Finding | |
|---|---|
| Title | Inadequate Analysis and Procedures for Offsite Power Availability |
| Description | The team identified a Green noncited violation of 10 CFR Part 50, Appendix B, Criterion III, Design Control, which states, in part, measures shall be established to assure that applicable regulatory requirements and the design basis are correctly translated into specifications, drawings, procedures, and instructions. Specifically, as of August 20, 2010, the team identified two examples of the violation where 1) the licensee did not verify the adequacy of the design for avoiding spurious separation of the offsite power supply in that Calculation EC-5000 did not analyze all alternate alignments of the electrical distribution system allowed by technical specifications; and 2) the licensee failed to properly translate the design into procedures, in that Procedure 0POP02-AE-0002 did not provide adequate controls for maintaining the availability of offsite power required by the design. This finding was entered into the licensees corrective action program as Condition Reports 10-17146, 10-17219, and 10-17618. The team determined that the failure to analyze all alternate alignments of the electrical distribution system allowed by technical specifications and provide adequate controls for maintaining the availability of offsite power required by the design, was a performance deficiency. The finding is more than minor because it is associated with the design control attribute of the Mitigating Systems Cornerstone and affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Using Inspection Manual Chapter 0609.04, Phase 1 - Initial Screening and Characterization of Findings, the team determined that the finding was of very low safety significance (Green) because it was a design or qualification deficiency confirmed not to result in loss of operability or functionality. Specifically, the licensee performed subsequent analyses, which demonstrated that the offsite electrical distribution system would function as required to mitigate an accident. This finding had a crosscutting aspect in the area of human performance, resources, because the licensee failed to provide complete, accurate and up-to-date design documentation, including calculations and procedures, to assure nuclear safety. |
| Site: | South Texas |
|---|---|
| Report | IR 05000498/2010007 Section 1R21 |
| Date counted | Mar 31, 2011 (2011Q1) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71111.21 |
| Inspectors (proximate) | R Kopriva T Farnholtz J Adams C Baron G Skinner M Runyan A Fairbanks S Makor C Steely |
| CCA | H.7, Documentation |
| INPO aspect | WP.3 |
| ' | |