| Q | CCA | Title |
---|
05000387/FIN-2014002-01 | 2014Q1 | | Adequacy of Compensatory Measures to Restore Technical Specification Operability |
05000388/FIN-2014002-02 | 2014Q1 | | Reactor Scram due to Loss of Reactor Feed Pumps |
05000387/FIN-2014009-02 | 2014Q2 | H.3 | Failure to Conduct Timely Initial Operability Determinations |
05000387/FIN-2014003-03 | 2014Q2 | | Implementation of Enforcement Guidance Memorandum (EGM) 11-003, Revision 2 |
05000387/FIN-2014009-03 | 2014Q2 | H.14 | Failure to Correct Condition Adverse to Quality Related to Fatigue Stress in ESW Supply Lines to RHR Pump Motor Oil Cooler |
05000387/FIN-2014009-01 | 2014Q2 | H.13 | Inadequate Corrective Actions for Degraded ESW and RHRSW Piping |
05000387/FIN-2014003-01 | 2014Q2 | P.3 | Failure to Identify Conditions Adverse to Quality due to Untimely Actions to Address Extent of Condition |
05000387/FIN-2014009-04 | 2014Q2 | P.3 | Failure to Take Action to Restore Degraded Emergency Action Level Scheme |
05000388/FIN-2014008-01 | 2014Q3 | H.3 | Inadequately Maintained Procedures for Plant Shutdown to Hot Standby led to Reactor Water Level and Power Transients |
05000387/FIN-2014004-02 | 2014Q3 | H.2 | RRP Trip due to Incorrect Calibration of MG Set High Temperature Trip Setpoint |
05000387/FIN-2014004-01 | 2014Q3 | | Adequacy of Guidance to an Emergency Plan Procedure Change |
05000387/FIN-2014004-03 | 2014Q3 | | Adequacy of Secondary Containment and Standby Gas Treatment System Testing |
05000387/FIN-2014005-01 | 2014Q4 | H.5 | Risk Management Actions Not Implemented |
05000387/FIN-2014005-03 | 2014Q4 | | Failure to Submit an LER |
05000387/FIN-2014005-02 | 2014Q4 | H.13 | Emergency Preparedness Drill Critique Did Not Identify a Risk-Significant Planning Standard Weakness |
05000387/FIN-2014403-01 | 2014Q4 | | Security |
05000387/FIN-2014005-04 | 2014Q4 | P.2 | EPA Breaker Under Frequency Setpoint Drift |