3F0404-10, Withdrawal of Revised Appendix R Exemption Request - Fire Area CC-164-121

From kanterella
Jump to navigation Jump to search

Withdrawal of Revised Appendix R Exemption Request - Fire Area CC-164-121
ML041250441
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/26/2004
From: Annacone M
Progress Energy Florida
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
10 CFR 50.12, 3F0404-10, TAC MB7987
Download: ML041250441 (2)


Text

Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: 10 CFR 50.12 April 26, 2004 3F0404-10 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - Withdrawal of Revised Appendix R Exemption Request -

Fire Area CC-164-121 (TAC No. MB7987)

References:

1. FPC to NRC letter, 3F0203-06, dated February 4, 2003, Crystal River Unit 3 -

Revised Appendix R Exemption Request - Fire Area CC-164-121 (Accession No. ML030420412)

2. NRC to FPC letter, 3N1 103-03, dated November 5, 2003, Request for Additional Information Related to Crystal River Unit 3 - Revised Appendix R Exemption Request - Fire Area CC-164-121 Submittal (TAC No. MB7987)

(Accession No. ML033090003)

3. FPC to NRC letter, 3F1 103-07, dated November 26, 2003, Crystal River Unit 3

- Response to Request for Additional Information Related to Crystal River Unit 3 - Revised Appendix R Exemption Request - Fire Area CC-164-121 (TAC No. MB7987) (Accession No. ML033430359)

4. FPC to NRC letter, 3F1203-15, dated December 18, 2003, Crystal River Unit 3

- Final Response to Request for Additional Information Related to Crystal River Unit 3 - Revised Appendix R Exemption Request - Fire Area CC-164-121 (TAC No. MB7987) (Accession No. ML033640567)

Dear Sir:

The purpose of this letter is to withdraw the Revised Appendix R Exemption Request submitted by Florida Power Corporation (FPC), doing business as Progress Energy Florida, Inc., in Reference 1 and supplemented in References 3 and 4.

Subsequent to detailed discussions with the NRC staff, FPC has decided not to pursue the revised exemption request at this time.

This letter establishes no regulatory commitments.

15760 West Power Une Street

  • Crystal River, Florida 34428-6708 * (352) 5634589

U.S. Nuclear Regulatory Commission Page 2 of 2 3F0404-10 If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.

Sincerely, Michael J. Annacone Manager Engineering MJA/nnb xc: Regional Administrator, Region II Senior Resident Inspector NRR Project Manager