05000482/LER-2010-014

From kanterella
Jump to navigation Jump to search
LER-2010-004, Technical Specification Required Shutdown Due to Inadequate Planning Resulting in Extended Emergency Diesel Generator Inoperability
Docket Number
Event date: 12-06-2010
Report date: 02-04-2011
Reporting criterion: 10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown
4822010004R00 - NRC Website

This event is of low safety significance. The Train 'B' EDG, the off-site diesel gensets used for peak loading located at the Sharpe Station, and offsite power were available during the inoperability of the Train 'A' EDG.

OPERATING EXPERIENCE/PREVIOUS EVENTS

due to water leakage from a buried portion of the Train 'A' Essential Service Water (ESW) system [EllS Code: BI]. Subsequent Engineering evaluation of the through-wall leak concluded that the ESW system was capable of performing its design safety function.