05000456/FIN-2013007-04
From kanterella
Jump to navigation
Jump to search
Finding | |
|---|---|
| Title | Failure to Consider Adequate Tornado Missile Protection in SX Discharge Pipe |
| Description | The inspectors identified a finding of very low safety significance and associated NCV of 10 CFR Part 50, Appendix B, Criterion III, Design Control, for the licensees failure to consider design control measures commensurate with those applied to the original essential service water (SX) design related to tornado missile protection. Specifically, the licensee processed a physical modification to the SX discharge pipe and failed to protect or evaluate the exposed portion from potential tornado missiles. The licensee entered this issue into their Corrective Action Program and showed by calculation that the modified SX pipe would shear off upon impact from the design basis tornado missile and the safety-related portion would be unharmed and capable of performing its intended function. The inspectors determined that the performance deficiency was more than minor because it was associated with the Mitigating Systems cornerstone attribute of design control and affected the cornerstone objective of ensuring the capability of the SX system to respond to an initiating event to prevent undesirable consequences. Specifically, by failing to consider tornado missile protection in the SX design, there was reasonable doubt as to whether the SX pumps would have been operable during accident conditions. Since the finding would degrade two or more trains of a multi-train system or function, the inspectors determined a Detailed Risk-Evaluation was required. Based on the Detailed Risk-Evaluation, the Senior Reactor Analysts determined the delta core damage frequency for the finding was 6.66E-7/yr and was of very low safety significance (Green). The inspectors did not identify a cross-cutting aspect associated with this finding because the finding was not representative of current performance. |
| Site: | Braidwood |
|---|---|
| Report | IR 05000456/2013007 Section 1R21 |
| Date counted | Sep 30, 2013 (2013Q3) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71111.21 |
| Inspectors (proximate) | B Jose C Tilton D Szwarc J Chiloyan M Munir N Valos W Sherbin |
| Violation of: | 10 CFR 50 Appendix B Criterion III, Design Control |
| INPO aspect | |
| ' | |
Finding - Braidwood - IR 05000456/2013007 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Braidwood) @ 2013Q3
Self-Identified List (Braidwood)
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||