| Q | CCA | Title |
---|
05000528/FIN-2012004-05 | 2012Q3 | H.2 | Failure to Perform 50.54(q) Evaluation |
05000528/FIN-2012004-01 | 2012Q3 | P.1 | Failure to Correct Scupper Obstruction |
05000528/FIN-2012004-02 | 2012Q3 | P.2 | Untimely Corrective Action for Condition Adverse to Fire Protection |
05000528/FIN-2012004-03 | 2012Q3 | H.14 | Inadequate Boric Acid Evaluation |
05000528/FIN-2012004-04 | 2012Q3 | | Inadequate Operability Determination for ARD Relay Failures |
05000528/FIN-2012004-06 | 2012Q3 | H.9 | Failure to Declare an Unusual Event |
05000528/FIN-2012005-06 | 2012Q4 | H.7 | Technical Support Center Diesel Generator Not Restored Following Maintenance |
05000528/FIN-2012005-05 | 2012Q4 | H.2 | Failure to Classify and Evaluate a Condition Adverse to Quality |
05000528/FIN-2012005-04 | 2012Q4 | H.10 | Inadequate Tracking of Functional Assessment for Spent Fuel Pool Heat Load |
05000528/FIN-2012005-03 | 2012Q4 | H.5 | Failure to Maintain Licensed Operator Examination Integrity |
05000528/FIN-2012005-02 | 2012Q4 | | Failure to Perform Pressure Testing of the Reactor Vessel Flange Leak-Off Lines |
05000528/FIN-2012005-01 | 2012Q4 | P.6 | Failure to Identify and Correct a Condition Adverse to Fire Protection |
05000528/FIN-2013404-01 | 2013Q1 | | Security |
05000528/FIN-2013002-05 | 2013Q1 | | Shutdown Cooling Piping Failure |
05000528/FIN-2013002-04 | 2013Q1 | H.7 | Failure to Comply with Technical Specifications |
05000528/FIN-2013002-03 | 2013Q1 | | Failure to Maintain the Updated Final Safety Analysis Report for Radwaste Systems and Processes |
05000528/FIN-2013002-02 | 2013Q1 | P.1 | Failure to identify weak performance during an exercise |
05000528/FIN-2013002-01 | 2013Q1 | H.13 | Multiple Failures to Identify Conditions Adverse to Quality |