05000387/LER-1985-001, :on 850213,Zone III (Refuel Floor) Isolated on High Radiation Signal & Standby Gas Treatment Sys & Control Room Emergency Outside Air Supply Sys Started.Cause Unknown. Procedures Revised to Initiate Sys
ML20135H904 | |
Person / Time | |
---|---|
Site: | Susquehanna |
Issue date: | 09/19/1985 |
From: | Crimmins T, Kuczynski L PENNSYLVANIA POWER & LIGHT CO. |
To: | NRC OFFICE OF ADMINISTRATION (ADM) |
References | |
LER-85-001, LER-85-1, PLAS-120, NUDOCS 8509240367 | |
Download: ML20135H904 (3) | |
Similar Documents at Susquehanna | |
---|---|
Category:LICENSEE EVENT REPORT (SEE ALSO AO RO)
MONTHYEAR05000387/LER-1990-005, :on 900203,station Alert Declared When Reactor Coolant Temp Exceeded 200 F Due to Temporary Loss of Normal Method Dhr.Caused by Short Circuit to Ground in Bus Distribution Panel.Circuit Breakers Replaced1990-03-0202 March 1990
[Table view]
1990-03-02 Category:TEXT-SAFETY REPORT MONTHYEARML20217A9931999-09-30030 September 1999
[Table view]NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML17146B1741999-08-0303 August 1999 GL 96-06 Risk Assessment for Sses. ML20206D3331999-04-27027 April 1999 SER of Individual Plant Examination of External Events Submittal on Susquehanna Steam Electric Station,Units 1 & 2. Staff Notes That Licensee IPEEE Complete with Regard to Info Requested by Suppl 4 to GL 88-20 ML20195B2381999-03-31031 March 1999 Redacted Version for 10CFR2.790 Request for Decommissioning Status Rept for Sses,Units 1 & 2 ML17164A8451998-10-31031 October 1998 SSES Unit 1 Tenth Refueling & Insp Outage ISI Outage Summary Rept. ML20236N6751998-07-0909 July 1998 Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps ML20249B9791998-06-24024 June 1998 Safety Evaluation Supporting Amends 177 & 150 to Licenses NPF-14 & NPF-22,respectively ML20217Q4891998-04-21021 April 1998 Rev 1 to Draft LDCN 2482, FSAR Chapter 13.4 & FSAR Chapter 17.2 Changes to Support ITS Implementation ML18026A4931998-03-30030 March 1998 LER 97-007-01:on 971017,entry Into TS 3.0.3 Occurred to Allow Completion of Surveillance Testing of One Channel of Rbm.Caused by Failure of Components in LPRM Output to Rbm. Submitted TS Change Request to Extend LCO Action Statement ML18026A5401998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Susquehanna Steam Electric Station.W/980313 Ltr ML18026A4891997-11-17017 November 1997 LER 97-007-00:on 971017,TS 3.0.3 Entry Voluntarily Made. Caused by Inadequate Post Maint Testing Following Earlier Work Associated W/Components.Failed Components Repaired, Replaced & Testing Completed ML18017A2921997-10-28028 October 1997 1997 Nrc/Fema Observed Exercise. ML17158C1861997-06-0505 June 1997 Proceedings of Intl Topical Meeting on Advanced Reactors Safety Vol II, on 970601-05 ML20140A9661997-05-29029 May 1997 Part 21 Rept Re Ksv Emergency Diesel Generator Power Piston Failure.Caused by Jacket Water in Combustion Chamber. Recommends That Users Verify That Crown Thickness at Valve Cutout Be 100 Minimum ML18026A4781997-03-28028 March 1997 Rev 1 to Application of Anfb to ATRIUM-10 for Susquehanna Reloads. ML20137G6261997-03-25025 March 1997 Svcs Part 21 Rept Re Emergency Generators Installed at Zion Station Which Developed Significant Drop in Crankcase Lube Oil Level.Caused by Crack in Liner Wall,Allowing Jacket Water to Enter Chamber ML20155F7661996-07-25025 July 1996 Partially Deleted Job Number 739619-96, Investigation of E Diesel Breaker Misalignment ML20155F7491996-07-24024 July 1996 Independent Safety Evaluation Svcs Project Rept 3-96, Investigation of E Diesel Generator In-Operability Event ML20117G4641996-05-14014 May 1996 Part 21 Rept Re Cooper Bessemer Reciprocating Products,Div of Cooper Cameron Corp,Issued Ltr to Define Utils/Plants Containing Similar Equipment as Supplied on Cooper Bessemer Ksv & Enterprise Dsr EDGs ML18026A5961996-01-0202 January 1996 LER 95-013-00:on 951119,thermally Induced Pressure Locking of HPCI Valve Occurred Under Bonnet Pressure of 3,000-7,000 Psig.Damaged HPCI Injection Valve repaired.W/960102 Ltr ML20095K5181995-12-18018 December 1995 Safety Evaluation Supporting Amends 155 & 126 to Licenses NPF-14 & NPF-22,respectively ML18017A0511995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for SSES Units 1 & 2. W/951215 Ltr ML20092H7641995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Susquehanna Ses ML17158A8771995-08-15015 August 1995 Exercise Manual. ML17158A8061995-07-14014 July 1995 Books 1 & 2 of ISI Outage Summary Rept SSES Unit 1 8th Refuel Outage. ML18017A0461995-07-0707 July 1995 LER 95-008-00:on 950609,shift Average Licensed Core Thermal Power Was Exceeded.Caused by Failed Instrumentation Drift. Repaired & Recalibrated Subject Instrumentation ML17164A6631995-04-11011 April 1995 Impact of Extending T-10 AOT from 3 to 7 Days. ML17164A5871995-01-31031 January 1995 Monthly Operating Repts for Jan 1995 for Susquehanna Ses ML18026A5351994-10-31031 October 1994 SSES Unit 1 & 2 MSIV Leakage Alternate Treatment Method Seismic Evaluation. W/One Oversize Drawing ML17158A4821994-08-23023 August 1994 ISI Outage Summary Rept Unit 2 6th Refueling Outage, Books 1 & 2 of 2 ML17158A2391994-04-0505 April 1994 Books 1 & 2 of SSES Unit 1 Seventh Refueling & Insp Outage ISI Outage Summary Rept. ML18017A2701993-12-31031 December 1993 PP&L Annual Rept 1993. ML17158A2651993-12-31031 December 1993 Allegheny Electric Cooperative,Inc Annual Rept 1993. ML17158A1631993-12-0909 December 1993 Remote Indication of Spent Fuel Pool Level & Temperature. ML18026A4281993-08-16016 August 1993 PP&L Response to NRC Concerns Re Loss of Spent Fuel Pool Cooling Following Loca,Sses,Units 1 & 2. ML18026A4261993-06-0909 June 1993 LER 90-007-01:on 900705,primary Power Supply to RPS a Power Distribution Panel Lost When One Electrical Protection Assembly (EPA) Breaker Tripped.Epa Logic Cards Reviewed & RPS Power Supply Will Be redesigned.W/930609 Ltr ML17157C2441993-02-28028 February 1993 Monthly Operating Rept for Feb 1993 for Susquehanna Steam Electric Station,Units 1 & 2 ML18017A2031993-02-0101 February 1993 Books 1 & 2 of Unit 2 Fifth Refueling & Insp Outage,Isi Outage Summary Rept. ML20044C2741993-01-31031 January 1993 Corrected Monthly Operating Rept for Jan 1993 for Susquehanna Steam Electric Station,Unit 2,consisting of Info on Unit Shutdowns & Power Reductions ML17157C3691992-12-31031 December 1992 PP&L Annual Rept 1992. ML20056C3941992-12-31031 December 1992 Allegheny Electric Cooperative,Inc Annual Rept 1992 ML18017A0421992-12-14014 December 1992 Suppl to 921127 Part 21 Rept Re High Air Concentration in Reactor Bldg Making Area Uninhabitable for Retrieving Air Filters,Per NUREG-0737,Item II.F.1.Util Current Position Re Fuel Pool Cooling Issues Contrary to Reg Guide 1.3 ML18026A2481992-11-27027 November 1992 Part 21 Rept Re Substantial Safety Hazard in Design of Facility for Loss of Normal Spent Fuel Pool Cooling ML18026A4231992-11-17017 November 1992 LER 92-016-00:on 920416,discovered That Existing Analysis for Two Spent Fuel Storage Pools Did Not Reflect Current Fuel Design & Plant Operation.Caused by Failure to Modify FSAR Analysis.Fsar Will Be revised.W/921117 Ltr ML17157C1421992-10-21021 October 1992 Engineering Assessment of Fuel Pool Cooling Piping EDR-G20020. ML17157C1411992-08-31031 August 1992 Loss of Fuel Pool Cooling Event Evaluation. ML17157C1401992-08-31031 August 1992 Review of Fuel Pool Cooling During Postulated Off-Normal & Accident Events SSES Units 1 & 2. ML20082C4941992-08-14014 August 1992 Evaluation of Unit 1 & Unit 2 Derating of Power Cables in Raceways Wrapped W/Thermo-Lag Matl ML17157C1381992-07-27027 July 1992 Safety Consequences of Boiling Spent Fuel Pool at Susquehanna Steam Electric Station. ML17157B9331992-07-24024 July 1992 Sixth Refueling & Insp Outage Inservice Insp Outage Summary Rept, Books 1 & 2 1999-09-30 |
Event date: | |
---|---|
Report date: | |
Reporting criterion: | 10 CFR 50.73(a)(2)(iv), System Actuation |
3871985001R00 - NRC Website | |
text
J U S NUCLE AR KEGULATORY COMMISEtON NRCForm308
'S 43i APPRowiD Owe 40 31to-0104 LICENSEE EVENT REPORT (LER)
P A U' 5 3' 8 ACILITY N AME til DOCKET NUMgER 821 Susauchanna Steam Electric Station - Unit 1 0151010 l 0 l 3lg l 7 1 lOFfg l9 (IYLE 14:
SGTS Start on Refuel Floor High Radiation Signal.
EVENT DATE Ill LER NUh80ER 141 REPORT DATE (M OTHER F ACILITIES INVOLVED 681 UONTM DAY VEAR VEAR Iu"M UONTM OAV TEAR
' AC' Lit y % awe S DOCM E7 Nvv8ER:$.
SE i'
R 0 151010101 I I 0l2 1l3 8'5 8l5 0l0l1 0 l1 0 l9 1l9 8l5 0 1 5 ! 0 1 0 1 0 1 1 I TMis REPOAT IS $UeMITTED PURSUANT TO TME REQUIREMENTS OF 10 CFR j #Chece oae er more of rae 'o**+s; li t t OPE R ATING 5
20 *02=>
20 mm x
so n=H2H~i n"*'
20 40GisH1H4 50 36tellip 60 73<eH2Het 7 3 711st POvvE R LEVEL e. e. e,,s,w,., uC,e<,
.O n eH2H..i OTME R <
.,,A,,
41 0)
O! 01 0 20 *0sioin H*>
so wieH2i
,,, To.
,e 20 40Siell1HM 60 73'e42H4 60 73+eH2Hemil Al JtF6 A 7 i
20 406telt1Hwl 90 73iest2H.I 60 73:eil2ilm.Hel 20 408teH1)le) 90 734H2Ho.)
to 73ieH2Het LICENSEE CONT ACT FOR TMis LE R 1125
%AME TELEPmCNE NLYgER ARE A COCE L.A. Kuczynski - Nuclear Plant Specialist, Level III 7l117 5 I412 l-l31715l9 COMPLETE ONE LINE FOR E ACM COMPONENT F AILURE DESCRISED IN TMis REPORT (13
,'O "I'\\"ea O WA 8AC REP Af A$d S E C AL,5E Sv 5TEY COvPONENT CAv5E SYSTEw CQwPONENT g
pac $
7O X
BlH IFI AIN B1 S I 115 N
I
! I i
! I I I
l 1 1 I I I I
I I I i l t SUPPLEMENTAL REPORT E XPECTED 11 As MONTM Dav VEAR
$L 8 v's$ ION en canoere EXPECTED Sv0MI53tO% CATER
%O l
l l
YES tife A sTR ACT s-,,e re <.
- e,-.-ew ~., e.,-e,,,e-eme., n.,
On February 13, 1985, with the Unit shutdown for its first refueling outage, actions ccrmenced to remove the steam dryer frcm the reactor vessel. 'Ihe maintenance procedure used to move the dryer included steps for the installation of ju:rpers in the refuel floor wall duct trip units. 'Ihis would forestall a Zone III (Refuel Floor) ventilation isolation and conccmitant start of the Standby Gas Treatment System (SGTS) and Control Rocm Emergency Outside Air Supply System (CREASS) under circumstances where it is known that conditions other than airborne radiation would cause the-isolation or systems to start.
(SGIS and CREAOSS are Engineered Safety Features.)
Khen the steam dryer move was ccuplete, the jumpers were rmoved per the maintenance procedure. Within two minutes, Zone III had isolated on a high radiation signal and the SGTS and CPEASS started. The jumpers were replaced and all systm s restored to normal status. Station particulate, iodine and noble gas nonitor data showed no abnormal release rates for the day.
Procedure changes have been inplesmnted to initiate SGTS and CRE0 ASS prior to moving the steam dryer. Mditional actions will be evaluated.
- /
/
8509240367 850919 PDR ADOCK 05000387
/4 S
PDR i
W.RC Form 386 89 831
I t%C form 364A U S NUCLEAR REGULATORY COMMISSiOm LICENSEE EVENT REPORT (LER) TEXT CONTINUATION APPROVED 098 No U50-0W E R PIR E S 873111$
FACsuTV 4AME m DOCKET muuaER (21 LER NUMeER 133 PAGE(3)
Susquehanna Steam Electric Station
" 50.
W,W vEaa Unit 1 o ls to lo jo l 3l 8l 7 8l5 0l0j1 0l1 0l 2 or 0 l2 rm a mne, ass.nm On February 13, 1985, with the Unit shutdown for its first refueling outage, actions comenced to remove the steam dryer frun the reactor vessel. The nuintenance procedure used to move the dryer included steps for the installation of jumpers in the refuel floor wall duct trip units. (The corresponding sensors on Unit 2 rmained operable throughout the event.)
The intent of this action was to forestall a Zone III (Refuel Floor) ventilation isolation and concanitant start of the Standby Gas Treatment Systs (SGTS)
(EIIS Code: BH) and Control Roan Emrgency Outside Air Supply Systen (CRECASS)
(BH) under circumstances where it is known that conditions other than airborne radiation m uld cause the isolation or systems to start.
(The SGIS and CRECASS are Engineered Safety Features.) The strongback used to move the dryer has a sprinkling system installed on it and there is a sprinkling system in the dryer-separator pool to muumize airborne radiation.
Khen the steam dryer move was catplete, the jtrpers were removed per the maintenance procedure. Within two minutes, Zone III had isolated cn a high radiation signal and the SGTS and CREASS started. Operations personnel directed that the jumpers be reinstalled based on the deduction that the steam dryer was acting as a source large enough to affect the sensors in the_ Zone III exhaust duct. CRECASS was shutdown, nornal Zone III ventilation was re-established and SGTS was shutdown. Station particulate, iodine and noble gas monitor data showed no abnormal release rates for the day.
All systen logic functioned properly except that the Reactor Building Recirculation Fans did not start.
(These fans act to recirculate the air within the ventilation zones to reduce radioactivity concentrations by mixing the air before it is exhausted through the Standby Gas Treatment System.)
Investigation into the lack of fan start showed no problens and sinulated conditions resulted in correct logic sequencing including the start of the Fecirculation Fans.
The maintenance procedure used to control transfer of the steam dryer has been revised to initiate the SGTS and CREQASS in a controlled manner.
Additionally, engineering evaluations will be completed to determine the feasibility of shielding the radiation monitors or altering their trip function to assure their actuation on true high airborne radiation indication.
LER's 85-010-00 and 85-020 describe additional occurrences of SGTS and CRECASS actuations due to ' shine'.
- g o o u..
PPaL
.Pcnnsylvania Power & Light Company Two North Ninth Street
- Allentown, PA 18101 e 2151 7705151 September 19, 1985 4
U.S. Nuclear Regulatory Camission Document Control Desk washington, DC 20555 SUSQUEHANNA STF#1 ELECTRIC STATION
. LICENSEE EVENT REPORT 85-001-01 ER 100450 FILE 841-23 PIAS-120 Docket No.
50-337 License No. NPF-14 Attached is Licensee Event Report 85-001-01. This event was determined reportable per 10CFR50.73(a) (2) (iv), in that the Unit experienced an unanticipated start of the Standby Gas Treatment and Control Rocm Dnergency Outside Air Supply Systers, which are Engineered Safety Systens.
= = m e
T.M.
Irmins, Jr.
Superintendent of Plan -Susquehanna IAK/Pj9 cc:
Dr. Thcnus E. Murley Regional Adninistrator, Region I U.S. Nuclear Regulatory Ccamission 631 Park Avenue King of Prussia, PA 19406 Mr. R.H. Jacobs Senior Resident Inspector U.S. Nuclear Regulatory Ccamission P.O. Box 52 Shickshinny, PA 18655 ff l