05000390/FIN-2015002-04
From kanterella
Jump to navigation
Jump to search
Finding | |
|---|---|
| Title | Failure to Follow Procedure during SSPS Testing |
| Description | A self-revealing, Non-Cited Violation (NCV) of 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings was identified for the licensees failure to follow procedure 1-SI-99-10-A, 62 Day Functional Test of Solid State Protection System (SSPS) Train A and Reactor Trip Breaker A, Revision 59 as amended, for troubleshooting by Procedure Control Form 070-4. Specifically, the licensee attempted to take voltage measurements which were not directed by the revised procedure. The licensee stopped testing, conducted a prompt investigation and removed the first line supervisor and foreman from their duties pending remediation. The licensee placed the issue into their corrective action program as CR 1015778 The performance was more than minor because it adversely affected the equipment performance attribute of the mitigating systems cornerstone to ensure the availability of systems that respond to initiating events to prevent undesirable consequences (i.e., core damage). Specifically, the failure to follow the troubleshooting procedure resulted in drawing an arc in the SSPS cabinet and tripping an upstream supply breaker which resulted in the inoperability of the 1A-A containment spray pump. The inspectors determined that this finding was of very low safety significance (Green) because the finding did not represent an actual loss of function of a single train of containment spray for greater than its Tech Spec allowed outage time. The performance deficiency had a cross-cutting aspect of Procedure Adherence in the area of Human Performance because crew members failed to follow the work instructions in the troubleshooting procedure (H8). |
| Site: | Watts Bar |
|---|---|
| Report | IR 05000390/2015002 Section 1R22 |
| Date counted | Jun 30, 2015 (2015Q2) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | Self-revealing |
| Inspection Procedure: | IP 71111.22 |
| Inspectors (proximate) | A Blarney C Cheung J Eargle J Hamman J Nadel J Rivera-Ortiz P Cooper R Egli R Hickok T Palmer W Russell |
| Violation of: | 10 CFR 50 Appendix B Criterion V Technical Specification Technical Specification - Procedures |
| CCA | H.8, Procedure Adherence |
| INPO aspect | WP.4 |
| ' | |
Finding - Watts Bar - IR 05000390/2015002 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Watts Bar) @ 2015Q2
Self-Identified List (Watts Bar)
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||