3F0424-01, Report of Investigation Pursuant to 10 CFR 20, Appendix G

From kanterella
(Redirected from 3F0424-01)
Jump to navigation Jump to search
Report of Investigation Pursuant to 10 CFR 20, Appendix G
ML24103A068
Person / Time
Site: Crystal River  Duke Energy icon.png
Issue date: 04/12/2024
From: Reid B
ADP CR3
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation, NRC Region 1, Document Control Desk
References
3F0424-01
Download: ML24103A068 (1)


Text

ADP CR3, LLC CR3 Decommissioning 15760 West Power Line Street l Crystal River, FL 34428

Billy Reid, Site Executive Cellphone: 865-384-6789 Email: breid@northstar.com

3F0424- 01 10 CFR 20, Appendix G April 12, 2024

Mr. Raymond K. Lorson Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Rd, Suite 102 King of Prussia, PA

Subject:

Report of Investigation Pursuant to 10 CFR 20, Appendix G Crystal River 3 Nuclear Power Station Docket Numbers 50- 302 License Number DPR-72

Dear Sir,

This letter documents the results of an investigation performed with respect to the transportation of 1shipment in a rail car, containing UN 2912LSA -I materials which exceeded the 45 day time limit for notification of receipt from the disposal facility as specified in 10 CFR Part 20, Appendix G, as exempted. The investigation, which was completed on April 1, 2024, determined that the railroad logistics contractor, I.C.E Service Group, traced the shipment on a daily basis. The disposal facility, Waste Control Specialists (WCS), and the Crystal River 3 waste operations personnel received daily updates from the various carriers such as Florida Northern Railroad (FNR), CSX Transportation (CSXT), Texas-New Mexico Railroad (TXN) and Union Pacific (UP).

10 CFR 20, Appendix G, Requirements for Transfers of Low -Level Radioactive Waste Intended for Disposal at Licensed Land Disposal Facilities and Manifests,Section III.A(9) states for any shipments or any part of a shipment for which acknowledgment of receipt has not been received within the times set forth in this appendix, conduct an investigation in accordance with Section III.E of this appendix.

Section III.E states that any shipment or part of shipment for which acknowledgement is not received within the times set forth in this section must:

1. Be investigated by the shipper if the shipper has not received notification or receipt within 20 days after transfer (45 days in accordance with the current exception for CR3 per ML21028A590); and
2. Be traced and reported. The investigation shall include tracing the shipment and filing a report with the nearest Commission Regional Office listed in Appendix D to this part.

Each licensee who conducts a trace investigation shall file a written report with the appropriate NRC Regional Office within 2 weeks of completion of the investigation.

Page 1 of 2 Investigation On January 26, 2024, 1 shipment in a rail car containing radioactive materials, UN2912 LSA -I departed from the Crystal River 3 site at 15760 West Power Line Street in Crystal River, Florida to Waste Control Specialists, LLC in Andrews Texas.

Crystal River 3 and Waste Control Specialists, LLC received daily tracking reports from the railroad logistics contractor, I.C.E Service Group, for all waste shipment s transported by rail from the Crystal River 3 Site. The location of the subject shipment was verified and traced until receipt at the destination facility. Crystal River 3 and Waste Control Specialists, LLC tracked the progress of the shipment through the daily trace reports. At no time was the shipment lost or in an unknown location. The shipment was placed at the disposal facility by the rail carrier on February 23, 2024. Disposal facility equipment challenges and staffing availability, attributed to the delay in receipt.

The rail car was released to the first railroad carrier (Florida Northern Railroad) on the date identified above. After release in January from the Crystal River 3 site, rail car ITFX 8117 was in transport for 61 days before the shipment was received at the disposal facility on March 27, 2024.

Below is the summary for the rail shipment that exceeded the time provided in 10 CFR 20, Appendix G (as exempted). The summary includes the shipment identification (manifest) number, rail car identification (ID) number, shipment date, date of receipt at the waste disposal facility and the total number of days the shipment was in transit.

Date Manifest Number Rail Car ID Date Received at Total Days Number Shipped Waste Control In Transit Specialists, LLC.

NS-CR3-24-002 ITFX 8117 1/26/2024 3/27/2024 61

This letter contains no new regulatory requirements.

Should you have any questions concerning this letter, please contact Mr. John T. Jernigan at (352) 224-1200, Ext 2998.

Sincerely,

Billy Reid Nuclear Executive

Cc: NMSS Project Manager Regional Administrator, Region 1 Regional Administrator, Region 2

Page 2 of 2