05000390/FIN-2013002-03
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Licensee-Identified Violation |
Description | TS 3.4.12, Cold Overpressure Mitigation System (COMS), requires that COMS must be operable with a maximum of one CCP and no SI pumps capable of injecting into the RCS when in Modes 4, 5, and Mode 6 (when the reactor vessel head is on). On September 21, 2009, WBN entered Mode 4 at 0420 EDT as part of the Cycle 9 RFO. When Mode 4 was entered, two SI pumps and more than one CCP were capable of injecting into the RCS. As a result, LCO 3.4.12 was not met and the applicable required actions were not taken within their associated completion times. Therefore, WBN was in a condition prohibited by the TS. A review of previous operating data revealed this condition also existed on April 4, 2011, when WBN entered Mode 4 at 0454 EDT as a part of the Cycle 10 RFO. This low safety significant adverse condition was captured in the licensees corrective action program as PER 593388. |
Site: | Watts Bar |
---|---|
Report | IR 05000390/2013002 Section 4OA7 |
Date counted | Mar 31, 2013 (2013Q1) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | Licensee-identified |
Inspection Procedure: | |
Inspectors (proximate) | R Monk S Shaeffer K Miller |
Violation of: | Technical Specification |
INPO aspect | |
' | |
Finding - Watts Bar - IR 05000390/2013002 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Watts Bar) @ 2013Q1
Self-Identified List (Watts Bar)
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||