Title | Licensee-Identified Violation |
Description | Technical Specification 3.4.15, [Reactor Coolant System] Leakage Detection Instrumentation, states, in part, that reactor coolant system leakage detection instrumentation shall be operable, including the containment sump level and flow monitoring system. Required Action A of Technical Specification 3.4.15, states, in part, that with the required containment sump level and flow monitoring system inoperable, restore the required containment sump level and flow monitoring system to operable status within 30 daysif the required action and associated completion time are not met, Condition E requires the reactor to be in mode 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in mode 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. Contrary to the above, from the period of July 13, 2013, to November 20, 2013, with the containment sump level and flow monitoring system inoperable for greater than 30 days, the reactor was not placed in mode 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> or mode 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. Specifically, the instrument tunnel sump level indication was inoperable because of erratic indication, but the licensee did not take the required action of Technical Specification 3.4.15. The licensee placed this issue in the corrective action program as Condition Report 84690. Using Manual Chapter 0609, Appendix A, Significance Determination Process, for Findings at Power, dated June 19, 2012, this issue screened to Green because it did not result in reactor coolant system leakage or degrade the licensees ability to detect and mitigate a small break loss of coolant accident. |
Site: | Wolf Creek |
---|---|
Report | IR 05000482/2016002 Section 4OA7 |
Date counted | Jun 30, 2016 (2016Q2) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | Licensee-identified |
Inspection Procedure: | |
Inspectors (proximate) | C Stott D Dodson D Proulx F Thomas J Drake L Carson M Phalen N Greene N Taylor P Hernandez W Sifre |
Violation of: | Technical Specification |