05000483/FIN-2014003-03
Finding | |
---|---|
Title | Licensee-Identified Violation |
Description | Title 10 of the Code of Federal Regulations, Part 50.54(q)(2), requires in part, that a reactor licensee follow an emergency plan meeting the requirements of 10 CFR Part 50
Appendix E, and the 10 CFR 50.47(b) planning standards. Contrary to the above, o July 26, 2013, Callaway Plant failed to follow an emergency plan meeting the requirements of the 10 CFR 50.47(b) planning standards. Specifically, the license failed to implement an emergency action level scheme meeting the requirements o 10 CFR 50.47(b)(4) during a plant event. The licensee classified a Notification o Unusual Event on July 26, 2013, based on emergency action level HU2.1, Non-hostil initiated fire not extinguished within 15 minutes of Control Room notification or vali Control Room alarm. The licensee subsequently determined that the emergency actio level did not apply because the fire was not in a location listed on Table H-2 as require by the technical basis document. The finding was more than minor because it affecte the Emergency Preparedness Cornerstone objective and the emergency respons organization performance cornerstone attribute. The finding was evaluated usin Manual Chapter 0609, Appendix B, Emergency Preparedness Significance Determination Process, Attachment 2, Failure to Implement, and was determined to b of very low safety significance (Green) because the classification was a Notification o Unusual Event. The issue was entered into the licensees corrective action program a Callaway Action Requests 201305943 and 201305944. |
Site: | Callaway |
---|---|
Report | IR 05000483/2014003 Section 4OA7 |
Date counted | Jun 30, 2014 (2014Q2) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | Licensee-identified |
Inspection Procedure: | |
Inspectors (proximate) | T Hartman Z Hollcraft A Allen D Proulx G George J Braisted N O'Keefe P Elkmann P Jayroe R Strobled Proulxg George J Braisted N O'Keefe P Elkmann P Jayroe T Hartman Z Hollcraft |
Violation of: | 10 CFR 50.54 10 CFR 50.47 10 CFR 50.54(q) 10 CFR 50.47(b)(4) |