05000397/FIN-2018401-02

From kanterella
Jump to navigation Jump to search
02
Site: Columbia Energy Northwest icon.png
Report IR 05000397/2018401 Section 3S01
Date counted Mar 31, 2018 (2018Q1)
Type: TEV: Severity level IV
cornerstone Physical Protection
Identified by: NRC identified
Inspection Procedure: IP 71130.01
Violation of: 10 CFR 73, PHYSICAL PROTECTION OF PLANTS AND MATERIALS
INPO aspect
'