05000528/FIN-2006010-01
From kanterella
Jump to navigation
Jump to search
Finding | |
|---|---|
| Title | Summary Finding. 95002 Team'S Assessment of IR 2004-14 (Yellow) 10 CFR Part 50, Appendix B, Criterion Iii, Violation |
| Description | The NRC performed a followup supplemental inspection to assess the licensees corrective actions associated with a Yellow design control finding involving the potential for air entrainment into the emergency core cooling system. The team concluded that the technical issues specifically associated with the voided emergency core cooling system piping have been addressed. However, the Yellow finding will remain open because the licensee did not implement effective corrective actions for all of the causes associated with the Yellow finding. Specifically, the licensees actions to improve questioning attitude, technical rigor, and technical review were not fully effective. Also, the implementation of performance measures and metrics to monitor the effectiveness of corrective actions associated with the Yellow finding were not adequate to assess effectiveness. This performance issue was previously characterized as a 10 CFR Part 50, Appendix B, Criterion III, violation having substantial safety significance (Yellow), and was originally identified in NRC Inspection Report 05000528; 05000529; 05000530/2004014. The licensees corrective actions taken in response to the root causes and related programmatic concerns involving questioning attitude, technical rigor, and technical review have not been completely effective. Specifically, following implementation of corrective actions between September 2005 and March 2006, the licensee: (1) continued to conduct inadequate technical reviews of emerging issues; (2) did not routinely question the validity of engineering assumptions used to support operability decisions; (3) did not consistently implement a qualify, validate, and verify process; and (4) did not consistently notify operations personnel of immediate operability concerns. The team concluded that adequate qualitative or quantitative measures for determining the effectiveness of the corrective actions to prevent recurrence have not been established. For example, not all relevant performance data was considered when performance monitoring measures were developed to assess the effectiveness of corrective actions. When the pertinent data was considered, or otherwise clarified, the performance measures suggested declining rather than improving performance in some areas. The team also concluded that the licensee had not completed adequate reviews of the effectiveness of corrective actions prior to their notifying the NRC of their readiness for inspection of the Yellow finding. Specifically, several assessments were completed after the requested dated of the inspection (June 2006). Several of the assessments noted that insufficient progress in resolving some of the root and contributing causes had been made. Additionally, a standard guideline for metrics was not issued and implemented until July 2006. |
| Site: | Palo Verde |
|---|---|
| Report | IR 05000528/2006010 Section 4OA4 |
| Date counted | Sep 30, 2006 (2006Q3) |
| Type: | Finding: |
| cornerstone | Mitigating Systems |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 95002 |
| Inspectors (proximate) | M Sitek G Warnick M Hay |
| INPO aspect | |
| ' | |
Finding - Palo Verde - IR 05000528/2006010 | |||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Palo Verde) @ 2006Q3
| |||||||||||||||||||||||||||||||||