and ultrasonic examination is 2.495 person-Rem.
Indiana and Michigan Power Company (I&M) expect similar levels for Unit I based on plant configuration and shutdown conditions. The dose estimate is based on a radiological survey conducted with the insulation installed and Unit 2 experience. Once the insulation is removed the dose rates documented in the survey would likely increase.
Temporary shielding at this location is not practical since the radiation source is the component surface to be examined.
Enclosure to AEP-NRC-2009-52 Page 3 DOSE ESTIMATE FOR THE PRESSURIZER SURGE NOZZLE INNER RADIUS SECTION VOLUMETRIC EXAMINATION Activity Crew Time Dose rate Estimate Size Hours Effective Dose (hr) Rate (mRem) milliRem/hour ELECTRICIANS:
Disconnect heater cables 2 2.3 31 mR/hr 142 Reconnect heater cables 2 6 31 mR/hr 372 Task Total 514 INSULATORS:
Remove insulation 2 2.9 48.1 mR/hr 279 Reinstall insulation 2 5.7 48.1 mR/hr 546 Remove convection covers 2 3.6 31 mR/hr 226 Reinstall convection covers 2 8.8 31 mR/hr 546 Task Total 1,597 BOILERMAKERS:
Weld preparation 2 2 48.1 mR/hr 192 Task Total 2 2 192 EXAMINERS:
Perform exam 2 2 48.1 mR/hr 192, Task Total 2 2 192 Job Total: 2,495 A remote visual examination from the inside of the pressurizer was evaluated as an alternative to the ultrasonic examination. A screen is located at the surge line nozzle and baffle plates in the lower section of the pressurizer which restricts access to the area of interest. The surge nozzle contains a thermal sleeve that would significantly limit the examination. The heater support structure creates interference for remote equipment and creates a potential entanglement. The distance from the manway to the surge nozzle area is approximately 40 feet, making positioning adjustments of the remote
Enclosure to AEP-NRC-2009-52 Page 4 camera difficult. Because of these limitations, a remote visual examination from the inside of the pressurizer is not considered a viable alternative.
The following describes the basis for concluding that there is no compensating increase in the level of quality and safety. There are no credible failure mechanisms other than fatigue for the surge nozzle. Corrosion degradation protection is provided by the combination of the austenitic stainless steel cladding of the surge nozzle inner radius and by the chemistry controls on the reactor coolant system. Strict chemistry standards are maintained to ensure a non-corrosive environment. Oxygen, chloride, fluoride, and other contaminant concentrations are maintained below the thresholds known to be conducive to stress corrosion cracking. Since the surge nozzle is cast, the typical failure mechanisms associated with weld material do not apply to this examination. Erosion and erosion/corrosion degradation is not credible at this location since the austenitic stainless steel cladding resists this mechanism. There is relatively low fluid velocity in the surge nozzle and reactor coolant chemistry minimizes the amount of particles in the fluid that could potentially cause erosion.
I&M has considered fatigue degradation in this area due to the potential thermal cycling caused by the insurge and outsurges of the reactor coolant flow. Since the surge nozzle is cast with the bottom head, there is no nozzle to vessel weld. The inner radius is believed to be less susceptible to fatigue problems than a nozzle to vessel weld.
Initiation of fatigue cracking may have equal potential at the inner radius as compared to a nozzle to vessel weld, but a pre-existing flaw is less likely in the inner radius casting than at a nozzle to vessel weld due to the manufacturing process. For this hypothetical flaw to be present, it had to have been overlooked by the shop nondestructive examinations, which include surface, ultrasonic, and radiographic examination.
Inservice fatigue crack growth for such a flaw would be small since the pressurizer is hot during the insurges and outsurges resulting in relatively high fracture toughness of the material. A thermal sleeve installed in the surge nozzle provides a measure of protection from the affects of fluid temperature changes. Examinations are performed on the nozzle to safe-end weld, which is within 18 inches of the inner radius.
This area was examined in the first and second ten-year inservice inspection interval and no indications were reported. The other five top-head pressurizer inner radius sections have been successfully examined. No recordable indications were noted on these examinations. CNP Units 1 and 2 have over 50 years of combined operation, with no leakage in the surge nozzle area. The CNP Unit 2 surge nozzle inner radius section was ultrasonically examined in the interval and no recordable indications were found.
The CNP Unit 1 surge nozzle inner radius section was ultrasonically examined in the first and second interval. No evidence for need-of-repair was noted on these examinations.
Enclosure to AEP-NRC-2009-52 Page 5 There are several methods available to detect a leak should a throughwall leak occur.
Listed below are some examples:
- Control room operators perform Operation Surveillance Test "Reactor Coolant System Water Inventory Balance," every 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> with the plant operating at steady state conditions. Leakage would be discovered by this test.
- Containment airborne radiation monitors continuously sample the containment atmosphere and alarm in the control room if a leak were to occur. This detection method is dependent on the size of the leak, reactor coolant activity, and containment background. activity.
- Leakage would cause an increase in containment pressure, temperature and humidity, which are indicated in the control room. Additionally, high containment pressure produces an alarm in the control room.
- Substantial leakage would collect in the containment sump. The sump level is indicated and alarmed in the control room.
The radiation exposure associated with this examination is considered a hardship. If performed, the examination would not significantly increase the level of quality and safety due to the low probability of the presence of a flaw in this area and available leak detection methods as discussed above.
- 5. Proposed Alternative and Basis for Use As an alternative to the applicable code examination requirements cited above, visual, examination (VT-2) of the pressurizer surge nozzle external surface area with the insulation installed will be completed in conjunction with the boric acid walk-.down, performed every shutdown. Also, this area is included and documented in the Mode 3 walk-down of the reactor coolant system boundary, performed during each startup following refueling outages, as required by Table IWB-2500-1, Examination Category B-P, Item No. B15.10. Both of these activities are performed by qualified VT-2 examiners. These examinations are augmented by the leakage detection methods noted above.
- 6. Duration of Proposed Alternative The proposed alternative is applicable to the third and fourth ten-year inservice inspection interval for CNP Unit 1.
- 7. Precedent Letter from Nuclear Regulatory Commission (NRC), to Kewaunee Nuclear Power Plant, "Kewaunee Nuclear Power Plant - Fourth 10-Year Inservice Inspection Interval Program Requests for Relief," dated February 18, 2005, ADAMS Accession Number ML050350225.
Letter from NRC, to Virginia Electric and Power Company, "North Anna Power Station, Unit 2 - ASME Section XI Inservice Inspection (ISI) Program Third 10-Year Interval Requests for Relief," dated June 12, 2002, ADAMS Accession Number ML021630245.