| | Q | CCA | Title |
|---|
| 05000390/FIN-2014002-01 | 2014Q1 | H.8 | Failure to Follow Plant Procedures for Replacement of NAMCO Limit Switches |
| 05000390/FIN-2014002-02 | 2014Q1 | P.2 | Failure to Correct a Condition Adverse to Quality |
| 05000390/FIN-2014002-03 | 2014Q1 | | Failure to Comply with Technical Specification 3.7.5, Auxiliary Feedwater System |
| 05000390/FIN-2014003-03 | 2014Q2 | H.5 | Failure to Comply with Design Drawing Results in a Reactor Trip |
| 05000390/FIN-2014003-01 | 2014Q2 | P.1 | Failure to Identify a Condition Adverse to Quality |
| 05000390/FIN-2014003-02 | 2014Q2 | P.2 | Failure to Identify a Condition Adverse to Quality |
| 05000390/FIN-2014004-01 | 2014Q3 | H.14 | Failure to follow scaffold procedure impacts Appendix R operator manual actions |
| 05000390/FIN-2014405-01 | 2014Q3 | | Security |
| 05000390/FIN-2014405-02 | 2014Q3 | | Security |
| 05000390/FIN-2014405-03 | 2014Q3 | | Security |
| 05000390/FIN-2014004-02 | 2014Q3 | H.5 | Failure to Perform an Adequate Post Maintenance Test Results in Draining of the Unit 1 RWST to a Level Below Technical Specification Limit |
| 05000390/FIN-2014405-04 | 2014Q3 | | Security |
| 05000390/FIN-2014005-01 | 2014Q4 | P.3 | Failure to Assure Qualification Testing Met Specified Requirements |
| 05000390/FIN-2014501-01 | 2014Q4 | P.2 | Failure to Maintain Effectiveness of Emergency Plan |
| 05000390/FIN-2015405-01 | 2014Q4 | | Security |
| 05000390/FIN-2014007-01 | 2014Q4 | | Security |