05000457/FIN-2015004-02 | 2015Q4 | | Failure of Startup Feedwater Pump to Start During Plant Shutdown |
05000457/FIN-2015004-01 | 2015Q4 | | Loss of Shutdown Cooling Train During Refueling Cavity Fill and Associated Reduced Inventory Operations |
05000456/FIN-2015004-03 | 2015Q4 | | Failure to Establish Adequate Feedwater Pump Operational Guidance During a Normal Plant Shutdown |
05000456/FIN-2015004-04 | 2015Q4 | | Failure to Establish a Written Procedure for a Loss of Feedwater Event in Mode 3 |
05000456/FIN-2016008-01 | 2016Q1 | | Failure to Verify the Tripping Characteristic of Molded Case Circuit Breakers (MCCBs) Used as Isolation Devices for the 120 Vac Instrument Power System |
05000456/FIN-2016008-02 | 2016Q1 | | Failure to Verify Air Intake for Diesel Driven Auxiliary Feedwater Pump was Adequately Protected from a High Energy Line Break |
05000456/FIN-2016001-01 | 2016Q1 | H.5 | Failure to Follow Fire Prevention for Hot Work Procedure |
05000457/FIN-2016001-02 | 2016Q1 | H.5 | Failure to Have Adequate Work Instructions and Procedures Leads to a Loss of Inventory From the Volume Control Tank |
05000456/FIN-2016001-03 | 2016Q1 | | Failure to Correct a Condition Adverse to Quality Leads to Loss of One Train of Shutdown Cooling in Mode 6 |
05000456/FIN-2016001-05 | 2016Q1 | | Failure to Ensure Unit 2 Startup Feedwater Pump Availability |
05000456/FIN-2016001-04 | 2016Q1 | | Questions Regarding the Implementation of the Gas Accumulation Program |
05000456/FIN-2016002-01 | 2016Q2 | H.12 | Multiple Failure to Follow Procedures Leads to Inadequate Monitoring of Gas Susceptible Locations |
05000456/FIN-2016002-04 | 2016Q2 | | Licensee Implementation of Enforcement Guidance Memorandum 15002, Enforcement Discretion for Tornado-Generated Missile Protection Noncompliance |
05000456/FIN-2016002-03 | 2016Q2 | | Missed Radiological Environmental Monitoring Program Sampling |
05000457/FIN-2016002-02 | 2016Q2 | H.11 | Failure to Manage Gas Accumulation in the 2A SI Train |
05000456/FIN-2016007-01 | 2016Q3 | | Identification of SCAQs in Accordance with the QATR |
05000456/FIN-2016007-02 | 2016Q3 | | Operation of SX System Valves Results in Cavitation Damage and Pipe Leakage |
05000456/FIN-2016201-01 | 2016Q3 | | Security |
05000456/FIN-2016003-02 | 2016Q3 | H.9 | Failure to Follow Inservice Testing Requirements for the 2A Essential Service Water Pump Leads to an Invalid Test |
05000456/FIN-2016003-01 | 2016Q3 | H.4 | Failure to Erect Scaffolding in Accordance with Station Procedures |