| Q | CCA | Title |
---|
05000458/FIN-2016404-01 | 2016Q4 | H.1 | Security |
05000458/FIN-2016404-03 | 2016Q4 | H.4 | Security |
05000458/FIN-2016404-05 | 2016Q4 | H.8 | Security |
05000458/FIN-2016404-02 | 2016Q4 | P.1 | Security |
05000458/FIN-2016404-04 | 2016Q4 | P.6 | Security |
05000458/FIN-2017001-01 | 2017Q1 | H.12 | Failure to Follow Station Guidance on Control of Scaffolding |
05000458/FIN-2017001-02 | 2017Q1 | H.11 | Failure to Properly Pre - Plan and Perform Maintenance on the Control Building Chilled Water System |
05000458/FIN-2017001-03 | 2017Q1 | | Failure to Enter Applicable Technical Specification Action Statements When Control Building Chillers Were O ut of Service |
05000458/FIN-2017009-01 | 2017Q2 | H.8 | Failure to Obtain Prior NRC Approval for a Change in Reactor Core Isolation Cooling Injection Point |
05000458/FIN-2017002-01 | 2017Q2 | H.11 | Failure to Maintain Operability of the Division I Control Room Fresh Air System While Changing Reactor Modes |
05000458/FIN-2017002-02 | 2017Q2 | | Single Component Failure Leads to Loss of Both Divisions of Control Building Air Conditioning |
05000458/FIN-2017007-01 | 2017Q2 | H.1 | Failure to Evaluate the Extent of Condition for a Degraded 4.16KV Magne Blast Safety-Related Circuit Breaker |
05000458/FIN-2017007-02 | 2017Q2 | P.3 | Failure to Perform an Adequate Operability Determination for a Condition Identified During an NRC Walkdow |
05000458/FIN-2017405-01 | 2017Q2 | P.2 | Security |
05000458/FIN-2017003-01 | 2017Q3 | H.6 | Failure to Account for Delayed Closure of Isolation Valves in the Ultimate Heat Sink Inventory Analysis |
05000458/FIN-2017003-02 | 2017Q3 | H.5 | Manual Reactor Scram Initiated in Response to Increase in Steam Pressure during Steam Leak Troubleshooting |