| Q | CCA | Title |
---|
05000482/FIN-2015001-01 | 2015Q1 | | Question Related to Ultrasonic Examination of Reactor Vessel Flange Stud Hole Threads |
05000482/FIN-2015001-02 | 2015Q1 | H.5 | Failure to Assess the Operability of Emergency Diesel Generator B during Emergent Work Activities |
05000482/FIN-2015001-03 | 2015Q1 | H.14 | Failure to Complete an Adequate Operability Evaluation for Declaring the Train A Control Room Air Conditioning Unit Operable |
05000482/FIN-2015001-04 | 2015Q1 | H.5 | Failure to Station Boundary Watch for Opening Auxiliary Building Emergency Exhaust System Boundary Door |
05000482/FIN-2015009-01 | 2015Q2 | H.12 | Failure to Provide Adequate Instructions for Control of Feedwater Flow in Startup Procedures |
05000482/FIN-2015009-02 | 2015Q2 | | Failure of the Plant Referenced Simulator to Demonstrate Expected Plant Response |
05000482/FIN-2015002-01 | 2015Q2 | H.4 | Class 1E 4kV Feeder Breakers from Station Blackout Diesel Generators Current Transformer Wiring not Installed per Design Drawings |
05000482/FIN-2015003-01 | 2015Q3 | H.11 | Inadequate Implementation of the Breach Authorization Procedure |
05000482/FIN-2015004-01 | 2015Q4 | H.1 | Inadequate Measures to Assure SGK05A Issues Were Promptly Corrected |
05000482/FIN-2015004-02 | 2015Q4 | H.11 | Failure to Ensure Essential Service Water Valves Were Adequately Protected from External Flooding Hazards |
05000482/FIN-2015004-03 | 2015Q4 | H.14 | Failure to Perform an Adequate Operability Determination and Consider Design Basis Events |
05000482/FIN-2015405-01 | 2015Q4 | | Security |
05000482/FIN-2015405-02 | 2015Q4 | | Security |
05000482/FIN-2015405-03 | 2015Q4 | | Security |
05000482/FIN-2015405-04 | 2015Q4 | | Security |