05000387/LER-1983-059, Forwards LER 83-059/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 83-059/03L-0
ML20076D497
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 05/04/1983
From: Keiser H
PENNSYLVANIA POWER & LIGHT CO.
To: Allan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20076D498 List:
References
PLA-1650, NUDOCS 8305230471
Download: ML20076D497 (1)


LER-1983-059, Forwards LER 83-059/03L-0
Event date:
Report date:
3871983059R00 - NRC Website

text

r-PPat P0nnsylvania Pow;r & Light Company Two North Ninth Street

  • Allentown, PA 18101
  • 215 1 77055151 May 4, 1983 Mr.

J.M. Allen Acting Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 SUSQUEHANNA STEAM ELECTRIC STATION LICENSEE EVENT REPORT 83-059/03L-0 ER 100450 FILE 841-23 Docket No.

50-387 PLA-1650 License No.

NPF-14

Dear Mr. Allan:

Attached please find a copy of Licensee Event Report No. 83-059/03L-0.

This event was determined to be reportable per Techncial Specification 6.9.1.9.b, in that analysis of startup test data showed a Main Steam Isolation Valve closing time did not meet Technical Specification limits.

M H.W.

Keiser Superintendent of Plant-Susquehanna APP /pjg cc:

Director of Nuclear Reactor Regulation Attention:

Mr. A.

Schwencer, Chief Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555 G.G.

Rhoads Resident Inspector U.S. Nuclear Regulatory Commission P.O.

Box 52 Shickshinny, PA 18655 ep 8305230471 830504 h

DR ADOCK 05000387 PDR