05000361/FIN-2011003-07
From kanterella
Jump to navigation
Jump to search
Finding | |
|---|---|
| Title | Licensee-Identified Violation |
| Description | Technical Specification 3.3.7, Diesel Generator Undervoltage Start, requires that four channels of loss of voltage function and four channels of degraded voltage function auto-initiation instrumentation per diesel generator be operable. Contrary to the above, from January 28 to April 8, 2011, Unit 3 was operated with one or two train B 3A0615 loss of voltage signal channels inoperable for a period of time longer than allowed by Technical Specification 3.3.7. This issue was entered into the licensees corrective action program as Nuclear Notifications NNs 201410580 and 201412748. |
| Site: | San Onofre |
|---|---|
| Report | IR 05000361/2011003 Section 4OA7 |
| Date counted | Jun 30, 2011 (2011Q2) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | Licensee-identified |
| Inspection Procedure: | |
| Inspectors (proximate) | C Alldredge C Osterholtz E Uribe G Guerra G Warnick J Reynoso J Tapp J Watkins N Greene P Elkmann R Lantz S Achen S Hedger Z Hollcraft |
| INPO aspect | |
| ' | |
Finding - San Onofre - IR 05000361/2011003 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (San Onofre) @ 2011Q2
Self-Identified List (San Onofre)
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||