05000528/FIN-2012004-05
From kanterella
Jump to navigation
Jump to search
Finding | |
|---|---|
| Title | Failure to Perform 50.54(q) Evaluation |
| Description | Inspectors identified a Severity Level IV, non-cited violation of 10 CFR 50.54 (q), Conditions of licenses, and an associated Green finding for the licensees failure to perform an appropriate design scope change, which resulted in the reduction in effectiveness of the emergency plan. Specifically, on May 19, 2011, the licensee completed a modification to revise protective area lightning power sources and removed ground fault protections on a circuit breaker attached to the bus, which powers the technical support center. This change created a condition that would remove power to the technical support center and prevent emergency plan required back up power from being able to power the bus. On August 10, 2012, a lighting fault caused a complete loss of power to the technical support center, demonstrating that this change decreased the effectiveness of the emergency plan. On September 26, 2012, the licensee reactivated the ground fault protection for the circuit breaker and established compensatory measures to restore power to ensure technical support center staffing will not be challenged. The licensee entered this into their corrective action program as condition report disposition request 4230209. The failure to perform an appropriate design scope change was a performance deficiency. The performance deficiency was more than minor, and therefore a finding, because it affected the facilities and equipment attribute of the Emergency Preparedness Cornerstone and its objective to ensure that the licensee is capable of implementing adequate measures to protect the health and safety of the public in the event of a radiological emergency. The inspectors evaluated the significance of the issue under the Significance Determination Process, as defined in Inspection Manual Chapter 0609.04, Initial Characterization of Findings, and Manual Chapter 0609, Appendix B, Emergency Preparedness Significance Determination Process. The finding was determined to be of very low safety significance (Green). Additionally, the violation of 10 CFR 50.54 (q) impacted the ability of the NRC to perform its regulatory oversight function and was dispositioned using traditional enforcement. This violation was determined to be a Severity Level IV violation per Section 6.6 of the NRC Enforcement Policy because the violation was not associated with licensees ability to meet or implement any regulatory requirement related to assessment or notification. Although the regulatory requirement could be implemented during the response to an actual emergency, the implementation would be degraded. The inspectors determined this finding has a crosscutting aspect in the area of human performance associated with the work practices component because the licensee failed to ensure supervisory management and oversight of contractors such that nuclear safety is supported. |
| Site: | Palo Verde |
|---|---|
| Report | IR 05000528/2012004 Section 4OA2 |
| Date counted | Sep 30, 2012 (2012Q3) |
| Type: | NCV: Green |
| cornerstone | Emergency Prep |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71152 |
| Inspectors (proximate) | M Baquera D Reinert D You R Lantz M Brown J Melfi J Laughlin B Parks |
| CCA | H.2, Field Presence |
| INPO aspect | LA.2 |
| ' | |
Finding - Palo Verde - IR 05000528/2012004 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Palo Verde) @ 2012Q3
Self-Identified List (Palo Verde)
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||