05000416/FIN-2014009-01
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Failure To Correct Degraded Viewing Ports In A Timely Manner |
Description | The inspectors identified a Green finding resulting from the licensees failure to follow Procedure EN-LI-102, Corrective Action Process, Revision 23, and Procedure EN-OP-104, Operability Determination Process, Revision 7, for an adverse condition. The licensee failed to repair degraded viewing ports on the isophase bus ducting in a timely manner. The licensee documented this issue in their corrective action program as Condition Report CR-GGN-2013-00319. The failure to implement adequate corrective actions in a timely manner after the discovery and evaluation that the viewing windows on the isophase bus duct had the potential to cause a reactor scram is a performance deficiency. The performance deficiency was more than minor because it was associated with the Initiating Events cornerstone attribute of Human Performance and adversely affected the cornerstone objective of limiting the likelihood of events that upset plant stability and challenge critical safety functions during power operations. Using Inspection Manual Chapter 0609, Appendix A, Significance Determination Process (SDP) for Findings at Power, dated June 19, 2012, Exhibit 1, Section B, Transient Initiators, the inspectors determined that the issue has a very low safety significance (Green) because it only caused a reactor trip and did not cause a loss of mitigating equipment relied on to transition the plant from the onset of a trip to a stable shutdown condition. This finding has a cross-cutting aspect in the problem identification and resolution area, associated with operating experience, because the licensee failed to systematically and effectively collect, evaluate, and implement relevant internal and external operating experience in a timely manner [P.5]. |
Site: | Grand Gulf ![]() |
---|---|
Report | IR 05000416/2014009 Section 4OA3 |
Date counted | Jun 30, 2014 (2014Q2) |
Type: | Finding: Green |
cornerstone | Initiating Events |
Identified by: | NRC identified |
Inspection Procedure: | IP 71153 |
Inspectors (proximate) | D Allen J Drake L Brandt N Greene |
CCA | P.5, Operating Experience |
INPO aspect | CL.1 |
' | |