05000416/LER-2017-006

From kanterella
Jump to navigation Jump to search
LER-2017-006, Completion of Grand Gulf Nuclear Station Shutdown Required By Technical Specifications Because Of An Inoperable A Residual Heat Removal Pump
Grand Gulf Nuclear Station, Unit 1
Event date: 8-29-2017
Report date: 10-12-2017
Reporting criterion: 10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown
Initial Reporting
ENS 52936 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown
4162017006R00 - NRC Website