| Q | CCA | Title |
---|
05000482/FIN-2013405-01 | 2013Q1 | H.14 | Security |
05000482/FIN-2013002-01 | 2013Q1 | | Failure to Initiate a Condition Report and Determine Extent of Condition for Emergency Diesel Generator Head Stud Failure |
05000482/FIN-2013002-02 | 2013Q1 | H.12 | Failure to Promptly Identify and Correct Reactor Coolant System Pressure Boundary Leakage |
05000482/FIN-2013009-01 | 2013Q2 | H.13 | Failure to Identify the Cause and Take Corrective Action to Preclude Repetition of a Diesel Generator Functional Failure |
05000482/FIN-2013003-07 | 2013Q2 | | Notice of Enforcement Discretion (NOED) 13-4-002 for a Non-Functional Class 1E Air Conditioning Unit |
05000482/FIN-2013003-06 | 2013Q2 | | Failure to Maintain Complete and Accurate Housekeeping Records |
05000482/FIN-2013003-05 | 2013Q2 | H.12 | Failure to Properly Manage Reactivity Changes when Swapping Turbine Steam Admission Modes from Full to Partial Arc |
05000482/FIN-2013003-04 | 2013Q2 | H.5 | Failure to Update Station Procedures and Train Operators Regarding the Effects of Implemented Design Changes to the Main Turbine Control System |
05000482/FIN-2013003-03 | 2013Q2 | P.2 | Diesel Generator Pressure Switch Failed Due to Instrument Line Pressure Oscillations |
05000482/FIN-2013003-02 | 2013Q2 | H.8 | Failure to Identify Leakage at Refuel Pool Cavity |
05000482/FIN-2013003-01 | 2013Q2 | H.2 | Failure to Follow Station Procedures |
05000482/FIN-2013008-02 | 2013Q3 | H.6 | Failure to Verify or Check the Adequacy of Design Calculations |
05000482/FIN-2013008-13 | 2013Q3 | H.7 | Failure to Fully Establish Design Control Measures for Vital Essential Chillers SGK05 A/B Air Conditioning Units |
05000482/FIN-2013008-12 | 2013Q3 | | Failure to Translate Design Basis Performance Requirements into Pump Surveillance Tests |
05000482/FIN-2013008-11 | 2013Q3 | H.6 | Failure to Verify Adequacy of Electrical Protective Devices to Isolate Fire-Damaged Associated Circuits |
05000482/FIN-2013008-10 | 2013Q3 | | Failure to Provide Procedure Instructions to Remove Thermal Overload Bypass Jumpers |
05000482/FIN-2013008-09 | 2013Q3 | H.8 | Failure to Properly Assess Problems with Component Cooling Water Valve EGHV102 |
05000482/FIN-2013008-08 | 2013Q3 | | Failure to Account for Containment Temperature Measurement Uncertainty |
05000482/FIN-2013008-07 | 2013Q3 | | Failure to Account for Flow Measurement Uncertainty when Operating the Residual Heat Removal Pumps in the Low Flow Regime |
05000482/FIN-2013008-06 | 2013Q3 | | Failure to Fully Implement Electrical Protection Criteria for Containment Penetrations |
05000482/FIN-2013008-05 | 2013Q3 | H.6 | Failure to Ensure Motors are Operated Within their Thermal Limits |
05000482/FIN-2013008-04 | 2013Q3 | | Failure to Prevent Over voltages on the 480 Vac System During Emergency Diesel Generator Testing |
05000482/FIN-2013008-03 | 2013Q3 | | Failure to Ensure that Degraded Voltage Relay Minimum Allowable Time Delay Value is Bounded by Analyzed Value |
05000482/FIN-2013008-01 | 2013Q3 | | Failure to Follow Procedure When Making Changes to Off-Normal Operating Procedure OFN NB-042 |
05000482/FIN-2013004-01 | 2013Q3 | H.5 | Failure to Analyze Erected Scaffolding for Fire Impairment and Transient Combustible Loading |
05000482/FIN-2013403-01 | 2013Q4 | | Security |
05000482/FIN-2013005-04 | 2013Q4 | H.7 | Failure to Preclude Repetition of a Significant Condition Adverse to Quality Affecting Class 1E Air Conditioning Unit |
05000482/FIN-2013005-02 | 2013Q4 | | Failure to Assess Risk Prior to Performing Online Maintenance to an Offsite Power Circuit Component |
05000482/FIN-2013005-01 | 2013Q4 | H.2(b) | Failure Rates Exceed Twenty Percent for Annual Requalification Operating Tests |
05000482/FIN-2013005-03 | 2013Q4 | | Apparent inaccuracy in licensee dose assessment software |